South Central Railway - Andhra Pradesh

40634271 supply of fluorescent paint stick white colour, dia 15mm and length 150mm for the use of poh marking particulars as per wap specificationn no. wap/m/specn 1/055/1994.alt afluorescent paint stick white colour, dia 15mm and length 150mm for the use of poh marking particulars as per wap specificationn no. wap/m/specn 1/055/1994.alt a,fluorescent paint stick white colour, dia 15mm and length 150mm for the use of poh marking particulars as per wap specificationn no. wap/m/specn 1/055/1994.alt a [ warranty period: 30 months after the date of delivery ] => limited...

Indian Navy - Andhra Pradesh

33595373 tender for normal refit of in ship 1.0001 work pakage for nr in asset hull defect list 001 docking vessel to be docked in both versions. note 1: firms not to quote view docking, undocking and dock blocks preparation will be done by navy and the job is required to be carried out in navy premises ( i.e nd ( v ) slipway / drydock ) . note 2: last docked in version i on 04 oct 2018 1.0002 002 cleaning of under water hull and boot top area hp jet cleaning of entire under water area and boot top area ( with a pressure not exceeding 3000 psi ) remove the marine growth / barnacles and prepare for survey. note: ( i ) u / w area: 415 including boot top 1.0003 003 cleaning of internal compartments fw tanks ( 06 nos ) manually clean fuel tanks free of accumulated fuel and residual muck and present for survey. 1.0004 004 cleaning of internal compartments manually clean following internal compartments free of accumulated water and residual muck and present for survey. ( a ) cable locker 1.0005 004 cleaning of internal compartments manually clean following internal compartments free of accumulated water and residual muck and present for survey. ( b ) forepeak tank 1.0006 004 cleaning of internal compartments manually clean following internal compartments free of accumulated water and residual muck and present for survey. ( c ) cofferdam 1.0007 004 cleaning of internal compartments manually clean following internal compartments free of accumulated water and residual muck and present for survey ( d ) bosun store, naval store and paint store 1.0008 005 cleaning of internal compartments manually clean fresh water gravity tank for free of accumulated water and residual muck and present for survey. 1.0009 006 cleaning of internal compartments manually clean sea water gravity tank for free of accumulated water and residual muck and present for survey. 1.001 007 cleaning of internal compartments manually clean following internal compartments free of accumulated oily water and grime / muck and present for survey: ( g ) pump room ( bilges: 120 sqm, bulkheads: 95 sqm ) 1.0011 008 cleaning of internal compartments asp manually clean following internal compartments free of accumulated oily water and grime / muck and present for survey: steering gear room ( bilges: 24 sqm, bulkheads:76 sqm ) 1.0012 009 cleaning of above water area hp jet cleaning of entire above water area ( with pressure not exceeding 3000 psi ) remove the dirt and salt contamination 1.0013 010 cleaning of super strcture hp jet cleaning of entire super strcture arae ( with pressure not exceeding 3000 psi ) remove the dirt and salt contamination 1.0014 011 cleaning of weather deck hp jet cleaning of entire weather deck ( with pressure not exceeding 3000 psi ) remove the dirt and salt contamination 1.0015 012 hull survey external and internal structures ( a ) hull survey. carry out visual and hammer survey in accordance with no 01 / 15 of under water hull , boot top area, above water hull, super structure, weather decks and all internal compartments ( i.e. fw tanks, ballast tanks, fore peak tank, engine room, steering compartment, fo tanks, cofferdams, all stiffeners and deck fittings etc. ) all manholes to be inspected for water tightness, chalk impression test to be carried out. note: ( i ) ls for survey ( ii ) firm to submit 07 copies of hull survey report . 1.0016 013 utg survey carry out utg survey in thge presence of qc representatives of u / w hull, ship side, superstrcture, weather deck, bulkheads, tanks, living spaces covering entire part of hull. firm to submit 07 copies of hull survey report. 1.0017 014 steel renewal quote for steel renewal at various locations as per survey report note : quoted repair cost shall include cost of both sides blasted and primed is 2062 grade `b’ quality steel. degutting / regutting / renewal of all obstructions in way of steel renewals including lagging / panelling, minor fittings / equipments with their foundations, ventilation systems, staging etc., as indicated by survey team / rmt, proving of the weld runs by non destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal was undertaken etc. 1.0018 015 build ups ( a ) carry out build ups as indicated by the hull survey team / surveyor size 25 x 25 mm 1.0019 015 build ups ( b ) carry out build ups as indicated by the hull survey team / surveyor size 50 x 50 mm 1.002 016 fairing of deformed structure carryout fairing of deformed structures as indicated by hull survey team / surveyor 1.0021 017 re welding carry out re welding runs on weld seams as indicated by hull survey team / qc / rmt. 1.0022 018 draft marks draught marks corroded / eaten away, to be renewed and painted. both roman and numeric. 1.0023 019 sacrificial anodes ( a ) renew sacrificial anodes those consumed more than 50% type: mk i note: anodes will be supplied by navy / coy. 1.0024 019 sacrificial anodes ( b ) renew sacrificial anodes those consumed more than 50% type: mk vi note: anodes will be supplied by navy / coy. 1.0025 020 surface preparation under water area surface preparation to sa 2.5 std using grit blasting on paint damaged areas / renewed plate areas as per the paint oem rep recommendation for paint application. 1.0026 021 painting under water area jotun scheme. paint under water area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( a ) 1st coat: primer penguard primer 50 microns 1.0027 021 painting under water area jotun scheme. paint under water area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( b ) 2nd coat: anti corrosive jotacote universal ( aluminium ) 150 microns 1.0028 021 painting under water area jotun scheme. paint under water area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( c ) 3rd coat: anti corrosive jotacote universal ( grey ) 150 microns 1.0029 021 painting under water area jotun scheme. paint under water area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( d ) 4th coat: tie coat: safeguard es 125 microns 1.003 021 painting under water area painting jotun scheme. paint under water area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( e ) 5th coat: a / f: seaquantum ultra ( brown / light red ) 150 microns 1.0031 021 painting under water area jotun scheme. paint under water area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( f ) 6th coat: a / f: seaquantum ultra ( red brown / dark red ) 150 microns 1.0032 021 painting under water area jotun scheme. paint under water area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( g ) 7th coat: a / f: seaquantum ultra ( brown / light red ) 150 microns 1.0033 021 painting boot top area jotun scheme. paint boot top area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( h ) 8th coat: a / f: seaquantum ultra ( black ) 150 microns dft 1.0034 022 surface prepartion above water area and bulwark including guardrails carry out surface prepartion to sa2.5 using grit blasting standard for paint application as per survey report by paint oem rep 1.0035 023 painting above water area and bulwark including guardrails jotun scheme. paint above water area with following paint scheme.note: quoted repair cost shall be inclusive of cost of paints also ( a ) 1st coat: penguard primer 50 microns dft 1.0036 023 painting above water area and bulwark including guardrails jotun scheme. paint above water area with following paint scheme.note: quoted repair cost shall be inclusive of cost of paints also ( b ) 2nd coat: jotamastic 80 ( grey / red brown ) 125 microns dft 1.0037 023 painting above water area and bulwark including guardrails jotun scheme. paint above water area with following paint scheme.note: quoted repair cost shall be inclusive of cost of paints also ( c ) 3rd coat: jotamastic 80 ( grey / red brown ) 125 microns dft 1.0038 023 painting above water area and bulwark including guardrails jotun scheme. paint above water area with following paint scheme.note: quoted repair cost shall be inclusive of cost of paints also ( d ) 4th coat: hard top xp grey 60 microns dft 1.0039 024 surface prepartion super structure and deck fittings carry out surface prepartion to st3 standard for paint application as per survey report by paint oem rep . 1.004 025 painting super structure and deck fittings jotun scheme. paint superstructure area with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( a ) 1st coat: primer penguard primer 50 microns dft 1.0041 025 painting super structure and deck fittings jotun scheme. paint superstructure area with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also ( b ) 2nd coat: jotamastic 80 ( red ) 125 microns dft 1.0042 025 painting super structure and deck fittings jotun scheme. paint superstructure area with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also ( c ) 3rd coat: jotamastic 80 ( grey ) 125 microns dft 1.0043 025 painting super structure and deck fittings jotun scheme. paint superstructure area with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also ( d ) 4th coat: hard top xp grey 7040 60 microns dft 1.0044 026 surface prepartion weather decks carry out hydro jet blasting of entire weather deck, bridge deck and flag deck to wj 2 standards. 1.0045 027 painting paint weather decks jotun scheme. paint weather decks with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( a ) 1st coat: primer penguard primer 50 microns dft 1.0046 027 painting paint weather decks jotun scheme. paint weather decks with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( b ) 2nd coat: jotamastic 87 150 microns dft 1.0047 027 painting paint weather decks jotun scheme. paint weather decks with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( c ) 3rd coat: jota armour 800 microns dft 1.0048 028 surface prepartion internal compartments fore peak tank, cable locker, bosun store , naval store , paint store and cofferdam carry out mechanical cleaning to st 3 standard as per survey report of paint oem for fore peak tank , cable locker and cofferdam ( 04 ) . 1.0049 029 painting fore peak tank, cable locker, bosun store , naval store , paint store and cofferdam jotun scheme. paint fore peak tanks, ballast tanks and cable locker with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( a ) 1st coat: primer penguard primer 50 microns dft 1.005 029 painting fore peak tank, cable locker, bosun store , naval store , paint store and cofferdam jotun scheme. paint fore peak tanks, ballast tanks and cable locker with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also ( b ) 2nd coat: anticorrosive balloxy hb light ( bieze ) 150 microns 1.0051 029 painting fore peak tanks, ballast tanks and cable locker jotun scheme. paint fore peak tanks, ballast tanks and cable locker with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also ( c ) 3rd coat: anticorrosive balloxy hb light ( grey ) 150 microns 1.0052 030 surface prepartion internal compartments bilges of pump room and asp compartment including bulkheds carry out mechanical cleaning to st 3 standard as survey report of paint oem for paint application. ( i ) pump room & asp ( bilges 315 sqm, ) 1.0053 031 painting machinery bilges jotun scheme. paint bilges of pump room and asp compartment with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( a ) 1st coat: primer penguard primer 50 microns dft 1.0054 031 painting machinery bilges jotun scheme. paint bilges of pump room and asp compartment with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( b ) 2nd coat: anticorrosive jotacote universal ( aluminium ) 150 microns 1.0055 031 painting machinery bilges jotun scheme. paint bilges of pump room and asp compartment with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( c ) 3rd coat: anticorrosive jotacote universal ( grey ) 150 microns 1.0056 031 painting machinery bilges jotun scheme. paint bilges of pump room and asp compartment with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( d ) 4th coat: penguard top coat 50 microns. 1.0057 032 painting bulkheads of pump room and asp jotun scheme. paint bulkheads and deckheads of pump room and asp compartments with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( a ) 1st coat: primer penguard primer 50 microns dft 1.0058 032 painting bulkheads of pump room and asp jotun scheme. paint bulkheads and deckheads of pump room and asp compartments with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( b ) 2nd coat: interior fire retardent paint 100 microns 1.0059 032 painting bulkheads of pump room and asp jotun scheme. paint bulkheads and deckheads of pump room and asp compartments with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( c ) 3rd coat: interior fire retardent paint 100 micron 1.006 033 cleaing of ru tanks cleaning of fuel oil ru tanksmanually scrap and clean to bare metal and apply two coats of om 750 oil in following tanks: fuel oil ru tanks ( 02nos ) note: quoted cost shall be inclusive of cost of oil also. 1.0061 034 surafce prepartion bulkheads, decks and dadoes of internal compartments carry out mechanical cleaning of ( deck store, rec room , prov store and crew room stores, battery stores, co2 room, paint stores, pump store, deck store and eletrical control room ) to st 3 standard as survey report of paint oem for paint application. 1.0062 035 painting internal compartments decks and dadoes jotun scheme. carry out painting of internal compartments decks and dadoes at following locations: naval store, battery store, co2 room, paint store, pump store, deck store and eletrical control room. ( a ) 1st coat: primer penguard 1x50 microns 1.0063 035 painting internal compartments decks and dadoes jotun scheme. carry out painting of internal compartments decks and dadoes at following locations: naval store, battery store, co2 room, paint store, pump store, deck store and eletrical control room. ( b ) 2nd coat : jotamastic 80 grey 1 x 150 microns 1.0064 035 painting internal compartments decks and dadoes jotun scheme. carry out painting of internal compartments decks and dadoes at following locations: naval store, battery store, co2 room, paint store, pump store, deck store and eletrical control room. ( c ) 3rd coat ; burnswick green finishing paint 100 microns 1.0065 036 painting internal compartments bulkheads jotun scheme. carry out painting of internal compartments bulkheads and deck heads area at following locations: naval store, battery store, co2 room, paint store, pump store, deck store and eletrical control room. ( a ) 1st coat: primer penguard 1x50 microns 1.0066 036 painting internal compartments bulkheads jotun scheme. carry out painting of internal compartments bulkheads and deck heads area at following locations: naval store, battery store, co2 room, paint store, pump store, deck store and eletrical control room. note: quoted repair cost shall be inclusive of cost of paints also. ( b ) 1st coat: interior fire retardent paint 100 microns 1.0067 036 painting internal compartments bulkheads jotun scheme. carry out painting of internal compartments bulkheads and deck heads area at following locations: naval store, battery store, co2 room, paint store, pump store, deck store and eletrical control room. note: quoted repair cost shall be inclusive of cost of paints also. ( c ) 2nd coat: interior fire retardent paint 100 microns 1.0068 037 surface preaprtion fw tanks carry out surface preaprtion to st 3 standards of fw tanks as survey report of paint oem for paint application. 1.0069 038 painting fw tanks jotun paint scheme paint all sullage tanks with following paint scheme: ( a ) penguard hb 100 microns 1.007 038 painting fw tanks jotun paint scheme paint all sullage tanks with following paint scheme: ( b ) penguard hb 100 microns 1.0071 038 painting fw tanks jotun paint scheme paint all sullage tanks with following paint scheme: ( c ) penguard hb 100 microns 1.0072 039 anchor and anchor chain cable. anchor and anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at ndv / mfab dept. paint with black bituminous paint post survey iaw no 12 / 2001 and refit back. note : the job involves removal of anchors, chain cables and accessories, laying out for cleaning, painting and refitment. ( a ) anchors 03 1.0073 039 anchor and anchor chain cable. anchor and anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at ndv / mfab dept. paint with black bituminous paint post survey iaw no 12 / 2001 and refit back. ( b ) chain cable ( dia 17.5mm ) ( i ) full shackles 08 ( ii ) half shackles 04 1.0074 039 anchor and anchor chain cable. anchor and anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at ndv / mfab dept. paint with black bituminous paint post survey iaw no 12 / 2001 and refit back. ( c ) swivel piece 1.0075 039 anchor and anchor chain cable. anchor and anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at ndv / mfab dept. paint with black bituminous paint post survey iaw no 12 / 2001 and refit back. ( d )  lug less joining shackles 1.0076 039 anchor and anchor chain cable. anchor and anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at ndv / mfab dept. paint with black bituminous paint post survey iaw no 12 / 2001 and refit back. ( e ) d shackles 1.0077 039 anchor and anchor chain cable. anchor and anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at ndv / mfab dept. paint with black bituminous paint post survey iaw no 12 / 2001 and refit back. ( f ) chain stopper / compressor 1.0078 040 anchor windlass completely strip & overhaul anchor windlass, renew brake linings, refit and prove for satisfactory operation. quoted price to include cost of liners and spares also. 1.0079 041 bollards ( b ) bollards and foundatiosn corroded and thinned. to be repaired / renewed as per hull survey report. doubler plate area 420mmx420mm, dia of pipe 219.1mm, height 1460mm, foundation area 400mmx400mmx90mm, thickness of plate 10mm towing gear securing rod dia 50mm. 1.008 042 guardrails ( a ) fixed verticals guardrail stanchions on weather deck deformed / bent from deck. to be renewed. ( mat ms angle bar ) 1.0081 042 guardrails ( b ) fixed horizontal guardrails on weather deck deformed / bent to be renewed. ( mat ms ) 1.0082 043 metallilc chain guardrails metallic chain guardrails of stanchions corroded to chipped and cleaned. renewal cost should include cost of material also. 1.0083 044 sanitry sysytem soil pipes to be removed, chemically cleaned, pressure tested and fitted back in situ. mat: ms , dia: 04inch. ( pressure: 3kg / cm2 ) 1.0084 045 ventilation ( a ) mushroom type natural exhaust ventilator to be removed, cleaned / overhauled and fitted back. ventilator mesh to be renew. prove for satisfactory operation. details mush room head dia 500 mm, height 1550 mm 1.0085 045 ventilation ( b ) mushroom type forced supply ventilator to be removed, cleaned / overhauled and fitted back. ventilator mesh to be renew. prove for satisfactory operation. details mush room head dia 370 mm, height 1550 mm, 1.0086 046 drainage system drain pipe leading from mast deck to 01 deck and no. 1 deck to engine room corroded, thinned and holed, to be renewed. mat: gi, 03 inch dia. 1.0087 047 sanitry system sanitry fittingss in crew bathrooms and wc. ( a ) ss wash basin to be renewed. note: quoted cost shall include cost all items / spares. ( a ) wash basin 1.0088 047 sanitry system sanitry fittingss in crew bathrooms and wc. sanitry fittings in crew bathrooms and wc to be renewed. ( b ) provision ss tap: 1 / 2 inch 1.0089 047 sanitry system sanitry fittingss in crew bathrooms and wc. ( c ) ss supply pipeline broken / damaged to be renewed. mat : cu ni, dia: ½ inch 1.009 047 sanitry system sanitry fittingss in crew bathrooms and wc. ( d ) drain pipeline broken / damaged to be renewed. mat ms, dia 2 inch 1.0091 047 sanitry system sanitry fittingss in crew bathrooms and wc. ( e ) wc ( mat ceramic ) and flush valves to be renewed. mat brass, dia 2 1.0092 048 fresh water system crew bathrooms and wc. .note: quoted cost shall include cost all items / spares. ( a ) ss stop cock 1’’ to be renewed 1.0093 048 fresh water system crew bathrooms and wc. ( b ) shower head to be fitted in bathrooms note: quoted repair cost shall include cost all items / spares. 1.0094 049 tyre fenders tyre fender damaged on p&s side , to be renwed with used automobile tyre fenders moulded with 8 mm white natural rubber. mat rubber, colour white . no painting or coating of any other form will be permitted. vendors to adhere to sow ( a ) od 750mm; id 450 mm , width 250 mm 1.0095 049 tyre fenders provision of securing arrangment in all tyre fenders for fitment on ship side. ( b ) chain securing brackets / deck eyes. 1.0096 049 tyre fenders provision of securing arrangment in all tyre fenders for fitment on ship side ( c ) provission of securing chain. 16 mm dia for tyre fenders 1.0097 049 tyre fenders provision of securing arrangment in all tyre fenders for fitment on ship side ( d ) bush for passing chain on tyres. 1.0098 049 tyre fenders provision of securing arrangment in all tyre fenders for fitment on ship side ( e ) provision of d shackles for tyre fenders 1.0099 050 d shape fenders ( a ) d shaped rubber fenders damaged / perished to be renewed. color grey / white length 1000 mm length location 35 on shipside and 05 on transom material epdm rubber as per nes170 1.01 050 d shape fenders securing brackets ( b ) fender securing flat bar brackets to be repaired / renewed as necessasry. ( mat ms ) . size : 1100mm x 110mm x 08mm 1.0101 050 d shape fenders securing brackets ( c ) fender securing c clamp brackets to be repaired / renewed as necessasry. ( mat ms ) . size : 200mm x 110mm x 08mm 1.0102 051 sky light ss butterfly nuts and tumbler bolt of engine room sky light &exhaust flaps broken. to be renewed. dia of bolt : 10 mm & 6 inch length ( mat ms ) . 1.0103 054 rubber beading rubber beading of following doors, hatch and skylight perished / cracked to be renewed and chalk test to be proved. ( epdm rubber with shore hardness 50 + 5o a ) ( a ) wt door 1.0104 051 rubber beading rubber beading of following doors, hatch and skylight perished / cracked to be renewed and chalk test to be proved. ( epdm rubber with shore hardness 50 + 5o a ) ( b ) wt hatch 1.0105 052 apt air pressure test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg / cm2. note: apt and proving of those tanks wherein steel renewal undertaken as part of steel renewal dl. 0003 ( c ) above is that of firms liability with no additional cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this dl. serial. ( a ) forepeak tanks 1.0106 052 apt air pressure test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg / cm2. note: apt and proving of those tanks wherein steel renewal undertaken as part of steel renewal dl. 0003 ( c ) above is that of firms liability with no additional cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this dl. serial. ( b ) fw tanks 1.0107 052 apt air pressure test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg / cm2. note: apt and proving of those tanks wherein steel renewal undertaken as part of steel renewal dl. 0003 ( c ) above is that of firms liability with no additional cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this dl. serial. ( c ) void space and cofferdam 1.0108 052 apt air pressure test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg / cm2. note: apt and proving of those tanks wherein steel renewal undertaken as part of steel renewal dl. 0003 ( c ) above is that of firms liability with no additional cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this dl. serial. ( d ) cable locker 1.0109 053 bilge paltform ( a ) renew bilge platform plate. material aluminium chequerd plate, thickness 05 mm 1.011 053 bilge platform ( b ) supporting brackets to be renewed where ever required ( mat ms ) . securing nut&bolts to be of mat ss. 1.0111 054 cleats ms cleats perished / thinned to be renewed ( size 28 mm ) . quote shall includes nuts bolts and associated accessories 1.0112 055 ventilation system ( a ) breather pipes of various tanks on upper deck corroded and thinned including wire mesh, to be repaired / renewed. ( mat. gi pipe ) pipe dia 2 1 / 2 inch 1.0113 055 ventilation system ( b ) deck distance piece and flanges corroded to be renewed including rubber joints. dia 150mm 1.0114 055 ventilation system ( c ) ventilation trunking wire mesh to be renewed at damaged areas. size: 400mmx600mm 1.0115 056 deck underlay dry compatments deck underlay ( macrotech ) to be repaired / renewed at uprooted / damaged / steel renewed, accommodation areas, wheel house and alleways. ( a ) surface preparation and application of erop. and mass 98. 1.0116 056 deck underlay dry compatments deck underlay ( macrotech ) to be repaired / renewed at uprooted / damaged / steel renewed, accommodation areas, wheel house and alleways.. ( b ) surface preparation to be carried out by buffing on mass 98 and application of mass 96. 1.0117 056 deck underlay dry compatments deck underlay ( macrotech ) to be repaired / renewed at uprooted / damaged / steel renewed, accommodation areas, wheel house and alleways.. ( c ) surface preparation and application of sealer coat on entire area 1.0118 057 deck underlay wet compartments deck underlay ( macrotech ) to be repaired / renewed in bathrooms at uprooted / damaged / steel renewed. ( a ) surface preparation and application of erop. and mass 98. 1.0119 057 deck underlay wet compartments deck underlay ( macrotech ) to be repaired / renewed in bathrooms at uprooted / damaged / steel renewed. ( b ) surface preparation to be carried out by buffing on mass 98 and application of mass 96. 1.012 057 deck underlay wet compartments deck underlay ( macrotech ) to be repaired / renewed in bathrooms at uprooted / damaged / steel renewed. ( c ) surface preparation and application of sealer coat on entire area 1.0121 058 deck underlay dadoe area deck underlay ( macrotech ) to be repaired / renewed in bathrooms. ( a ) surface preparation and application of erop. and mass 98. 1.0122 058 deck underlay dadoe area deck underlay ( macrotech ) to be repaired / renewed in bathrooms. ( b ) surface preparation to be carried out by buffing on mass 98 and application of mass 96. 1.0123 058 deck underlay dadoe area deck underlay ( macrotech ) to be repaired / renewed in bathrooms. ( c ) surface preparation and application of sealer coat on entire area 1.0124 059 wt hatches wt hatch clips to be removed, cleaned, greased and refitted wt hatch ( 0.6m x 0.6m ) 1.0125 059 wt doors wt door clips to be removed, cleaned, greased and refitted wt doors 1.0126 060 nwt nwt wooden door of wheel house perished, to be repaired / renewed including cylindrical door lock. 1.0127 061 manhole rubber joints perished, to be renewed ( a ) joints 1.0128 061 manhole ( b ) studs of manholes perished, to be renewed ( only defective studs to be renewed as per survey report ) ms studs with nut, size 20 mm 1.0129 061 manhole ( c ) manhole covers corroded / thinned. to be renewed. mat is 2062 grade b steel. size 2 x 1.5 1.013 062 locking arrangment ( a ) mortise locks in accomodation areas defective to be renewed. 1.0131 062 locking arrangment ( b ) ms hasp staple / locking arrangemet on ms door and hatches corroded / broken / damaged to be renewed as per sample fitted. 1.0132 063 name board following name board perished / damaged, to be renewed / repaired. ( a ) repair / renewal of vessel name board including electroplating to be carried out on ship side 02 1.0133 063 name board following name board perished / damaged, to be renew. ( b ) vessel illuminated board with perspex sheet 01 1.0134 063 name board following name board perished / damaged, to be renew. ( c ) painting of vessel name on bulwark / ship side in both hindi and english with fluorescent paint 02 1.0135 064 furniture ( a ) crca kit lockers perished , to be renewed ( 90x80x45 cm ) 1.0136 064 furniture ( b ) crca standing lockers perished, to be renewed ( 183x40x45 cm ) 1.0137 064 furniture ( c ) wooden table damaged / pershed to be renewed 1.0138 064 furniture ( d ) wooed paneling in crew rest room and wheel house damged / perished, to be renewed 1.0139 065 gantry wire rope overhauling of gantry on weather deck to be carried out. steel wire rope to be load tested with swl of 01 ton. 1.014 066 awning repair of damaged awning shade frame wether deck at 02 locations of gi pipes and fitment of the same on fwdand aft a ) size: 2m x 5.5 m approx. mat: gi pipe 1.0141 067 pvc awning pvc awning at foxle and at aft side renewel of pvc awning over the frame using securing rope. mat as per sample. 1.0142 engineering work package 1001, d.g set engine, make: kirlosker oil engine ltd, model:ha294 19bhp@1500rpm air cooled 12v start cum hand start. total running hours 75 hrs, ( 1000 hrly routine carried out on the da during sr 17 ) . following to be carried out: ( firm not to quote ) 1.0143 1001, d.g set engine, make: kirlosker oil engine ltd, model:ha294 19bhp@1500rpm air cooled 12v start cum hand start. ( a ) engine lub oil to be changed ( oil to be supply by firm ) .oil servo 15 w 40 1.0144 1001, d.g set engine, make: kirlosker oil engine ltd, model:ha294 19bhp@1500rpm air cooled 12v start cum hand start. ( b ) fuel filter, insert micro filter element / cartridge to be changed.firm to quote for spares / material required. 1.0145 1001, d.g set engine, make: kirlosker oil engine ltd, model:ha294 19bhp@1500rpm air cooled 12v start cum hand start. ( c ) lub oil filter element / cartridge to be changed.firm to quote for spares / material required. 1.0146 1001, d.g set engine, make: kirlosker oil engine ltd, model:ha294 19bhp@1500rpm air cooled 12v start cum hand start. ( d ) injectors to be renewed.firm to quote for spares / material required. 1.0147 1001, d.g set engine, make: kirlosker oil engine ltd, model:ha294 19bhp@1500rpm air cooled 12v start cum hand start. ( e ) change intake air filtering unit 1.0148 1001, d.g set engine, make: kirlosker oil engine ltd, model:ha294 19bhp@1500rpm air cooled 12v start cum hand start. ( f ) flexible hoses fitted for lub oil and fuel oil system to be renewed 1.0149 1001, d.g set engine, make: kirlosker oil engine ltd, model:ha294 19bhp@1500rpm air cooled 12v start cum hand start. ( g ) carry out adjustment of overhead set. ( tappet setting of injectors & valves ) . 1.015 1001, d.g set engine, make: kirlosker oil engine ltd, model:ha294 19bhp@1500rpm air cooled 12v start cum hand start. ( h ) remove & chemical clean lub oil cooler & fresh water cooler. carry out pressure testing of lub oil cooler and fresh water cooler.renew all gasket & o rings. 1.0151 1001, d.g set engine, make: kirlosker oil engine ltd, model:ha294 19bhp@1500rpm air cooled 12v start cum hand start. ( j ) performance trials of the engine to be carried out. 1.0152 1002, fresh water cargo pump, make be pumps model ma 1023kk dgs2 316 ms3, ( a ) cargo fresh water pumps not developing sufficient pressure, pumps to be overhauled. ( overhaul to includes change of seals, gaskets, bearings, impeller , joints and other consumables ) 1.0153 1002, fresh water cargo pump, make be pumps model ma 1023kk dgs2 316 ms3, ( b ) suction and discharge pressure gauges along with end fittings and gauge lines to be renewed. ( range 0 10 kg / cm2, cuni lines 10 rmt ) 1.0154 1002, fresh water cargo pump, make be pumps model ma 1023kk dgs2 316 ms3, ( c ) pumps to be proved for satisfactory operation. 1.0155 1003, prime mover for cargo fresh water pump, make kirloskar oil engines, model ha294, sr no e1 03.1021.10 / 1300044, 1300045, 1300046, rpm 1800, qty 03, bhp 19 bhp@1500rpm. ( a ) engine lub oil to be changed. oil to be supply by firm ) .oil servo 15 w 40 1.0156 1003, prime mover for cargo fresh water pump, make kirloskar oil engines, model ha294, sr no e1 03.1021.10 / 1300044, 1300045, 1300046, rpm 1800, qty 03, bhp 19 bhp@1500rpm. ( b ) fuel filter, insert micro filter element / cartridge to be changed. firm to quote for spares / material required. 1.0157 1003, prime mover for cargo fresh water pump, make kirloskar oil engines, model ha294, sr no e1 03.1021.10 / 1300044, 1300045, 1300046, rpm 1800, qty 03, bhp 19 bhp@1500rpm. ( c ) lub oil filter element / cartridge to be changed. firm to quote for spares / material required. 1.0158 1003, prime mover for cargo fresh water pump, make kirloskar oil engines, model ha294, sr no e1 03.1021.10 / 1300044, 1300045, 1300046, rpm 1800, qty 03, bhp 19 bhp@1500rpm. ( d ) injectors to be renewed.firm to quote for spares / material required. 1.0159 1003, prime mover for cargo fresh water pump, make kirloskar oil engines, model ha294, sr no e1 03.1021.10 / 1300044, 1300045, 1300046, rpm 1800, qty 03, bhp 19 bhp@1500rpm. ( e ) carry out adjustment of overhead set. ( tappet setting of injectors & valves ) . 1.016 1003, prime mover for cargo fresh water pump, make kirloskar oil engines, model ha294, sr no e1 03.1021.10 / 1300044, 1300045, 1300046, rpm 1800, qty 03, bhp 19 bhp@1500rpm. ( f ) change intake air filtering unit 1.0161 1003, prime mover for cargo fresh water pump, make kirloskar oil engines, model ha294, sr no e1 03.1021.10 / 1300044, 1300045, 1300046, rpm 1800, qty 03, bhp 19 bhp@1500rpm. ( g ) performance trials of the engine to be carried out. 1.0162 1004, following system pipes to be removed , chemically cleaned , pressure tested and fitted back ( a ) fresh water, system size 50 mm, mat ms 1.0163 1004, following system pipes to be removed , chemically cleaned , pressure tested and fitted back ( b ) fuel water, system size 20 mm, mat ms 1.0164 1004, following system pipes to be removed , chemically cleaned , pressure tested and fitted back ( c ) auxialiary system pipes size 50 mm, mat ms 1.0165 1004, following system pipes to be removed , chemically cleaned , pressure tested and fitted back ( d ) exhaust system pipes size 25 mm mat ms 1.0166 1005, following system pipes to be renewed. ( a ) fresh water, system size 50 mm, mat ms 1.0167 1005, following system pipes to be renewed. ( b ) fuel water, system size 20 mm, mat ms 1.0168 1005, following system pipes to be renewed. ( c ) auxialiary system pipes size 50 mm, mat ms 1.0169 1005, following system pipes to be renewed. d ) exhaust system pipes size 25 mm mat ms 1.017 1006, miscellenious ( a ) fresh water system valves to be overhauled, including renewal of wear down parts ( spindle disc ) . type screw down, dia 80 mm 1.0171 1006, miscellenious ( b ) fresh water system valve wheel and cocks corroded. to be manufactured as per sample mat ms 1.0172 1006, miscellenious ( c ) fire system hydrants internal thread perished. to be manufactured as per sample. mat brass. 1.0173 1006, miscellenious ( d ) hand pumps not taking suction. to be overhauled and proved for operation 1.0174 1006, miscellenious ( e ) fuel filling point adaptors to be manufactured as per sample, material brass 1.0175 1006, miscellenious ( f ) hot lagging to be renewed for exhaust lines of dg & all pumps. 1.0176 1007, dd fresh water pump starting panel 12 v dc overhaul and routine to be carried out and proved for satisfectory performance 1.0177 1008 rudder & steering system ( a ) wire & pulley arrangement from wheel house to rudder stock to check for proper operation. pulley and wire to greased and eased up. 1.0178 1008 rudder & steering system ( b ) rudder & rudder stock jammed, to be eased and made operational 1.0179 1008 rudder & steering system ( c. ) fabricate geared wheel provided ( as sample ) for rudder movement from wheel house 1.018 electricla work package 2001, main switch board 415v, 3ph, 50 hz ( a ) overhauling of switchboard to be carried out including renewal of defective control wiring, defective fuse link and fuse carrier, terminal blocks, crimping of perished lugs of control wiring, perished number sleeves to be replaced, defective indication lamps to be changed. 1.0181 2001, main switch board 415v, 3ph, 50 hz ( b ) following meters to be renewed. ( firm not to quote ) 1.0182 2001, main switch board 415v, 3ph, 50 hz ( b ) following meters to be renewed ( i ) voltmeter 0 500v 1.0183 2001, main switch board 415v, 3ph, 50 hz ( b ) following meters to be renewed ( ii ) ammeter 0 100a 1.0184 2001, main switch board 415v, 3ph, 50 hz ( b ) following meters to be renewed ( iii ) frequency meter 45 50 55 hz 1.0185 2001, main switch board 415v, 3ph, 50 hz ( c ) following mccb to be renewed. ( firm not to quote ) 1.0186 2001, main switch board 415v, 3ph, 50 hz ( c ) following mccb to be renewed ( i ) hand operated mccb rating : 415v, 3phase, 50 hz, make : schneider, model : ezc 100n 40a 1.0187 2001, main switch board 415v, 3ph, 50 hz ( c ) following mccb to be renewed ( ii ) hand operated mccb rating : 415v, 3phase, 50 hz, make : schneider, model : ezc 100n 80a 1.0188 2001, main switch board 415v, 3ph, 50 hz ( d ) mechanical cleaning of main switchboard panel board to be carried & painted with one coat of primer and one coat of enamle paint ( white color paint from inside and gray color paint from outside ) . 1.0189 2002, eqpt / system: generators / alternator make:kirlosker, 415v, 3ph, 20kva, 50hz, 1500rpm carryout routines mentioned below and prove them for satisfactory performance. ( routine may be carried out with assistance of oem or authorised rep ) . ( firm not to quote ) 1.019 2002, eqpt / system: generators / alternator make:kirlosker, 415v, 3ph, 20kva, 50hz, 1500rpm carryout routines mentioned below and prove them for satisfactory performance. ( routine may be carried out with assistance of oem or authorised rep ) . ( a ) overhaul the generators / alternator 1.0191 2002, eqpt / system: generators / alternator make:kirlosker, 415v, 3ph, 20kva, 50hz, 1500rpm carryout routines mentioned below and prove them for satisfactory performance. ( routine may be carried out with assistance of oem or authorised rep ) . ( b ) renew the ievr 2 ( aumatic voltage regulator ) 1.0192 2002, eqpt / system: generators / alternator make:kirlosker, 415v, 3ph, 20kva, 50hz, 1500rpm carryout routines mentioned below and prove them for satisfactory performance. ( routine may be carried out with assistance of oem or authorised rep ) . ( c ) overhauling of self starter motor for da 12v dc, make : lucas tvs 1.0193 2002, eqpt / system: generators / alternator make:kirlosker, 415v, 3ph, 20kva, 50hz, 1500rpm carryout routines mentioned below and prove them for satisfactory performance. ( routine may be carried out with assistance of oem or authorised rep ) . ( d ) renewal of self starter motor for da 12v dc, make : lucas tvs 1.0194 2002, eqpt / system: generators / alternator make:kirlosker, 415v, 3ph, 20kva, 50hz, 1500rpm carryout routines mentioned below and prove them for satisfactory performance. ( routine may be carried out with assistance of oem or authorised rep ) . ( e ) repair and overhauling of dynamo assambly 12v dc, make : lucas tvs 1.0195 2003, diesel alternator control panel 24v dc ( a ) d / g ( port & stbd ) av alaram panel system including control wiring to be completely over hauled, calibrated and proved for satisfactory operation.machinery body to be cleaned to bare metal and painted with one coat of primer and one coat of enamle paint ( white color paint from inside and gray color paint from outside ) . 1.0196 2004, diesel driven fresh water pump 28 kw, make : kirloskar ( a ) overhauling of self starter motor for dd pump 12v dc, make : lucas tvs 1.0197 2004, diesel driven fresh water pump 28 kw, make : kirloskar ( b ) renewal of self starter motor for dd pump 12v dc, make lucas tvs 1.0198 2004, diesel driven fresh water pump 28 kw, make : kirloskar ( c ) repair and overhauling of dynamo assambly 12v dc, make : lucas tvs 1.0199 2004, diesel driven fresh water pump 28 kw, make : kirloskar ( d ) renewal of dynamo assambly for dd pump 12v dc, make lucas tvs 1.02 2005, shore supply connection box 415v, 3ph, 50hz ac make : wave electronics, kochi ( firm not to quote ) following routines to be carried out 1.0201 2005, shore supply connection box 415v, 3ph, 50hz ac make : wave electronics, kochi following routines to be carried out ( a ) renew the indication lamps with holders 415v 1.0202 2005, shore supply connection box 415v, 3ph, 50hz ac make : wave electronics, kochi following routines to be carried out ( b ) mechanical cleaning of shore supply connection box to be carried out & box to be painted with one coat of primer and one coat of enamal paint ( white color paint from inside and gray color paint from outside ) . 1.0203 2005, shore supply connection box 415v, 3ph, 50hz ac make : wave electronics, kochi following routines to be carried out ( c ) following meters to be renwed : ( i ) voltmeter 0 500v 1.0204 2005, shore supply connection box 415v, 3ph, 50hz ac make : wave electronics, kochi following routines to be carried out ( c ) following meters to be renwed : ( ii ) phase sequence meter 3 phase 415v 1.0205 2006, overhauling of following motors ( a ) pump room supply fan blower motor ( 415v, 3ph, 50hz, 0.5hp ) 1.0206 2007, light fitting ( a ) renew watertight u glass light fitting incandeescent lamp fittings. 230v, 60w ( make ajmera, model 2541 ) 1.0207 2007, light fitting ( b ) repair watertight u glass light fitting incandeescent lamp fittings. 230v, 60w ( make ajmera, model 2541 ) 1.0208 2007, light fitting ( c ) repair of name plate illumination light fitting ( 220v, 20w tube ) 1.0209 2008, eqpt / system: lead acid batteries. make:exide, 200ah, 12v self maintenace free battery ( a ) renew the batteries. 1.021 2008, eqpt / system: lead acid batteries. make:exide, 200ah, 12v self maintenace free battery ( b ) renew the battery connectors ( material brass ) 1.0211 2008, eqpt / system: lead acid batteries. make:exide, 200ah, 12v self maintenace free battery ( c ) renew the short link cable ( 50sq.mm multi strand copper cables, length 0.5mtr each ) with connectors ( material copper ) 1.0212 2009, make:exide, 140ah, 12v self maintenace free battery ( a ) renew the batteries 1.0213 2009, make:exide, 140ah, 12v self maintenace free battery ( b ) renew the battery connecting lugs 1.0214 2010, eqpt / system: wall mounted electrical fans ( oscillating ) make:c&g, type 400 mm sweep ( a ) wall mounted fan repair to carry out. prove for satisfactory operation 1.0215 2010, eqpt / system: wall mounted electrical fans ( oscillating ) make:c&g, type 400 mm sweep ( b ) wall mounted fan to renew 1.0216 2011, tank content guage system input supply 220v make : nivo control pvt ltd, indore ( a ) overhauling and calibration of tank content guage system and prove them onboard for satisfactory performance 1.0217 2011, tank content guage system input supply 220v make : nivo control pvt ltd, indore ( b ) calibraton of all level sensors. renew the all sensors cable 1.0218 2012, 10kva invertor, make: m / s sukam 10kva, input 230v ac and 180 v dc, output 230v ac, 1 phase, 50 hz ( a ) overhauling of invertor to be carried out, defective component to be repair / renewed. invertor to be operationalized and load trail undertaken. invertor to be proved for satisfactory performance 1.0219 2013, eqpt / system: window wiper systems ( 24v dc ) ( a ) overhaul the gear system. motor to be overhauled. clean and lubricate windshield wiper arms. check the pivot points and cleaning of same to be carried out.rubber blades including rubber coaming to be renewed. prove window wiper system for satisfactory performance. 1.022 2013, eqpt / system: window wiper systems ( 24v dc ) ( b ) renew the blades including rubber coaming 1.0221 2013, eqpt / system: window wiper systems ( 24v dc ) 2013, eqpt / system: window wiper systems ( 24v dc ) ( c ) overhauling of window wiper ccontrol system to be carried out. prove the satisfactory operation of the window wiper system from control panel. defective components to be renewed. 1.0222 2014, provide the suitable ship electrical horn for 30mtrs to 75 mtrs length vessels sound >130db, weather proof, & rust proof material ( 24v dc stainless single trumpet type ) 1.0223 2015, portable blowers 220v, 1 ph , 50 hz, 2hp ( a ) renewal of centrifugal portable blowers 1.0224 2016, extension board rating : 220v 1ph manufacturing of extension board with 02 in no 15a sw / skt combinaion and 02 in no 5a sw / skt combination and 15 mtr 3core 2 sqmm cable along with plug top 3 pin 15a 1.0225 2017, battery charger 1.5kw, input 220v 1ph, 50hz, output 24v &12v dc ( a ) provision & & install the battery charger in pump room and prove for charging of engine starting batteries 1.0226 2017, battery charger 1.5kw, input 220v 1ph, 50hz, output 24v &12v dc ( b ) provision & install the change over mccb tp 100a ( 2way with off ) in the circuit of battery to self starter of dd engine & battery to battery charger. 1.0227 2017, battery charger 1.5kw, input 220v 1ph, 50hz, output 24v &12v dc ( c ) provision the cable ( 2x10sq.mm copper multiple strand insulated cable ) & laying of cables from battery charger to batteries via chnge over switch 1.0228 2018, battery charger 1.5kw, input 220v 1ph, 50hz, output 24v &12v dc ( d ) provide the cable ( 1x150sq.mm copper multiple strand insulated cable ) & laying of cables from batteries to self starters via chnge over switch ( the job is including material of cable lugs & battery connecting lugs ) 1.0229 dry dock and allied services work package services ( a ) docking and undocking charges ( both versions ) e. docking and undocking will be done by navy in navy permises i.e nd ( v ) / slipway dock blocks preparation & laying out as per docking plan . job will be done by navy firm not to quote 1.023 ( b ) .provision of stationory / office items for nd ( v ) / refit monitoring team for entire refit duration period. cater budget of rs 4000 / per month. requirement will be intimated rmt / ndv on as requirement basis. payment at actuals. note: firms to quote. 1.0231 dock hire charges for an estimated duration of 60 days as per ocr dry dock facility will will provided by navy in navy permises i.e nd ( v ) / slipway. firm not to quote. 1.0232 wet basin / alongside hire charges for the remaining duration each ( i.e. total refit duration of 150 days – 60 days docking period ) . dry dock facility will will provided by navy in navy permises firm not to quote 1.0233 provision of sufficient lighting for duty staff firm to quote. 1.0234 ( a ) quote for maintenance of two in no. fire lines for the refit duration . firm to quote. 1.0235 ( b ) two each connection / disconnection charges for for the refit duration firm to quote. 1.0236 provision of two transports ( cars ) for entire refit duration ( one for refit co ordinating staff and one for nd ( v ) monitoring team ) for 10 hrs or 100km / day whichever is less firm to quote....

Indian Navy - Andhra Pradesh

27294789 tender for normal refit of in ship poshak 1 001 nhull sow poshak ( nr21 ) ndocking vessel to be docked in both versions. nnote 1: firms not to quote view docking, undocking and dock blocks preparation will be done by navy and the job is required to be carried out in navy premises ( i.e nd ( v ) slipway ) . nnote : last undock oct 18 2 002 nhull cleaning nunder water and boot top area n ( a ) hp jet clean entire under water area and boot top area ( with a pressure not exceeding 3000 psi ) including ship side and remove the marine growth / barnacles and present for survey. 3 002 nhull cleaning nshipside above water including bulwark and superstrcture n ( b ) hp jet clean entire shipside ( with a pressure not exceeding 3000 psi ) to remove the salts and contaminants from the surface and present for survey and present for survey. 4 002 nhull cleaning nweather deck n ( c ) hp jet clean entire weather deck including fittings ( with a pressure not exceeding 3000 psi ) remove salts and contaminants from the surface and present for survey. 5 002 nhull cleaning ntanks n ( d ) manually clean following tanks and present for survey.the tanks should be washed out with fresh water and soap water to remoeve any sediment or dirt present in the tank : wb tanks ( 09 nos ) 1100 sqm. , fuel oil tank 132 sqm., bilge holding tank 32 sqm., cargo oil tank 120 sqm., fw 180 sqm. , void spaces 200 sqm. , cofferdam 300sqm., cargo hold 190 sqm. , cable locker 45 sqm., internal compt i.e paiint store, rope store, bosun store 110 sqm., sewage tanks 33 sqm , deck store and .and engine room bilges 45 sqm. 6 003 nhull survey nexternal and internal hull survey. ncarry out visual and hammer survey ( in the presence of qc representatives ) in accordance with no 01 / 15 of under water hull, boot top area, above water hull, super structure, weather decks and all internal compartments ( i.e. fw tanks, ballast tanks, fore peak tank, engine room, steering compartment, fo tanks, cofferdams, all stiffeners and deck fittings etc.. approx. area:1800 sqm firm to submit 07 copies of hull survey report . 7 004 nutg survey ncarry out utg survey in the presence of qc representatives of u / w hull, sea tubes, sea chest and wherever recquired ie.superstructure, above water hull, weather deck, tank top etc.as per survey team. firm to submit 07 copies of hull survey report. all deck fittings to be surveyed, repaired and load tested where considered necessary.all manholes to be inspected and repaired to ensure watertightness including conduct of nchalk impression test. 8 005 nsteel renewals nquote for steel renewal at various locations as per survey report. nnote 1: quoted repair cost shall include cost of both sides blasted and primed grade `a’ quality ship building steel for shell and is 2062 grade `b’ quality steel for non structural works, degutting / regutting / renewal of all obstructions in way of steel renewals including lagging / panelling, minor fittings / equipments with their foundations, ventilation systems, staging etc., as indicated by survey team / rmt, proving of the weld runs by non destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal undertaken etc. note 2: firms to indicate cost of new panelling ( 2mm thick ) and lagging ( 2 mfmb ) material in the budgetary cost for 50 sqm each. 9 006 nbuild ups n carry out build ups as indicated by the hull survey team / surveyor n ( a ) 25 x 25 mm 150nos 10 006 nbuild ups ncarry out build ups as indicated by the hull survey team / surveyor n ( b ) 50 x50 mm 75 nos 11 007 nfairing ncarryout fairing of deformed structures as indicated by hull survey team / surveyor 12 008 nre welding run ncarry out re welding runs on weld seams as indicated by hull survey team / qc / rmt. 13 009 nsea tubes nsurface prepartion of of the sea tubes to be carried out for survey and pressure testing of sea tube including sea chest . dia 300mm 14 010 ndraught marks ndraught marks, both roman and numeric, corroded / eaten away. to be renewed and painted. 15 011 nsacrificial anodes n ( a ) renew mk i sacrificial anodes which are perished over 50%. nnote: anodes will be supplied by navy / coy. 16 011 nsacrificial anodes n ( b ) renew mk v sacrificial anodes which are perished over 50%. nnote: anodes will be supplied by navy / coy. 17 012 nsurface preparation nunder water area including boot top area with grit blasting nspot blasting to sa 2.5 on complete uw area including boot top.last paint scheme done in 2012 while induction and due for renewal as per no 53 / 16 : 18 013 npainting jotun scheme nunder water area including boot top area ncomplete uw paint scheme renewal view last paint scheme done in 2012 while induction and due for renewal as per no 53 / 16 : nnote: quoted repair cost shall be inclusive of cost of paints also. n ( a ) 1st coat: primer penguard primer 50 microns 19 013 npainting jotun scheme nunder water area including boot top area npaint under water area with following paint scheme as per oem recommendations: nnote: quoted repair cost shall be inclusive of cost of paints also. n ( b ) 2nd coat: anti corrosive jotacote universal ( aluminium ) 150 microns 20 013 npainting jotun scheme nunder water area including boot top area npaint under water area with following paint scheme as per oem recommendations: nnote: quoted repair cost shall be inclusive of cost of paints also. n ( c ) 3rd coat: anti corrosive jotacote universal ( grey ) 150 microns 21 013 n painting jotun scheme nunder water area including boot top area npaint under water area with following paint scheme as per oem recommendations: nnote: quoted repair cost shall be inclusive of cost of paints also. n ( d ) 4th coat: tie coat: safeguard es 125 microns 22 013 npainting jotun scheme nunder water area including boot top area npaint under water area with following paint scheme as per oem recommendations: nnote: quoted repair cost shall be inclusive of cost of paints also. n ( e ) 5th coat: a / f: seaquantum ultra ( brown / light red ) 150 microns 23 013 npainting jotun scheme nunder water area including boot top area npaint under water area with following paint scheme as per oem recommendations: nnote: quoted repair cost shall be inclusive of cost of paints also. n ( f ) 6th coat: a / f: seaquantum ultra ( red brown / dark red ) 150 microns 24 013 n painting jotun scheme nunder water area including boot top area npaint under water area with following paint scheme as per oem recommendations: nnote: quoted repair cost shall be inclusive of cost of paints also. n ( g ) 7th coat: a / f: seaquantum ultra ( brown / light red / black ) 150 microns 25 013 npainting jotun scheme nunder water area including boot top area n paint under water area with following paint scheme as per oem recommendations: nnote: quoted repair cost shall be inclusive of cost of paints also. n ( h ) 8th coat: a / f: seaquantum ultra ( brown / light red / black ) 150 microns 26 014 nsurface preparation nabove water area and bulwark including fittings nspot blasting to sa 2.5 on paint damaged areas / renewed plate areas as per the paint oem rep recommendation for paint application. 27 015 npainting jotun scheme. nabove water area and bulwark npaint above water area with following paint scheme as per oem recommendations: nnote: quoted repair cost shall be inclusive of cost of paints also. n ( a ) 1st coat: penguard primer 50 microns dft 28 015 npainting jotun scheme. nabove water area and bulwark npaint above water area with following paint scheme as per oem recommendations: nnote: quoted repair cost shall be inclusive of cost of paints also. n ( b ) 2nd coat: jotamastic ( grey / red brown ) 125 microns dft 29 015 npainting jotun scheme. nabove water area and bulwark npaint above water area with following paint scheme as per oem recommendations: nnote: quoted repair cost shall be inclusive of cost of paints also. n ( c ) 3rd coat: jotamastic ( grey ) 125 microns dft 30 015 npainting jotun scheme. n above water area and bulwark npaint above water area with following paint scheme as per oem recommendations: nnote: quoted repair cost shall be inclusive of cost of paints also. n ( d ) 4th coat: hard top xp grey 60 microns dft 31 016 nsurface preparation nsuper structure and deck fittings . ncarry out mechanical cleaning to st3 standard as per survey report of paint oem for paint application. 32 017 npainting jotun scheme nsuper structure and deck fittings. n paint super structure area area with following paint scheme as per oem recommendations: nnote: quoted repair cost shall be inclusive of cost of paints also. n ( a ) 1st coat: primer penguard primer 50 microns dft 33 017 npainting jotun scheme nsuper structure and deck fittings. npaint super structure area area with following paint scheme as per oem recommendations: nnote: quoted repair cost shall be inclusive of cost of paints also. n ( b ) 2nd coat: jotamastic 80 red brown 125 microns dft n 34 017 npainting jotun scheme nsuper structure and deck fittings. npaint super structure area area with following paint scheme as per oem recommendations: nnote: quoted repair cost shall be inclusive of cost of paints also. n ( c ) 3rd coat: jotamastic 80 grey 125 microns dft 35 017 npainting jotun scheme nsuper structure and deck fittings. npaint super structure area area with following paint scheme as per oem recommendations: nnote: quoted repair cost shall be inclusive of cost of paints also. n ( d ) 4th coat: hard top grey 7040 150 microns dft 36 018 nsurface preparation nweather decks bridge deck bridge top and fittings n carry out surface preperation to wj 2.0 standard by using hydro jet blasting for paint application for entire weather deck, wheel house deck, flag deck and life raft deck. 37 019 n painting jotun scheme nweather decks bridge deck bridge top and fittings npaint weather decks and fittings with following paint scheme: nnote: quoted repair cost shall be inclusive of cost of paints also. n ( a ) 1st coat: primer penguard primer 50 microns dft 38 019 n painting jotun scheme nweather decks bridge deck bridge top and fittings n paint weather decks and fittings with following paint scheme: n note: quoted repair cost shall be inclusive of cost of paints also. ( b ) 2nd coat: jotamastic 87 of 200 microns 39 019 npainting jotun scheme nweather decks bridge deck bridge top and fittings npaint weather decks and fittings with following paint scheme: nnote: quoted repair cost shall be inclusive of cost of paints also. n ( c ) 3rd coat: jota armour dark grey of 800 microns 40 020 nsurface preparation n internal compartments nfresh water tanks ( 02 nos ) and fire fighting foam tank: ncarry out mechanical cleaning to st3 standard as per survey report of paint oem for paint application. 41 021 n painting jotun scheme. nfresh water tanks ( 02 nos ) and fire fighting foam tank npaint two in no. fresh water tanks and one fire fighting foam tank with following paint scheme: nnote: quoted repair cost shall be inclusive of cost of paints also. n ( a ) 1st coat: penguard hb ( white ) 100 microns dft 42 021 n painting jotun scheme. nfresh water tanks ( 02 nos ) and fire fighting foam tank npaint two in no. fresh water tanks and one fire fighting foam tank with following paint scheme: nnote: quoted repair cost shall be inclusive of cost of paints also. n ( b ) 2nd coat: penguard hb ( grey ) 100 microns dft 43 021 npainting jotun scheme. nfresh water tanks ( 02 nos ) and fire fighting foam tank npaint two in no. fresh water tanks and one fire fighting foam tank with following paint scheme: nnote: quoted repair cost shall be inclusive of cost of paints also. n ( c ) 3rd coat: penguard hb ( white ) 100 microns dft 44 022 nsurface preparation ntanks nfore peak tanks, ballast tanks, cable locker and void spaces n ( a ) carry out mechanical cleaning to st3 standard as survey report of paint oem for paint application. 45 022 nsurface preparation ntanks nfore peak tanks, ballast tanks ( 10 no ) , cable locker n ( b ) carry out mechanical cleaning to st 1 standard as per survey report of paint oem for paint application. 46 023 n painting jotun scheme n fore peak tanks, ballast tanks ( 10 no ) , cable locker n paint fore peak tanks, ballast tanks ( 02 in no. ) and cable locker with following paint scheme. nnote: quoted repair cost shall be inclusive of cost of paints also. n ( a ) 1st coat: primer penguard primer 50 microns dft 47 023 npainting jotun scheme nfore peak tanks, ballast tanks ( 10 no ) , cable locker npaint fore peak tanks, ballast tanks ( 02 in no. ) and cable locker with following paint scheme. nnote: quoted repair cost shall be inclusive of cost of paints also. n ( b ) 2nd coat: anticorrosive balloxy ( hb light ) 150 microns 48 023 npainting jotun scheme nfore peak tanks, ballast tanks ( 10 no ) , cable locker npaint fore peak tanks, ballast tanks ( 02 in no. ) and cable locker with following paint scheme. nnote: quoted repair cost shall be inclusive of cost of paints also. n ( c ) 3rd coat: anticorrosive balloxy ( hb light ) 150 microns 49 024 n surface preparation nmachinery compartments engine room and srp n ( a ) carry out mechanical cleaning to st 3 standard as per survey report of paint oem for paint application ( bilges ) . 50 024 nsurface preparation nmachinery compartments engine room and srp n ( b ) carry out mechanical cleaning to st 1 standard as per survey report of paint oem for paint application ( bulkheads ) . 51 025 n painting jotun scheme. nmachinery bilges npaint bilges of engine room and srp compartment with following paint scheme.note: quoted repair cost shall be inclusive of cost of paints also. ( a ) 1st coat: primer penguard primer 50 microns dft 52 025 n painting jotun scheme. nmachinery bilges npaint bilges of engine room and srp compartment with following paint scheme.note: quoted repair cost shall be inclusive of cost of paints also ( b ) 2nd coat: anticorrosive jotacote universal ( aluminium ) 150 microns dft 53 025 npainting jotun scheme. nmachinery bilges npaint bilges of engine room and srp compartment with following paint scheme.note: quoted repair cost shall be inclusive of cost of paints also ( c ) 3rd coat: anticorrosive jotacote universal ( grey ) 150 microns 54 025 n painting jotun scheme. n machinery bilges npaint bilges of engine room and srp compartment with following paint scheme.note: quoted repair cost shall be inclusive of cost of paints also. ( d ) 4th coat: penguard top coat 50 microns. 55 026 nsurface preparation nmachinery compartments bulkheads of engine room and asp n ( a ) carry out mechanical cleaning to st 3 standard as per survey report of paint oem for paint application ( bilges ) . 56 026 nsurface preparation nmachinery compartments bulkheads of engine room and asp n ( b ) carry out mechanical cleaning to st 1 standard as per survey report of paint oem for paint application ( bilges ) . 57 027 npainting jotun scheme. nmachinery compartments nbulkheads of engine room and asp npaint bulkheads of engine room and srp compartments with following paint scheme nnote: quoted repair cost shall be inclusive of cost of paints also. n ( a ) 1st coat: primer penguard primer 50 microns dft 58 027 npainting jotun scheme. n machinery compartments nbulkheads of engine room and asp npaint bulkheads of engine room and srp compartments with following paint scheme: n ( b ) 2nd coat: white interior fire retardant paint 100 microns dft 59 027 nbulkhead painting. npainting jotun scheme. npaint bulkheads of engine room and srp compartments with following paint scheme: n ( c ) 3rd coat: white interior fire retardant paint 100 microns dft 60 028 ncleaning and application of oil n ( a ) fuel tanks / avcat nmanually scrap and clean fuel tank ( 10 nos ) to bare metal and apply two coats of om 750 oil. nnote: quoted repair cost shall be inclusive of cost of oil also 61 028 ncleaning and application of oil n ( b ) ru ( fods ) tanks n manually scrap and clean ru tank ( 02nos ) to bare metal and apply two coats of om 750 oil. nnote: quoted repair cost shall be inclusive of cost of oil also 62 029 nsurface preparation ntanks nlo tanks and dirty oil tanks ncarry out mechanical cleaning to st3 standard as survey report of paint oem for paint application. 63 030 npainting jotun scheme nlo tanks & dirty oil tanks npaint lo tanks & dirty oil tanks with following paint scheme. n ( a ) 1st coat: primer tankguard hb 125 microns dft nnote: quoted repair cost shall be inclusive of cost of paints also. 64 030 npainting jotun scheme nlo tanks & dirty oil tanks npaint lo tanks & dirty oil tanks with following paint scheme. n ( b ) 2nd coat: primer tankguard hb 125 microns dft nnote: quoted repair cost shall be inclusive of cost of paints also. 65 031 n gratings nopen underwater gratings, present for survey, carry out necessary repairs and refit back. 66 032 nanchor and anchor chain cable nanchor and anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at ndv mfab dept.paint with black bituminous paint post survey iaw no 12 / 2001 and refit back. note : the job involves removal of anchors and accessories, laying out for cleaning, painting and refitment. a ) anchor 67 032 nanchor and anchor chain cable nanchor and anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at ndv mfab dept.paint with black bituminous paint post survey iaw no 12 / 2001 and refit back. note : the job involves removal of anchors and accessories, laying out for cleaning, painting and refitment. b ) chain cable ( dia 32 mm ) total length of the cable 275 mtrs 68 032 nanchor and anchor chain cable nanchor and anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at ndv mfab dept.paint with black bituminous paint post survey iaw no 12 / 2001 and refit back. note : the job involves removal of anchors and accessories, laying out for cleaning, painting and c )  swivel piece 69 032 nanchor and anchor chain cable nanchor and anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at ndv mfab dept.paint with black bituminous paint post survey iaw no 12 / 2001 and refit back. note : the job involves removal of anchors and accessories, laying out for cleaning, painting nd )  lug less joining shackles 70 032 nanchor and anchor chain cable nanchor and anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at ndv mfab dept.paint with black bituminous paint post survey iaw no 12 / 2001 and refit back. note : the job involves removal of anchors and accessories, laying out for cleaning, painting and n e )   cable stopper 71 032 nanchor and anchor chain cable nanchor and anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at ndv mfab dept.paint with black bituminous paint post survey iaw no 12 / 2001 and refit back. note : the job involves removal of anchors and accessories, laying out for cleaning, painting and nf ) d shackles 72 033 nanchor windlass / capstan n ( a ) completely strip & overhaul anchor windlass ( including lub oil renewals ) , renew brake linings, refit and prove for satisfactory operation.note : overhaul involves removal of drum, gearbox, brake lining, motor and ovrhaul of all these items and refitment. oil sys 46 / hp80 73 033 ncapstan n ( b ) completely strip & overhaul capstan and prove for satifactory operation.note : overhaul involves removal of drum, gearbox, brake lining, motor and ovrhaul of all these items and refitment. oil sys 46 / hp80 74 034 nbollards nsingle bollards nfollowing single bollards corroded, thinned. entire bollard to be renewed n ( a ) single bollards, size: 290 mm dia, 10 mm thickness, 1300 mm length. schdule 80 pipe 75 034 nbollards ntwin bollards n ( b ) following twin bollards corroded, thinned. entire bollard to be repaired / renewed as per hull survey report. ndia of bollard pipe 290 mm. height of bollard 515 mm. size of bollard base / foundation1163x125x380 mm: , thickness of pipe: 10 mm. doubler plate size: 1230x480x10 mm, thickness: 10 mm, 76 035 ntyre fender ntyre fenders damaged on p&s side to be renewed with used automobile tyre fenders moulded with 8 mm layer of white natural rubber on top and outer sides. mat rubber, colour white. no painting or coating of any other form will be permitted. vendors to adhere to sow n ( a ) tyre fender od 1000 mm id 800 mm width 350 mm 77 036 ntyre fender securing arrangement ntyre fender to be secured with 14 mm dia chain on head, stern and ship side n ( a ) securing chains: 14mm dia ( mat gi ) 78 036 ntyre fender securing arrangement ntyre fender to be secured with d shackles on ship side n ( b ) d shackles 14 mm dia ( mat gi ) 79 036 ntyre fender securing arrangement nsecuring chain is to be passed through metallic sleeves inserted into the tyre fenders n ( c ) securing sleeves of dia 03 inch and length 250 mm ( mat ms pipe of 06mm thick ) 80 036 n tyre fender securing arrangement ntyre fenders securing eye plates to bo be welded along ships side for connecting of securing chains n ( d ) eye plate thickness 8 mm. ( mat ms ) 81 037 n bulwark n ( a ) bulwark at various places dented / damaged. to be included in hull in survey and renew as per survey report. thickness 6 mm 82 037 nbulwark coaming n ( b ) bulwark coaming pipes corroded and thinned. to be included in hull in survey and renewed as per survey report. dia 3 mat : ms 83 038 nsky light / port holes nsky light at various places damaged including glass. skylight / port holes is to be repaired / renewed as per sample. 84 039 nmetalic half pipe fender nmetallic half pipe fender around the shipside to be repaired / renewed. n ( a ) size 150mm dia, 08mm thick 85 039 nd shaped fenders nremoval of all d shaped fenders for survey of c channels and necessary repairs is to be attended on securing channels including nut and bolts ) . post repair of c channels damaged fenders is to be renewed details of d shaped rubber fender and associated fittings are as follows: d shaped fenders of 1000 x100x250 mm 86 039 n d shaped fenders securing arrangement c channel n fender securing arrangement corroded / thinned / holed , to be repaired as per hull survey reports 87 039 nd shaped fenders securing arrangement nut and bolts nfender securing arrangement i.e nut and bolts corroded / thinned / holed , to be renewed for securing of d fenders around ship side 88 040 nrubber beading. nrubber beading of doors at various places perished / cracked to be renewed and chalk test to be proved. as per ncd 5904 ( a ) tensile strength kg / cm2 ( min % ) 70 ( b ) elongation at break ( min % ) 350 ( c ) hardness shore a 50+ / 5 ) n ( a ) wt door 89 040 nrubber beading. nrubber beading of hatches at various places perished / crackedto be renewed and chalk test to be proved. as per ncd 5904 ( a ) tensile strength kg / cm2 ( min % ) 70 ( b ) elongation at break ( min % ) 350 ( c ) hardness shore a 50+ / 5 ) nb ) wt hatch 90 040 n rubber beading. nrubber beading of skylight perished / crackedto be renewed and chalk test to be proved. as per ncd 5904 ( a ) tensile strength kg / cm2 ( min % ) 70 ( b ) elongation at break ( min % ) 350 ( c ) hardness shore a 50+ / 5 ) n ( c ) ventilator / sky light 91 041 napt nair pressure test the following tanks and rectify the defects any observed during pressure testing and prove to 0.2 bar for 10 minutes. nnote: apt and proving of those tanks wherein steel renewel / buildup undertaken as part of steel renewal dl. 0003 ( c ) above is that of firms liability with no additional cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this dl. serial. note: apt to be done in every 04 year, ref. no 01 / 15, last apt done in nov dec 18 ( a ) fresh water tank 92 041 napt nair pressure test the following tanks and rectify the defects any observed during pressure testing and prove to 0.2 bar for 10 minutes. nnote: apt and proving of those tanks wherein steel renewel / buildup undertaken as part of steel renewal dl. 0003 ( c ) above is that of firms liability with no additional cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this dl. serial. n ( b ) ballast tank 93 041 napt nair pressure test the following tanks and rectify the defects any observed during pressure testing and prove to 0.2 bar for 10 minutes. nnote: apt and proving of those tanks wherein steel renewel / buildup undertaken as part of steel renewal dl. 0003 ( c ) above is that of firms liability with no additional cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this dl. serial.. n ( c ) forepeak tank , cofferdam and void spaces 94 041 napt nair pressure test the following tanks and rectify the defects any observed during pressure testing and prove to 0.2 bar for 10 minutes. nnote: apt and proving of those tanks wherein steel renewel / buildup undertaken as part of steel renewal dl. 0003 ( c ) above is that of firms liability with no additional cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this dl. serial. n ( d ) fuel tank , do tanks , bilge holding tank 95 041 napt nair pressure test the following tanks and rectify the defects any observed during pressure testing and prove to 0.2 bar for 10 minutes. nnote: apt and proving of those tanks wherein steel renewel / buildup undertaken as part of steel renewal dl. 0003 ( c ) above is that of firms liability with no additional cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this dl. serial. n ( e ) firefighting foam tank 96 042 nbiilge platform n ( a ) renew bilge platform plate. material chequered aluminium, thickness 05 mm 97 042 n biilge platform n ( b ) bilge platform supporting brackets to be renewed where ever required. mat ms 98 043 ncleats nms cleats perished / thinned to be renewed ( size 28 mm ) . mat : ms 99 044 ntank / vent pipe nvent pipes of various tanks on upper deck corroded and thinned, to be renewed. ( mat. gi pipe ) n ( a ) pipe dia 2 1 / 2 inch 100 044 ntank / vent pipe nvent pipes of various tanks on upper deck corroded and thinned, to be renewed. ( mat. gi pipe ) n ( b ) distance piece and flanges: dia 150mm ( including rubber joints ) 101 045 nwt hatch clips n ( a ) hatch clips broken / damaged. to be renewed. mat. ms 102 045 nwt hatches n ( b ) hatch clips at various places jammed , to be lubricated including washer and fitted back 103 046 nwt doors n ( a ) clips of wt. doors jammed to be removed lubricated including washer, nut and fitted back 104 046 nwt hatch metal coaming n ( b ) metallic coaming of 05 in no wt hatches on weather deckand various locations corroded and thinned. to be renewed as per survey report. area 20 sqm. 105 047 ncircular hatches noprating lever of circular hatches jammed to be overhauled 106 048 nnwt doors nnwt wooden doors including frames of wheel house / crew cabin, master cabin perished / damaged. to be renewed / repaired 107 049 nventilation nmushroom type ventilators on weather deck jammed , to be removed, cleaned / overhauled and fitted beck. dia: 550mm n ( a ) 550mm dia 108 050 nventilation nmushroom type ventilators to be removed, cleaned / overhauled and fitted back. renew if required. n ( a ) details mush room head dia 1000 mm, height 800 mm 109 050 nventilation nmushroom type ventilators on weather deck jammed , to be removed, cleaned / overhauled and fitted beck. dia:360 mm n ( b ) 360mm dia 110 050 nventilation n ( c ) ventilation trunking perished to be repaired / renewed. n location: crew rest room , masters cabin, ed rest room galley / dinning hall and fitted back . nmat gi sheet 111 051 nbreather pipe nbreather pipe on weather deck perished / damage.to be renewed 112 052 nliferaft nsecuring stand of life rafts perished and damaged. to be renewed alongwith rubber lining and supporting frame, including fitment of hrg mat ms . n thickness 06mm. 113 053 n nav light nnav light foundation ( port & stbd ) corroded, to be repaired / renewed. nsize: 620mmx620mmx300mm and thickness 6mm, mat ms 114 054 ndrainage system nms scupper lips with rubber packing corroded / thinned / holed, to be renewed / repaired at ship side 115 055 ndrainage system n ( a ) deck drain pipes corroded / holed, to be renewed / repaired. dia 2 1 / 2 inch. mat: gi note : pipes / fittings should be secured with rubber packing’s and clamps uniformly 116 055 ndrainage system n ( b ) scupper with coaming of drain pipe corroded / thinned, to be renewed / repaired. size: 250mmx200mm 117 055 ndrainage system n ( c ) deck drain pieces on upper deck corroded, to be renewed / repaired. dia 2 1 / 2 inch, each of length 01mtr. note the job involves removal / repair and fitment of pipes / panelling / lagging / trunking in the way. 118 055 ndrainage system. n ( d ) soil pipes of crew, eds and masters bathroom to be removed chemically cleaned and fit back. 119 056 n pipelines ncarry out pressure testing & repairs of soil pipe / drainaige pipe / fresh water lines fitted at various locations 120 057 nsofa / cushion nsofa in master and engineer rest rooms torn / perished. to be repaired 121 058 npanelling nwooden panels in crew accommodation, engg. rest room, master rest room and other places damaged. to be repaired 122 059 nfurniture nwooden table damaged / broken at crew dinnig hall and crew cabin to be repaired. 123 060 nguard rails nguard rails pipe damaged / perished at bridge deck. to be repaired / renewed. material gi pipe . 124 061 nstanchion n ( a ) stanction on upper deck damaged / deformed at various loactions. to be repaired / renewed. size h 970 mm and dia 50 mm mat gi pipe 125 061 nstanchion n ( b ) securing chain between stanchions on upper deck damaged. to be renewed. mat ms, size 10 mm dia 126 062 nname board nfollowing tug name board perished / damaged, to be renewed / repaired. n ( a ) repair / renewal of vessel name board including electroplating to be carried out on ship side 02 127 062 nname board nfollowing tug name board perished / damaged, to be renewed / repaired. n ( b ) painting of tug name on bulwark in both hindi and english at stem and stern with fluorescent paint 03 128 062 n name board nfollowing tug name board perished / damaged, to be repaired. n ( c ) illuminated name board with perspex sheet 01 129 063 n door locks n ( a ) mortise lock of non wt door defective at various locations, all defective mortise locks to be renewed. including 03 set of keys 130 063 ndoor locks n ( b ) locking arrangement is to be provided for wt doors at various locations, including hasp & staples and pad locks 131 064. nsanitary system nss wash basin damaged in crew batroom and wc to be repaired as indicated n ( a ) wash basin 132 064 nsanitary system nss tap damaged in crew batroom and wc to be repaired as indicated n ( b ) ss tap: 1 / 2 inch 133 065 nsanitary system nsupply pipes damaged corroded / thinned / holed in crew batroom and wc to be repaired as indicated nc ) supply pipe: mat : cu ni, dia: ½’’ 134 065 n sanitary system ndrain pipes damaged corroded / thinned / holed in crew batroom and wc to be repaired as indicated nd ) drain pipe: mat ms, dia 2’’ 135 065 nsanitary system nflush valves damaged corroded / thinned / holed in crew batroom and wc to be repaired as indicated ne ) flush valves mat brass, dia 2 136 065 nsanitary system npvc wash basin drain pipe line damaged to be renewed as indicated nf ) pvc drain pipe nnote: quoted repair cost shall include cost all items. 137 066 nwc / commode nwc commode and base plate in crew wash room perished / corroded, to be renewed. mat ss 138 067 nbathroom fittings nbathroom fittings damged / broken in crew bathrooms and master bathroom , to be renewed as per sample n ( a ) cu ni supply pipes 139 067 nbathroom fittings nbathroom fittings damged / broken in crew bathrooms and master bathroom , to be renewed as per sample n ( b ) shower head 140 068 n deck underlay ndeck covering to be repaired / renewed at uprooted / damaged / steel renewed places, accommodation areas, wheel house and wet compartments. nnote: n ( a ) surface preparation and application of erop. as per ncd 3717 141 068 ndeck underlay ndeck covering to be repaired / renewed at uprooted / damaged / steel renewed places, accommodation areas, wheel house and wet compartments nnote; dry compt area 110 sqm, wet compt area 30 sqm, dadoes area 15 sqm n ( b ) application of underlay as per ncd 3717 142 068 ndeck underlay ndeck covering to be repaired / renewed at uprooted / damaged / steel renewed places, accommodation areas, wheel house and wet compartments nnote; dry compt area 110 sqm, wet compt area 30 sqm, dadoes area 15 sqm n ( c ) application of sealer coat and top coat on entire area as per ncd 3717. 143 069 nfoundation nfoundation of deck machinery / deck fittings corroded / thinned / perished , to be repaired / renewed as per survey report 144 070 nlagging nlagging at indicated places to be removed to facilitate structural repairs and to be renewed with new lagging post completion of repairs.mat ss 145 071 ndeck head panelling / sunmicia npanelling at indicated places to be removed to facilitate structural repairs and to be refitted post completion of repairs. nmat : wooden 146 072 npanelling npanelling at indicated places including wet compt to be removed to facilitate structural repairs and to be refitted post completion of repairs. mat : ss 147 073 nmanhole n ( a ) manhole covers corroded / thinned to be renewed as per survey report mat is 2062 grade b steel. size 2 x 1.5 148 073 nmanhole n ( b ) rubber joints deterioted, to be renewed 149 073 nmanhole n ( c ) studs of manholes corroded, to be renewed. only defective studs which are found defective on survey to be renewed. ms studs with nut, size 20 mm 150 nengineering work package n1001 nmain engine ( qty 02 ) , nmake cummins, model kta 38m2 marine propulsion engine, power 1350bhp, 19500rpm, sl no port ( 25344299 ) , stbd ( 25344298 ) , running hours pme 200 hrs &sme 200 hrs 151 1001 nmain engine ( qty 02 ) , nmake cummins, model kta 38m2 marine propulsion engine, power 1350bhp, 19500rpm, sl no port ( 25344299 ) , stbd ( 25344298 ) , running hours pme 200 hrs &sme 200 hrs na ) drain and clean sump. charge fresh engine oil. ( oil to provide by navy ) 152 1001 nmain engine ( qty 02 ) , nmake cummins, model kta 38m2 marine propulsion engine, power 1350bhp, 19500rpm, sl no port ( 25344299 ) , stbd ( 25344298 ) , running hours pme 200 hrs &sme 200 hrs nb ) change air cleaner element. 153 1001 nmain engine ( qty 02 ) , make cummins, model kta 38m2 marine propulsion engine, power 1350bhp, 19500rpm, sl no port ( 25344299 ) , stbd ( 25344298 ) , running hours pme 200 hrs &sme 200 hrs nc ) change fuel filter. 154 1001 nmain engine ( qty 02 ) , nmake cummins, model kta 38m2 marine propulsion engine, power 1350bhp, 19500rpm, sl no port ( 25344299 ) , stbd ( 25344298 ) , running hours pme 200 hrs &sme 200 hrs nd ) renew coolant inhibitor with zinc plugs. 155 1001 nmain engine ( qty 02 ) , make cummins, model kta 38m2 marine propulsion engine, power 1350bhp, 19500rpm, sl no port ( 25344299 ) , stbd ( 25344298 ) , running hours pme 200 hrs &sme 200 hrs ne ) renew engine oil filter. 156 1001 nmain engine ( qty 02 ) , nmake cummins, model kta 38m2 marine propulsion engine, power 1350bhp, 19500rpm, sl no port ( 25344299 ) , stbd ( 25344298 ) , running hours pme 200 hrs &sme 200 hrs nf ) renew by pass filter. 157 1001 nmain engine ( qty 02 ) , nmake cummins, model kta 38m2 marine propulsion engine, power 1350bhp, 19500rpm, sl no port ( 25344299 ) , stbd ( 25344298 ) , running hours pme 200 hrs &sme 200 hrs ng ) caliberate and adjust injectors and test report to be rendered. 158 1001 nmain engine ( qty 02 ) , nmake cummins, model kta 38m2 marine propulsion engine, power 1350bhp, 19500rpm, sl no port ( 25344299 ) , stbd ( 25344298 ) , running hours pme 200 hrs &sme 200 hrs nh ) remove and clean fresh water cooler .carry out pressure testing.renew gasket & o rings 159 1001 nmain engine ( qty 02 ) , nmake cummins, model kta 38m2 marine propulsion engine, power 1350bhp, 19500rpm, sl no port ( 25344299 ) , stbd ( 25344298 ) , running hours pme 200 hrs &sme 200 hrs nj ) air starter and air starting mechanism need to be overhauled 160 1001 nmain engine ( qty 02 ) , nmake cummins, model kta 38m2 marine propulsion engine, power 1350bhp, 19500rpm, sl no port ( 25344299 ) , stbd ( 25344298 ) , running hours pme 200 hrs &sme 200 hrs nk ) expansion tank and connecting piping to clean internally and repair if required. 161 1001 nmain engine ( qty 02 ) , nmake cummins, model kta 38m2 marine propulsion engine, power 1350bhp, 19500rpm, sl no port ( 25344299 ) , stbd ( 25344298 ) , running hours pme 200 hrs &sme 200 hrs nm ) gear box lub oil to be renewed 162 1001 nmain engine ( qty 02 ) , nmake cummins, model kta 38m2 marine propulsion engine, power 1350bhp, 19500rpm, sl no port ( 25344299 ) , stbd ( 25344298 ) , running hours pme 200 hrs &sme 200 hrs nn ) damaged fly wheel gear teeth of both main engine to repaired 163 1001 nmain engine ( qty 02 ) , nmake cummins, model kta 38m2 marine propulsion engine, power 1350bhp, 19500rpm, sl no port ( 25344299 ) , stbd ( 25344298 ) , running hours pme 200 hrs &sme 200 hrs n ( p ) renew fly wheel if repair is not feasible 164 1001 nmain engine ( qty 02 ) , nmake cummins, model kta 38m2 marine propulsion engine, power 1350bhp, 19500rpm, sl no port ( 25344299 ) , stbd ( 25344298 ) , running hours pme 200 hrs &sme 200 hrs nq ) remove and clean lub oil cooler carry out pressure testing.renew gasket & o rings 165 1001 nmain engine ( qty 02 ) , nmake cummins, model kta 38m2 marine propulsion engine, power 1350bhp, 19500rpm, sl no port ( 25344299 ) , stbd ( 25344298 ) , running hours pme 200 hrs &sme 200 hrs nr ) replace all rubber hoses and durret 166 1001 nmain engine ( qty 02 ) , nmake cummins, model kta 38m2 marine propulsion engine, power 1350bhp, 19500rpm, sl no port ( 25344299 ) , stbd ( 25344298 ) , running hours pme 200 hrs &sme 200 hrs ns ) both engine sea water pump to be overhauled and defective part to be renew 167 1001 nmain engine ( qty 02 ) , nmake cummins, model kta 38m2 marine propulsion engine, power 1350bhp, 19500rpm, sl no port ( 25344299 ) , stbd ( 25344298 ) , running hours pme 200 hrs &sme 200 hrs nt ) air starting mechanism mositure absorber body leaking. to be repaired 168 1001 nmain engine ( qty 02 ) , nmake cummins, model kta 38m2 marine propulsion engine, power 1350bhp, 19500rpm, sl no port ( 25344299 ) , stbd ( 25344298 ) , running hours pme 200 hrs &sme 200 hrs nu ) post completion of routine, engine to be proved for satisfactory performance nnote: routine to be carried out by oem only and all the calibration certificate and test report to be rendered. 169 1002 nemergency generator ( qty 01 ) , nmake kiorloskar &crompton greaves ac generator, thane, model brd.0.9c54.7, sl no: 62r6.5 / 41 running hours 40 hrs. 170 1002 nemergency generator ( qty 01 ) , make kiorloskar &crompton greaves ac generator, thane, model brd.0.9c54.7, sl no: 62r6.5 / 41 running hours 40 hrs. n ( a ) carry out adjustment of injectors & valves. 171 1002 nemergency generator ( qty 01 ) , nmake kiorloskar &crompton greaves ac generator, thane, model brd.0.9c54.7, sl no: 62r6.5 / 41 running hours 40 hrs. n ( b ) drive belt need to be changed. 172 1002 nemergency generator ( qty 01 ) , nmake kiorloskar &crompton greaves ac generator, thane, model brd.0.9c54.7, sl no: 62r6.5 / 41 running hours 40 hrs. n ( c ) replace rocker cover gaskets. 173 1002 nemergency generator ( qty 01 ) , nmake kiorloskar &crompton greaves ac generator, thane, model brd.0.9c54.7, sl no: 62r6.5 / 41 running hours 40 hrs. nd ) change engine oil. ( oil will be supplied by navy ) 174 1002 nemergency generator ( qty 01 ) , make kiorloskar &crompton greaves ac generator, thane, model brd.0.9c54.7, sl no: 62r6.5 / 41 running hours 40 hrs. ne ) change air cleaner element. 175 1002 nemergency generator ( qty 01 ) , make kiorloskar &crompton greaves ac generator, thane, model brd.0.9c54.7, sl no: 62r6.5 / 41 running hours 40 hrs. nf ) change fuel filter. 176 1002 nemergency generator ( qty 01 ) , make kiorloskar &crompton greaves ac generator, thane, model brd.0.9c54.7, sl no: 62r6.5 / 41 running hours 40 hrs. ng ) renew coolant inhibitor with zinc plugs. 177 1002 nemergency generator ( qty 01 ) , make kiorloskar &crompton greaves ac generator, thane, model brd.0.9c54.7, sl no: 62r6.5 / 41 running hours 40 hrs. nh ) renew engine oil filter. 178 1002 nemergency generator ( qty 01 ) , make kiorloskar &crompton greaves ac generator, thane, model brd.0.9c54.7, sl no: 62r6.5 / 41 running hours 40 hrs. nj ) renew by pass filter. 179 1002 nemergency generator ( qty 01 ) , make kiorloskar &crompton greaves ac generator, thane, model brd.0.9c54.7, sl no: 62r6.5 / 41 running hours 40 hrs. nk ) post completion of routine, engine to be proved for satisfactory performance 180 1002 nemergency generator ( qty 01 ) , make kiorloskar &crompton greaves ac generator, thane, model brd.0.9c54.7, sl no: 62r6.5 / 41 running hours 40 hrs. nl ) remove and clean lub oil cooler carry out pressure testing. renew gasket & o rings 181 1002 nemergency generator ( qty 01 ) , make kiorloskar &crompton greaves ac generator, thane, model brd.0.9c54.7, sl no: 62r6.5 / 41 running hours 40 hrs. nm ) replace all rubber hoses and durret nnote: routine to be carried out by oem only. 182 1003 nhp air compressor ( qty 02 ) , make ingersoll rand, u.d.marketing pvt ltd.kolkata, type electric driven, high pressure , model 7t4x5, capacity 12cu.m / hr@30 bar, sl no 9054135 ( motor driven ) , 9054134 ( diesel driven ) 183 1003 nhp air compressor ( qty 02 ) , make ingersoll rand, u.d.marketing pvt ltd.kolkata, type electric driven, high pressure , model 7t4x5, capacity 12cu.m / hr@30 bar, sl no 9054135 ( motor driven ) , 9054134 ( diesel driven ) n ( a ) lub oil sump to be drained, cleaned &new oil to be charged ( lub oil will be provided by the department ) 184 1003 nhp air compressor ( qty 02 ) , make ingersoll rand, u.d.marketing pvt ltd.kolkata, type electric driven, high pressure , model 7t4x5, capacity 12cu.m / hr@30 bar, sl no 9054135 ( motor driven ) , 9054134 ( diesel driven ) n ( b ) renew air inlet filter element. 185 1003 nhp air compressor ( qty 02 ) , make ingersoll rand, u.d.marketing pvt ltd.kolkata, type electric driven, high pressure , model 7t4x5, capacity 12cu.m / hr@30 bar, sl no 9054135 ( motor driven ) , 9054134 ( diesel driven ) n ( c ) sump stainers / filter to be cleaned & fitback 186 1003 nhp air compressor ( qty 02 ) , make ingersoll rand, u.d.marketing pvt ltd.kolkata, type electric driven, high pressure , model 7t4x5, capacity 12cu.m / hr@30 bar, sl no 9054135 ( motor driven ) , 9054134 ( diesel driven ) n ( d ) sump stainers / filter to renew , if strainer perished 187 1003 nhp air compressor ( qty 02 ) , make ingersoll rand, u.d.marketing pvt ltd.kolkata, type electric driven, high pressure , model 7t4x5, capacity 12cu.m / hr@30 bar, sl no 9054135 ( motor driven ) , 9054134 ( diesel driven ) n ( e ) instumentation gauges pipes with suitable end fittings to be renewed mat:cuni dia:1 / 4 188 1003 nhp air compressor ( qty 02 ) , make ingersoll rand, u.d.marketing pvt ltd.kolkata, type electric driven, high pressure , model 7t4x5, capacity 12cu.m / hr@30 bar, sl no 9054135 ( motor driven ) , 9054134 ( diesel driven ) n ( f ) pressure switches to be calibrated and proven for correct operation. 189 1003 nhp air compressor ( qty 02 ) , make ingersoll rand, u.d.marketing pvt ltd.kolkata, type electric driven, high pressure , model 7t4x5, capacity 12cu.m / hr@30 bar, sl no 9054135 ( motor driven ) , 9054134 ( diesel driven ) n ( g ) oil / water moisture separator of compressors to be renewed 190 1003 nhp air compressor ( qty 02 ) , make ingersoll rand, u.d.marketing pvt ltd.kolkata, type electric driven, high pressure , model 7t4x5, capacity 12cu.m / hr@30 bar, sl no 9054135 ( motor driven ) , 9054134 ( diesel driven ) n ( h ) chemical cleaning & pressure testing of air bottles to be carried out.capacity 375ltrs, tp 49bar 191 1003 nhp air compressor ( qty 02 ) , make ingersoll rand, u.d.marketing pvt ltd.kolkata, type electric driven, high pressure , model 7t4x5, capacity 12cu.m / hr@30 bar, sl no 9054135 ( motor driven ) , 9054134 ( diesel driven ) n ( j ) relief valves on air bottles to be set at 45 bar. 192 1003 nhp air compressor ( qty 02 ) , make ingersoll rand, u.d.marketing pvt ltd.kolkata, type electric driven, high pressure , model 7t4x5, capacity 12cu.m / hr@30 bar, sl no 9054135 ( motor driven ) , 9054134 ( diesel driven ) n ( k ) renew air system cocks.mat ss, dia 20mm 193 1003 nhp air compressor ( qty 02 ) , make ingersoll rand, u.d.marketing pvt ltd.kolkata, type electric driven, high pressure , model 7t4x5, capacity 12cu.m / hr@30 bar, sl no 9054135 ( motor driven ) , 9054134 ( diesel driven ) n ( l ) drive belts of compressor to be changed. 194 1003 nhp air compressor ( qty 02 ) , make ingersoll rand, u.d.marketing pvt ltd.kolkata, type electric driven, high pressure , model 7t4x5, capacity 12cu.m / hr@30 bar, sl no 9054135 ( motor driven ) , 9054134 ( diesel driven ) n ( m ) drive belt guard of compressor to be renewed. 195 1003 nhp air compressor ( qty 02 ) , make ingersoll rand, u.d.marketing pvt ltd.kolkata, type electric driven, high pressure , model 7t4x5, capacity 12cu.m / hr@30 bar, sl no 9054135 ( motor driven ) , 9054134 ( diesel driven ) nn ) top cover of compressor to be opened and inspection of piston and valves to be carried out 196 1003 nhp air compressor ( qty 02 ) , make ingersoll rand, u.d.marketing pvt ltd.kolkata, type electric driven, high pressure , model 7t4x5, capacity 12cu.m / hr@30 bar, sl no 9054135 ( motor driven ) , 9054134 ( diesel driven ) np ) replace top cover gaskets. 197 1003 nhp air compressor ( qty 02 ) , make ingersoll rand, u.d.marketing pvt ltd.kolkata, type electric driven, high pressure , model 7t4x5, capacity 12cu.m / hr@30 bar, sl no 9054135 ( motor driven ) , 9054134 ( diesel driven ) n ( q ) compressor to be proved for satisfactory perfomance. 198 1003 nhp air compressor ( qty 02 ) , make ingersoll rand, u.d.marketing pvt ltd.kolkata, type electric driven, high pressure , model 7t4x5, capacity 12cu.m / hr@30 bar, sl no 9054135 ( motor driven ) , 9054134 ( diesel driven ) n ( r ) air cooled intercooler and after cooler to tubes to clean , deposits of oil , dirt or grease to removed 199 1003 nhp air compressor ( qty 02 ) , make ingersoll rand, u.d.marketing pvt ltd.kolkata, type electric driven, high pressure , model 7t4x5, capacity 12cu.m / hr@30 bar, sl no 9054135 ( motor driven ) , 9054134 ( diesel driven ) n ( s ) proper mounting of canopy to base frame with smooth opening and closing operation to ensure. the base frame and canopy to zinc sprayed fo rust inhibition, primer and final paint to applied. canopy sealing gasket xlpe to renewed. 200 1004 ndiesel generator ( koel & crompton ) ( qty 02 ) , make koel, model 6sl9088ta1, output 176bhp@1500rpm, sl no: f6.3002 / 0900004 ( port ) , f6.3002 / 0900005 ( stbd ) running hours pdg 1200 hrs sdg 1000 hrs ( 1500 hrly routine to be carried out ) 201 1004 ndiesel generator ( koel & crompton ) ( qty 02 ) , make koel, model 6sl9088ta1, output 176bhp@1500rpm, sl no: f6.3002 / 0900004 ( port ) , f6.3002 / 0900005 ( stbd ) running hours pdg 1200 hrs sdg 1000 hrs ( 1500 hrly routine to be carried out ) n ( a ) carry out pr testing, adjustment of injectors & valves and test report to be rendered. 202 1004 ndiesel generator ( koel & crompton ) ( qty 02 ) , make koel, model 6sl9088ta1, output 176bhp@1500rpm, sl no: f6.3002 / 0900004 ( port ) , f6.3002 / 0900005 ( stbd ) running hours pdg 1200 hrs sdg 1000 hrs ( 1500 hrly routine to be carried out ) n ( b ) replace rocker cover gaskets. 203 1004 ndiesel generator ( koel & crompton ) ( qty 02 ) , make koel, model 6sl9088ta1, output 176bhp@1500rpm, sl no: f6.3002 / 0900004 ( port ) , f6.3002 / 0900005 ( stbd ) running hours pdg 1200 hrs sdg 1000 hrs ( 1500 hrly routine to be carried out ) nc ) change engine oil. ( oil to provided by navy ) 204 1004 ndiesel generator ( koel & crompton ) ( qty 02 ) , make koel, model 6sl9088ta1, output 176bhp@1500rpm, sl no: f6.3002 / 0900004 ( port ) , f6.3002 / 0900005 ( stbd ) running hours pdg 1200 hrs sdg 1000 hrs ( 1500 hrly routine to be carried out ) n ( d ) overhaul sea water pump.prove the pump for satisfactory performance and defective part to be renewed. 205 1004 ndiesel generator ( koel & crompton ) ( qty 02 ) , make koel, model 6sl9088ta1, output 176bhp@1500rpm, sl no: f6.3002 / 0900004 ( port ) , f6.3002 / 0900005 ( stbd ) running hours pdg 1200 hrs sdg 1000 hrs ( 1500 hrly routine to be carried out ) ne ) clean expansion tank internally, repair expansion tank and connecting piping if required. replace coolant ( coolant to be provided by firm ) 206 1004 ndiesel generator ( koel & crompton ) ( qty 02 ) , make koel, model 6sl9088ta1, output 176bhp@1500rpm, sl no: f6.3002 / 0900004 ( port ) , f6.3002 / 0900005 ( stbd ) running hours pdg 1200 hrs sdg 1000 hrs ( 1500 hrly routine to be carried out ) n ( f ) remove & chemical clean lub oil cooler & carry out pressure testing.renew gasket & o rings.zing plugs to be renewed 207 1004 ndiesel generator ( koel & crompton ) ( qty 02 ) , make koel, model 6sl9088ta1, output 176bhp@1500rpm, sl no: f6.3002 / 0900004 ( port ) , f6.3002 / 0900005 ( stbd ) running hours pdg 1200 hrs sdg 1000 hrs ( 1500 hrly routine to be carried out ) n ( g ) remove & chemical clean fresh water cooler & carry out pressure testing.renew gasket & o rings. zing plugs to be renewed 208 1004 ndiesel generator ( koel & crompton ) ( qty 02 ) , make koel, model 6sl9088ta1, output 176bhp@1500rpm, sl no: f6.3002 / 0900004 ( port ) , f6.3002 / 0900005 ( stbd ) running hours pdg 1200 hrs sdg 1000 hrs ( 1500 hrly routine to be carried out ) n ( h ) change heat exchanger zinc plugs. 209 1004 ndiesel generator ( koel & crompton ) ( qty 02 ) , make koel, model 6sl9088ta1, output 176bhp@1500rpm, sl no: f6.3002 / 0900004 ( port ) , f6.3002 / 0900005 ( stbd ) running hours pdg 1200 hrs sdg 1000 hrs ( 1500 hrly routine to be carried out ) n ( j ) check thottle linkage, lubricate ball joints of the throttle linkage of governor. 210 1004 ndiesel generator ( koel & crompton ) ( qty 02 ) , make koel, model 6sl9088ta1, output 176bhp@1500rpm, sl no: f6.3002 / 0900004 ( port ) , f6.3002 / 0900005 ( stbd ) running hours pdg 1200 hrs sdg 1000 hrs ( 1500 hrly routine to be carried out ) n ( k ) all rubber durrets & hoses to be replaced. 211 1004 ndiesel generator ( koel & crompton ) ( qty 02 ) , make koel, model 6sl9088ta1, output 176bhp@1500rpm, sl no: f6.3002 / 0900004 ( port ) , f6.3002 / 0900005 ( stbd ) running hours pdg 1200 hrs sdg 1000 hrs ( 1500 hrly routine to be carried out ) n ( l ) change fuel filter 212 1004 ndiesel generator ( koel & crompton ) ( qty 02 ) , make koel, model 6sl9088ta1, output 176bhp@1500rpm, sl no: f6.3002 / 0900004 ( port ) , f6.3002 / 0900005 ( stbd ) running hours pdg 1200 hrs sdg 1000 hrs ( 1500 hrly routine to be carried out ) n ( m ) change air cleaner element. 213 1004 ndiesel generator ( koel & crompton ) ( qty 02 ) , make koel, model 6sl9088ta1, output 176bhp@1500rpm, sl no: f6.3002 / 0900004 ( port ) , f6.3002 / 0900005 ( stbd ) running hours pdg 1200 hrs sdg 1000 hrs ( 1500 hrly routine to be carried out ) n ( n ) caliberation of fip & governor assembly to be carried out.report of the same to be rendered 214 1004 ndiesel generator ( koel & crompton ) ( qty 02 ) , make koel, model 6sl9088ta1, output 176bhp@1500rpm, sl no: f6.3002 / 0900004 ( port ) , f6.3002 / 0900005 ( stbd ) running hours pdg 1200 hrs sdg 1000 hrs ( 1500 hrly routine to be carried out ) n ( p ) rectify if any defect observed in fip & governor assembly 215 1004 ndiesel generator ( koel & crompton ) ( qty 02 ) , make koel, model 6sl9088ta1, output 176bhp@1500rpm, sl no: f6.3002 / 0900004 ( port ) , f6.3002 / 0900005 ( stbd ) running hours pdg 1200 hrs sdg 1000 hrs ( 1500 hrly routine to be carried out ) n ( q ) overhauling of electric starter to be done nnote: 1500 hrly routine of dg to be undertaken by oem 216 1005 nfuel oiltransfer pump ( qty 02 ) , make: royson engineers pvt ltd, kolkata , model: rgp 1 mt , capacity: 2 cu.m / hr@20mwc, sl no: b1403 09. 217 1005 nfuel oiltransfer pump ( qty 02 ) , make: royson engineers pvt ltd, kolkata , model: rgp 1 mt , capacity: 2 cu.m / hr@20mwc, sl no: b1403 09. n ( a ) carry out overhauling of pumps, renew bearing &shaft seal. 218 1005 nfuel oiltransfer pump ( qty 02 ) , make: royson engineers pvt ltd, kolkata , model: rgp 1 mt , capacity: 2 cu.m / hr@20mwc, sl no: b1403 09. n ( b ) suction &discharge presure gauges to be renewed.range 30 0 &0 05bar 219 1005 nfuel oiltransfer pump ( qty 02 ) , make: royson engineers pvt ltd, kolkata , model: rgp 1 mt , capacity: 2 cu.m / hr@20mwc, sl no: b1403 09. n ( c ) renew needle valve.mat ss 220 1005 nfuel oiltransfer pump ( qty 02 ) , make: royson engineers pvt ltd, kolkata , model: rgp 1 mt , capacity: 2 cu.m / hr@20mwc, sl no: b1403 09. n ( d ) carry out alignment of pump with motor &prove for satisfactory perfomance. 221 1006 nfuel oil centrifuge ( qty 01 ) , make: alfa lavel india ltd, pune, capacity 1150lph@disc pr 1.5 kg / cm2, model mab103, sl no: 4176151 2008 222 1006 nfuel oil centrifuge ( qty 01 ) , make: alfa lavel india ltd, pune, capacity 1150lph@disc pr 1.5 kg / cm2, model mab103, sl no: 4176151 2008 n ( a ) centrifuge bowl assembly to be dismantled.all separator disc plates to be removed cleaned &fitted back.renew disc plates if perished. 223 1006 nfuel oil centrifuge ( qty 01 ) , make: alfa lavel india ltd, pune, capacity 1150lph@disc pr 1.5 kg / cm2, model mab103, sl no: 4176151 2008 n ( b ) check the condition of gravity disc.renew gravity disc, if required. 224 1006 nfuel oil centrifuge ( qty 01 ) , make: alfa lavel india ltd, pune, capacity 1150lph@disc pr 1.5 kg / cm2, model mab103, sl no: 4176151 2008 n ( c ) drive shaft friction pads to be renewed 225 1006 nfuel oil centrifuge ( qty 01 ) , make: alfa lavel india ltd, pune, capacity 1150lph@disc pr 1.5 kg / cm2, model mab103, sl no: 4176151 2008 n ( d ) suction & discharge presure gauges to be renewed range:30 0 & 0 8. 226 1006 nfuel oil centrifuge ( qty 01 ) , make: alfa lavel india ltd, pune, capacity 1150lph@disc pr 1.5 kg / cm2, model mab103, sl no: 4176151 2008 n ( e ) 02 pr.gauges of 0 6 bar, 02 copper pipes with suitable end fittings to be renewed.mat:cuni dia:1 / 4. 227 1006 nfuel oil centrifuge ( qty 01 ) , make: alfa lavel india ltd, pune, capacity 1150lph@disc pr 1.5 kg / cm2, model mab103, sl no: 4176151 2008 n ( f ) condition of sv mounts be checked, if found defective to be renewed. 228 1006 nfuel oil centrifuge ( qty 01 ) , make: alfa lavel india ltd, pune, capacity 1150lph@disc pr 1.5 kg / cm2, model mab103, sl no: 4176151 2008 n ( g ) centrifuge to be proved for satisfactory perfomance post work completion. 229 1007 nfuel oil cargo pump ( qty 02 ) , make: best & crompton engg.ltd, chennai, capacity 100cu.m@30 mwc, sl no: w0050110 ( no.1 ) , w0047610 ( no.2 ) 230 1007 nfuel oil cargo pump ( qty 02 ) , make: best & crompton engg.ltd, chennai, capacity 100cu.m@30 mwc, sl no: w0050110 ( no.1 ) , w0047610 ( no.2 ) n ( a ) carry out overhauling of pumps, renew bearing &shaft seal. 231 1007 nfuel oil cargo pump ( qty 02 ) , make: best & crompton engg.ltd, chennai, capacity 100cu.m@30 mwc, sl no: w0050110 ( no.1 ) , w0047610 ( no.2 ) n ( b ) suction &discharge presure gauges to be renewed.range 30 0 &0 100psi. 232 1007 nfuel oil cargo pump ( qty 02 ) , make: best & crompton engg.ltd, chennai, capacity 100cu.m@30 mwc, sl no: w0050110 ( no.1 ) , w0047610 ( no.2 ) n ( c ) renew needle valve.mat ss 233 1007 nfuel oil cargo pump ( qty 02 ) , make: best & crompton engg.ltd, chennai, capacity 100cu.m@30 mwc, sl no: w0050110 ( no.1 ) , w0047610 ( no.2 ) n ( d ) carry out alignment of pump with motor &prove for satisfactory perfomance. 234 1008 nlub oil transfer pump ( qty 01 ) , make: royson engineers pvt ltd, kolkata , model: rgp 1 mt, capacity: 1 cu.m / hr@5kg / cm2.sl. no b1396 02 235 1008 nlub oil transfer pump ( qty 01 ) , make: royson engineers pvt ltd, kolkata , model: rgp 1 mt, capacity: 1 cu.m / hr@5kg / cm2.sl. no b1396 02 n ( a ) overhauling of pumps includes repair / renewal of weardown parts ( shaft, mechanical seals, impeller, gaskets, bearings ) and fitted back. 236 1008 nlub oil transfer pump ( qty 01 ) , make: royson engineers pvt ltd, kolkata , model: rgp 1 mt, capacity: 1 cu.m / hr@5kg / cm2.sl. no b1396 02 n ( b ) suction & discharge presure gauges to be renewed range:30 0 & 0 5bar. 237 1008 nlub oil transfer pump ( qty 01 ) , make: royson engineers pvt ltd, kolkata , model: rgp 1 mt, capacity: 1 cu.m / hr@5kg / cm2.sl. no b1396 02 n ( c ) renew needle valve.mat ss 238 1008 nlub oil transfer pump ( qty 01 ) , make: royson engineers pvt ltd, kolkata , model: rgp 1 mt, capacity: 1 cu.m / hr@5kg / cm2.sl. no b1396 02 n ( d ) carry out alignment of pump with motor &prove for satisfactory perfomance 239 1009 noily bilge water separator ( qty 01 ) , make: victor marine ltd, uk, type: cs500, capacity: 0.5 cu.m / hr@3.45 bar, suction head: 0.6bar at separator inlet, disc head: 3.45bar, sl no: 00358. 240 1009 noily bilge water separator ( qty 01 ) , make: victor marine ltd, uk, type: cs500, capacity: 0.5 cu.m / hr@3.45 bar, suction head: 0.6bar at separator inlet, disc head: 3.45bar, sl no: 00358. n ( a ) proximity sensors to be calibtrated &replace if required. 241 1009 noily bilge water separator ( qty 01 ) , make: victor marine ltd, uk, type: cs500, capacity: 0.5 cu.m / hr@3.45 bar, suction head: 0.6bar at separator inlet, disc head: 3.45bar, sl no: 00358. n ( b ) calibration of 3 / 2 way pneumatic valve. 242 1009 noily bilge water separator ( qty 01 ) , make: victor marine ltd, uk, type: cs500, capacity: 0.5 cu.m / hr@3.45 bar, suction head: 0.6bar at separator inlet, disc head: 3.45bar, sl no: 00358. n ( c ) renewal of 6mm copper pipe. 243 1009 noily bilge water separator ( qty 01 ) , make: victor marine ltd, uk, type: cs500, capacity: 0.5 cu.m / hr@3.45 bar, suction head: 0.6bar at separator inlet, disc head: 3.45bar, sl no: 00358. n ( d ) primary & secondry cell cleaning. 244 1009 noily bilge water separator ( qty 01 ) , make: victor marine ltd, uk, type: cs500, capacity: 0.5 cu.m / hr@3.45 bar, suction head: 0.6bar at separator inlet, disc head: 3.45bar, sl no: 00358. n ( e ) primary & secondery stage filter to be replaced. 245 1009 noily bilge water separator ( qty 01 ) , make: victor marine ltd, uk, type: cs500, capacity: 0.5 cu.m / hr@3.45 bar, suction head: 0.6bar at separator inlet, disc head: 3.45bar, sl no: 00358. n ( f ) overhauling of screw pump. 246 1009 noily bilge water separator ( qty 01 ) , make: victor marine ltd, uk, type: cs500, capacity: 0.5 cu.m / hr@3.45 bar, suction head: 0.6bar at separator inlet, disc head: 3.45bar, sl no: 00358. n ( g ) caliberation of puri meter. 247 1009 noily bilge water separator ( qty 01 ) , make: victor marine ltd, uk, type: cs500, capacity: 0.5 cu.m / hr@3.45 bar, suction head: 0.6bar at separator inlet, disc head: 3.45bar, sl no: 00358. n ( h ) perfomances trials for satisfactory perfomance. 248 1010 ndirty oil pump ( qty 01 ) , make , model: royson engineers pvt ltd, kolkata , model: rgp 1 mt, capacity: 1 cu.m / hr@2kg / cm2, sl no: b1400 02. 249 1010 ndirty oil pump ( qty 01 ) , make , model: royson engineers pvt ltd, kolkata , model: rgp 1 mt, capacity: 1 cu.m / hr@2kg / cm2, sl no: b1400 02. n ( a ) carry out overhauling of pump 250 1010 ndirty oil pump ( qty 01 ) , make , model: royson engineers pvt ltd, kolkata , model: rgp 1 mt, capacity: 1 cu.m / hr@2kg / cm2, sl no: b1400 02. n ( b ) suction &discharge presure gauges to be renewed.range 30 0 &0 05bar 251 1010 ndirty oil pump ( qty 01 ) , make , model: royson engineers pvt ltd, kolkata , model: rgp 1 mt, capacity: 1 cu.m / hr@2kg / cm2, sl no: b1400 02. n ( c ) renew needle valve.mat ss 252 1010 ndirty oil pump ( qty 01 ) , make , model: royson engineers pvt ltd, kolkata , model: rgp 1 mt, capacity: 1 cu.m / hr@2kg / cm2, sl no: b1400 02. n ( d ) renewal of bearings &shaft seal. 253 1010 ndirty oil pump ( qty 01 ) , make , model: royson engineers pvt ltd, kolkata , model: rgp 1 mt, capacity: 1 cu.m / hr@2kg / cm2, sl no: b1400 02. n ( e ) carry out alignment of pump with motor &prove for satisfactory perfomance. 254 1011 nbilge and ballast pump ( qty 04 ) , make: be pump, model: sh 65 160mn1 gds2 316, type: self priming, centrifugal, capacity: 35cu.m / hr@30kg / sq.cm, sl no: 357815 ( no.1 ) , 357814 ( no.2 ) , 357813 ( no.3 ) , 357812 ( no.4 255 1011 nbilge and ballast pump ( qty 04 ) , make: be pump, model: sh 65 160mn1 gds2 316, type: self priming, centrifugal, capacity: 35cu.m / hr@30kg / sq.cm, sl no: 357815 ( no.1 ) , 357814 ( no.2 ) , 357813 ( no.3 ) , 357812 ( no.4 n ( a ) carry out overhauling of pumps, renew parts if required. 256 1011 nbilge and ballast pump ( qty 04 ) , make: be pump, model: sh 65 160mn1 gds2 316, type: self priming, centrifugal, capacity: 35cu.m / hr@30kg / sq.cm, sl no: 357815 ( no.1 ) , 357814 ( no.2 ) , 357813 ( no.3 ) , 357812 ( no.4 n ( b ) instumentation gauges pipes with suitable end fittings to be renewed .cuni dia:1 / 4 257 1011 nbilge and ballast pump ( qty 04 ) , make: be pump, model: sh 65 160mn1 gds2 316, type: self priming, centrifugal, capacity: 35cu.m / hr@30kg / sq.cm, sl no: 357815 ( no.1 ) , 357814 ( no.2 ) , 357813 ( no.3 ) , 357812 ( no.4 n ( c ) renew needle valve. mat 1 / 4 258 1011 nbilge and ballast pump ( qty 04 ) , make: be pump, model: sh 65 160mn1 gds2 316, type: self priming, centrifugal, capacity: 35cu.m / hr@30kg / sq.cm, sl no: 357815 ( no.1 ) , 357814 ( no.2 ) , 357813 ( no.3 ) , 357812 ( no.4 n ( d ) carryout alignment of pump with motor & prove for satisfactory perfomance. 259 1011 nbilge and ballast pump ( qty 04 ) , make: be pump, model: sh 65 160mn1 gds2 316, type: self priming, centrifugal, capacity: 35cu.m / hr@30kg / sq.cm, sl no: 357815 ( no.1 ) , 357814 ( no.2 ) , 357813 ( no.3 ) , 357812 ( no.4 n ( e ) suction & discharge pressure gauges to be renewed.range 0 120psi & 30 30psi. 260 1011 nbilge and ballast pump ( qty 04 ) , make: be pump, model: sh 65 160mn1 gds2 316, type: self priming, centrifugal, capacity: 35cu.m / hr@30kg / sq.cm, sl no: 357815 ( no.1 ) , 357814 ( no.2 ) , 357813 ( no.3 ) , 357812 ( no.4 n ( f ) renew jaw coupling & rubber coupling between pump & motor. 261 1011 nbilge and ballast pump ( qty 04 ) , make: be pump, model: sh 65 160mn1 gds2 316, type: self priming, centrifugal, capacity: 35cu.m / hr@30kg / sq.cm, sl no: 357815 ( no.1 ) , 357814 ( no.2 ) , 357813 ( no.3 ) , 357812 ( no.4 n ( g ) rectify leakages in self priming unit, renew flexible hoses if required. 262 1012 nfresh water cargo pump, make: be pump, model: ma 843kks dgs2 316 ms 3, type: self priming, centrifugal, capacity: 40cu.m / hr@30kg / sq.cm, sl no: 357811. 263 1012 nfresh water cargo pump, make: be pump, model: ma 843kks dgs2 316 ms 3, type: self priming, centrifugal, capacity: 40cu.m / hr@30kg / sq.cm, sl no: 357811. n ( a ) carry out overhauling of pumps, renew parts if required. 264 1012 nfresh water cargo pump, make: be pump, model: ma 843kks dgs2 316 ms 3, type: self priming, centrifugal, capacity: 40cu.m / hr@30kg / sq.cm, sl no: 357811. n ( b ) instumentation gauges pipes with suitable end fittings to be renewed .cuni dia:1 / 4 265 1012 nfresh water cargo pump, make: be pump, model: ma 843kks dgs2 316 ms 3, type: self priming, centrifugal, capacity: 40cu.m / hr@30kg / sq.cm, sl no: 357811. n ( c ) renew needle valve. mat 1 / 4 266 1012 nfresh water cargo pump, make: be pump, model: ma 843kks dgs2 316 ms 3, type: self priming, centrifugal, capacity: 40cu.m / hr@30kg / sq.cm, sl no: 357811. n ( d ) carryout alignment of pump with motor & prove for satisfactory perfomance. 267 1012 nfresh water cargo pump, make: be pump, model: ma 843kks dgs2 316 ms 3, type: self priming, centrifugal, capacity: 40cu.m / hr@30kg / sq.cm, sl no: 357811. n ( e ) suction & discharge pressure gauges to be renewed.range 268 1012 nfresh water cargo pump, make: be pump, model: ma 843kks dgs2 316 ms 3, type: self priming, centrifugal, capacity: 40cu.m / hr@30kg / sq.cm, sl no: 357811. n ( f ) renew jaw coupling & rubber coupling between pump & motor. 269 1013 nfuel oil / avcat stripping pump, make: royson engineers pvt ltd, kolkata , model: rgp 1 mt, capacity: 2cu.m / hr@20mwc, sl no: b 1399 09. 270 1013 nfuel oil / avcat stripping pump, make: royson engineers pvt ltd, kolkata , model: rgp 1 mt, capacity: 2cu.m / hr@20mwc, sl no: b 1399 09. n ( a ) pumps to be overhauled .renew wear down parts if required. 271 1013 nfuel oil / avcat stripping pump, make: royson engineers pvt ltd, kolkata , model: rgp 1 mt, capacity: 2cu.m / hr@20mwc, sl no: b 1399 09. n ( b ) suction & discharge pressure gauges to be renewed.range ( 1 to 1kg / sq.cm ) & 0 10kg / sq cm 272 1013 nfuel oil / avcat stripping pump, make: royson engineers pvt ltd, kolkata , model: rgp 1 mt, capacity: 2cu.m / hr@20mwc, sl no: b 1399 09. n ( c ) renew needle valve.mat:ss dia 1 / 4 273 1013 nfuel oil / avcat stripping pump, make: royson engineers pvt ltd, kolkata , model: rgp 1 mt, capacity: 2cu.m / hr@20mwc, sl no: b 1399 09. n ( d ) carry out alignment of pump with motor & prove for satisfactory perfomance. 274 1014 nvalve to be overhauled make vijoli, type screw down, overhauling includes renewal of wear down parts ( spindle, disc ) , mat gm 275 1014 nvalve to be overhauled make vijoli, type screw down, overhauling includes renewal of wear down parts ( spindle, disc ) , mat gm n ( a ) dia 300 mm 276 1014 nvalve to be overhauled make vijoli, type screw down, overhauling includes renewal of wear down parts ( spindle, disc ) , mat gm n ( b ) dia 150 mm 277 1014 nvalve to be overhauled make vijoli, type screw down, overhauling includes renewal of wear down parts ( spindle, disc ) , mat gm n ( c ) dia 125 mm 278 1014 nvalve to be overhauled make vijoli, type screw down, overhauling includes renewal of wear down parts ( spindle, disc ) , mat gm n ( d ) dia 100 mm 279 1014 nvalve to be overhauled make vijoli, type screw down, overhauling includes renewal of wear down parts ( spindle, disc ) , mat gm n ( e ) dia 80 mm 280 1014 nvalve to be overhauled make vijoli, type screw down, overhauling includes renewal of wear down parts ( spindle, disc ) , mat gm n ( f ) dia 40mm 281 1014 nvalve to be overhauled make vijoli, type screw down, overhauling includes renewal of wear down parts ( spindle, disc ) , mat gm n ( g ) dia 20mm 282 1014 nvalve to be overhauled make vijoli, type screw down, overhauling includes renewal of wear down parts ( spindle, disc ) , mat gm n ( h ) dia 32 mm 283 1014 nvalve to be overhauled make vijoli, type screw down, overhauling includes renewal of wear down parts ( spindle, disc ) , mat gm n ( j ) relief valves ( 100mm ) 284 1015 nbilge collecting pump, make: royson engineers pvt ltd, kolkata , model: rgp 1 mt, capacity: 2cu.m / hr@20mwc, sl no: b 1397 09. 285 1015 nbilge collecting pump, make: royson engineers pvt ltd, kolkata , model: rgp 1 mt, capacity: 2cu.m / hr@20mwc, sl no: b 1397 09. n ( a ) pumps to be overhauled .renew wear down parts if required. 286 1015 nbilge collecting pump, make: royson engineers pvt ltd, kolkata , model: rgp 1 mt, capacity: 2cu.m / hr@20mwc, sl no: b 1397 09. n ( b ) renew needle valve.mat:ss dia 1 / 4 287 1015 nbilge collecting pump, make: royson engineers pvt ltd, kolkata , model: rgp 1 mt, capacity: 2cu.m / hr@20mwc, sl no: b 1397 09. n ( c ) carry out alignment of pump with motor & prove for satisfactory perfo 288 1015 nbilge collecting pump, make: royson engineers pvt ltd, kolkata , model: rgp 1 mt, capacity: 2cu.m / hr@20mwc, sl no: b 1397 09. n ( d ) suction & discharge pressure gauges to be renewed.range ( 1 to 1kg / sq.cm ) & 0 10kg / sq cm 289 1016 neqpt / system: system pipes for chemical cleaning / renewal 290 1016 neqpt / system: system pipes for chemical cleaning / renewal n ( a ) dia 150 mm, fuel line pipes, test pr 05 bar 291 1016 neqpt / system: system pipes for chemical cleaning / renewal n ( b ) dia 100 mm, avcat line pipes, test pr 05 bar 292 1016 neqpt / system: system pipes for chemical cleaning / renewal n ( c ) dia 125 mm, sea water pipe line ( bilge / ballast / fire main ) , test pr 05 bar 293 1016 neqpt / system: system pipes for chemical cleaning / renewal n ( d ) dia 80mm, fresh water system pipes, test pr 05bar 294 1016 neqpt / system: system pipes for chemical cleaning / renewal n ( e ) dia 40 mm, fuel lines pipes, test pr. 2cu.m / hr 295 1016 neqpt / system: system pipes for chemical cleaning / renewal n ( f ) dia 32 mm, fuel line pipes, test pr. 5bar 296 1016 neqpt / system: system pipes for chemical cleaning / renewal n ( g ) dia 20mm, fuel line pipes, test pr. 4 bar 297 1016 neqpt / system: system pipes for chemical cleaning / renewal n ( ii ) following system pipes to be renewed along with flanges. 298 1016 neqpt / system: system pipes for chemical cleaning / renewal n ( ii ) following system pipes to be renewed along with flanges. n ( a ) sea water pipe lines ( 40 mm dia ) , port & stbd dg 299 1016 neqpt / system: system pipes for chemical cleaning / renewal n ( ii ) following system pipes to be renewed along with flanges. n ( b ) sea water pipe lines ( 20 mm dia ) , port & stbd dg 300 1017 nmiscellaneous: n ( a ) exhaust laging of both dg exhaust system to be renewed, dia 100mm 301 1017 nmiscellaneous: n ( b ) exhaust laging of dd compressor exhaust system to be renewed, dia 25mm 302 1017 nmiscellaneous: n ( c ) exhaust laging of both main engine exhaust system to be renewed, dia 200mm 303 1017 nmiscellaneous: n ( d ) manufacture of various adapters as per sample 304 1017 nmiscellaneous: n ( e ) fuel transfer hose to be provide. ( length 80mtr ) 305 1017 nmiscellaneous: n ( f ) mechanical cleaning of exhaust system of both dg ( dia 125mm ) 306 1017 nmiscellaneous: n ( h ) 2 kg + 4.5 kg co2 extinguisher to weighed 307 1017 nmiscellaneous: n ( i ) hose basket to be manufactured as per sample 308 1018 nco2 fire fighting sytem maker: shm ship care ( all procedures to be carried as mentioned below and replace defective parts if required ) 309 1018 nco2 fire fighting sytem maker: shm ship care ( all procedures to be carried as mentioned below and replace defective parts if required ) n ( a ) complete drenching system piping to be blown through using hp air to prove system free of blockages 310 1018 nco2 fire fighting sytem maker: shm ship care ( all procedures to be carried as mentioned below and replace defective parts if required ) n ( b ) admit lp air into ring main checking the system for leaks. ensure that all the discharge pipes and nozzles are clear. 311 1018 nco2 fire fighting sytem maker: shm ship care ( all procedures to be carried as mentioned below and replace defective parts if required ) nc ) caliberate pressure gauges fitted in the system. 312 1018 nco2 fire fighting sytem maker: shm ship care ( all procedures to be carried as mentioned below and replace defective parts if required ) n ( d ) co2 discharge nozzles to be opened, checked for chockages, cleaned and fitted back. carry out weighing of co 2 cylinders. 313 1018 nco2 fire fighting sytem maker: shm ship care ( all procedures to be carried as mentioned below and replace defective parts if required ) n ( e ) disconnect operating cables from cylinders. remove old grease and renew grease on all external fittings i.e. pulleys, pull handles, actuators, micro switches and cables and cables ( as applicable ) . ensure freedom of movement of gang release piston , and all cables, pulleys, cocks and valves. examine all nozzles and piping for any obstruction and clean, if required. reconnect cables on completion. 314 1018 nco2 fire fighting sytem maker: shm ship care ( all procedures to be carried as mentioned below and replace defective parts if required ) n ( f ) check the condition of flexible hoses.if required same to be renewed. ( pr 275bar ) 315 1018 nco2 fire fighting sytem maker: shm ship care ( all procedures to be carried as mentioned below and replace defective parts if required ) n ( g ) carry out functional checks of the sensors, alarms, solenoid and safety system. ensure that they are operational. replace / repair componets as required. 316 1018 nco2 fire fighting sytem maker: shm ship care ( all procedures to be carried as mentioned below and replace defective parts if required ) n ( h ) lamp checks of various indication in the control panel. replace if defective 317 1018 nco2 fire fighting sytem maker: shm ship care ( all procedures to be carried as mentioned below and replace defective parts if required ) n ( i ) check klaxon horn and strobe comes on 318 1018 nco2 fire fighting sytem maker: shm ship care ( all procedures to be carried as mentioned below and replace defective parts if required ) n ( k ) check hooter and fire detector 319 1018 nco2 fire fighting sytem maker: shm ship care ( all procedures to be carried as mentioned below and replace defective parts if required ) n ( l ) clean all contacts of relays and push buttons of the control panel. 320 1018 nco2 fire fighting sytem maker: shm ship care ( all procedures to be carried as mentioned below and replace defective parts if required ) n ( m ) carry out insulation and continuity check of wiring and control panel. nnote: the entire co2 system to be proved for functional checks without co2 321 1019 navcat pump, make best & crompton engg.ltd, chennai, capacity 40cu.m@30 kg / sq.cm, 322 1019 navcat pump, make best & crompton engg.ltd, chennai, capacity 40cu.m@30 kg / sq.cm, n ( a ) carry out oveerhauling of pumps, renew bearing &shaft seal. 323 1019 navcat pump, make best & crompton engg.ltd, chennai, capacity 40cu.m@30 kg / sq.cm, n ( b ) suction &discharge presure gauges to be renewed.range 30 0 &0 6bar. 324 1019 navcat pump, make best & crompton engg.ltd, chennai, capacity 40cu.m@30 kg / sq.cm, n ( c ) renew needle valve.mat ss 325 1019 navcat pump, make best & crompton engg.ltd, chennai, capacity 40cu.m@30 kg / sq.cm, n ( d ) carry out alignment of pump with motor &prove for satisfactory perfomance. 326 1020 nsteering system, make : m / s getha eng works, working pressure 104 bar, sl.no 6144 1 ( port ) , 6144 2 ( stbd ) 327 1020 nsteering system, make : m / s getha eng works, working pressure 104 bar, sl.no 6144 1 ( port ) , 6144 2 ( stbd ) n ( a ) change hydraulic filter elements ( `pump suction, return line, reserve line and emergency line filters ) . 328 1020 nsteering system, make : m / s getha eng works, working pressure 104 bar, sl.no 6144 1 ( port ) , 6144 2 ( stbd ) n ( b ) lubtricate power unit motor bearings ( grease xg 272 ) 329 1020 nsteering system, make : m / s getha eng works, working pressure 104 bar, sl.no 6144 1 ( port ) , 6144 2 ( stbd ) n ( c ) lubricate actuator bearings ( grease lg 280 / xg 279 ) 330 1020 nsteering system, make : m / s getha eng works, working pressure 104 bar, sl.no 6144 1 ( port ) , 6144 2 ( stbd ) n ( d ) hand pump to be operated and system to be checked with hand pump for operation, leakages in system to be rectified. 331 1020 nsteering system, make : m / s getha eng works, working pressure 104 bar, sl.no 6144 1 ( port ) , 6144 2 ( stbd ) n ( e ) visually check electric motor and cables. 332 1020 nsteering system, make : m / s getha eng works, working pressure 104 bar, sl.no 6144 1 ( port ) , 6144 2 ( stbd ) n ( f ) mechanical cleaning of propellers and rudders for sea growth during docking of the vessel. and preservation of propeeler using greese to be done during docking periods 333 1021 ndd compressor engine, make kirloskar oil engine, model taf1, sl. no 20.1222 / 1002005 n following work to be carried : 334 1021 ndd compressor engine, make kirloskar oil engine, model taf1, sl. no 20.1222 / 1002005 n following work to be carried : n ( a ) calibration of injector to be done 335 1021 ndd compressor engine, make kirloskar oil engine, model taf1, sl. no 20.1222 / 1002005 n following work to be carried : n ( b ) caliberation of fip & governor assembly to be carried out. 336 1021 ndd compressor engine, make kirloskar oil engine, model taf1, sl. no 20.1222 / 1002005 n following work to be carried : n ( c ) lub oil sump to be drained, cleaned & new oil to be charged in sump. 337 1021 ndd compressor engine, make kirloskar oil engine, model taf1, sl. no 20.1222 / 1002005 n following work to be carried : n ( d ) sump strainers / filter to be renewed. 338 1021 ndd compressor engine, make kirloskar oil engine, model taf1, sl. no 20.1222 / 1002005 n following work to be carried : n ( e ) fuel oil filter to be renewed. 339 1021 ndd compressor engine, make kirloskar oil engine, model taf1, sl. no 20.1222 / 1002005 n following work to be carried : n ( f ) lub oil pressure gauge to be renewed. 340 1021 ndd compressor engine, make kirloskar oil engine, model taf1, sl. no 20.1222 / 1002005 n following work to be carried : n ( g ) renewal of air inlet filter element of engine to be carried out. 341 1021 ndd compressor engine, make kirloskar oil engine, model taf1, sl. no 20.1222 / 1002005 n following work to be carried : n ( h ) engine to be painted post boxing up and proved for satisfactory perfomance. 342 nelectrical work package n2001 nall electrical power components / spares like contactors, overload relays, etc are to to be sourced from navy approved vendors. nimportant note: following points are applicable for all relevant dls and shipyards / firms to consider and quote accordingly. n ( a ) renewal of items / spares: n ( i ) renewal of items / spares wherever mentioned in the qdl to be undertaken by shipyard / firm as per the sample / drawing / details provided by ss / coa / rmt. n ( ii ) shipyard / firm should undertake the routines / overhaul of the equipment including the mandatory spares required for undertaking the same, irrespective of the spares mentioned in the mandatory spares list provided by nd ( v ) . n ( iii ) further, the cost should include the degutting of existing item, supply of new item, fitment and proving of the system post renewal. nfollowing as fitted drawings need to be prepared and handed over to ships staff n ( a ) foundations of new equipment n ( b ) electrical cabling n ( c ) all as and as including internals of control panel ( hull, engineering & electrical ) . n ( d ) aber replacement ( hull, engineering & electrical ) . 343 2001 neqpt / system:main swich board make : l&t , rating: 415v, 3ph, 50hz. n ( a ) msb to be overhauled ( includes defective swiches to be renwed, indication lamp to be renewed, perished control wiring to be renewed with crimping of proper lugs , making sleeves to be put on control wiring and loose wirng to be tied with cable ties ) 344 2001 neqpt / system:main swich board make : l&t , rating: 415v, 3ph, 50hz. n ( a ) msb to be overhauled ( includes defective swiches to be renwed, indication lamp to be renewed, perished control wiring to be renewed with crimping of proper lugs , making sleeves to be put on control wiring and loose wirng to be tied with cable ties ) n ( i ) replacement with new one of selector swiches 3 pole , 3 way, 16 a, 415v 345 2001 neqpt / system:main swich board make : l&t , rating: 415v, 3ph, 50hz. n ( a ) msb to be overhauled ( includes defective swiches to be renwed, indication lamp to be renewed, perished control wiring to be renewed with crimping of proper lugs , making sleeves to be put on control wiring and loose wirng to be tied with cable ties ) n ( ii ) replacement with new one of selector swiches 2 pole , 2 way, 16 a, 415v 346 2001 neqpt / system:main swich board make : l&t , rating: 415v, 3ph, 50hz. n ( a ) msb to be overhauled ( includes defective swiches to be renwed, indication lamp to be renewed, perished control wiring to be renewed with crimping of proper lugs , making sleeves to be put on control wiring and loose wirng to be tied with cable ties ) n ( iii ) replacement with new one of selector swiches 6 pole , 2 way, 16 a, 415v door mounting type , size 48x48 mm 347 2001 neqpt / system:main swich board make : l&t , rating: 415v, 3ph, 50hz. n ( a ) msb to be overhauled ( includes defective swiches to be renwed, indication lamp to be renewed, perished control wiring to be renewed with crimping of proper lugs , making sleeves to be put on control wiring and loose wirng to be tied with cable ties ) n ( iv ) replacement with new one of emergey push button swich, type : mushroom head push turn with 1nc contract, model:hh55c1+hc61b2 348 2001 neqpt / system:main swich board make : l&t , rating: 415v, 3ph, 50hz. n ( a ) msb to be overhauled ( includes defective swiches to be renwed, indication lamp to be renewed, perished control wiring to be renewed with crimping of proper lugs , making sleeves to be put on control wiring and loose wirng to be tied with cable ties ) n ( v ) replacement with new one of led indication lamps fittings of different colors ( red 10, yellow 05 , blue 05, green 10, white 05, amber 05 ) , make: teknic, model :p2plbrr240, input supply 240vac 50hz 349 2001 neqpt / system:main swich board make : l&t , rating: 415v, 3ph, 50hz. n ( b ) replacement with new one of following mccbs n ( firm not to quote ) 350 2001 neqpt / system:main swich board make : l&t , rating: 415v, 3ph, 50hz. n ( b ) replacement with new one of following mccbs n ( i ) make : l &t model:dn2 250 , rating 250a 3 pole, 1 aux contact, +i trip alam, shuunt release 240v ac 50hz, thermal setting 200 250 , magnetinc setting:1500 2500 351 2001 neqpt / system:main swich board make : l&t , rating: 415v, 3ph, 50hz. n ( b ) replacement with new one of following mccbs n ( ii ) make : l &t model:dn2 250 , rating 250a 3 pole, 1 aux contact, +i trip alam, with 240v ac 50hz u / v release, thermal setting 200 250 , magnetinc setting:1500 250071 352 2001 neqpt / system:main swich board make : l&t , rating: 415v, 3ph, 50hz. n ( b ) replacement with new one of following mccbs n ( iv ) auxiliary contactor , make l&t, model mw0 , coil voltage : 240v ac 50hz, with 2no+ 2nc contacts and addon: 2nc 353 2001 neqpt / system:main swich board make : l&t , rating: 415v, 3ph, 50hz. n ( c ) check &calibrate all parameters of insulation monitoring relay , make: selco , model :t3200 354 2001 neqpt / system:main swich board make : l&t , rating: 415v, 3ph, 50hz. n ( c ) operating parameter of insulating monitoring relay ( i ) voltage tolarance :+10 20% of undervoltage ( ii ) power consumption : 2va max ( iii ) frequency range :45 65 hz ( iv ) operating temperature range : 20+70 c ( v ) contact rating :ac 2a, 380v , 250va&dc110v, 2a, 150w ( vi ) dielectric :2500v, 50hz ( vii ) presetting 0 5m ohm ( viii ) accuracy signal :+ / 5% ( of preset valve ) ( ix ) instrument scale 0 5 m ohm ( x ) instrument resistance max 100 ohm 355 2001 neqpt / system:main swich board make : l&t , rating: 415v, 3ph, 50hz. n ( d ) replacement with new one of insulation monitoring relay. make: selco, model:t3200 356 2001 neqpt / system:main swich board make : l&t , rating: 415v, 3ph, 50hz. n ( e ) calibration of following meters, if found defective the same to be replaced 357 2001 neqpt / system:main swich board make : l&t , rating: 415v, 3ph, 50hz. n ( e ) calibration of following meters, if found defective the same to be replaced n ( i ) ammeter : 415v ac, input model ct operated, ct retio 250 / 1a, accuracy class 1, range 0 250a , red mark at 195a, size : 96x96mm, gasket required 358 2001 neqpt / system:main swich board make : l&t , rating: 415v, 3ph, 50hz. n ( e ) calibration of following meters, if found defective the same to be replaced n ( ii ) kw meter : input voltage 415 v ac, 50hz, accuracy class :1 , scale 90 degrees , input current 250 / 1a range 20 0 150kw ( dynemometric ) , red mark at 122 kw, size: 96x96 mm, gasket required 359 2001 neqpt / system:main swich board make : l&t , rating: 415v, 3ph, 50hz. n ( e ) calibration of following meters, if found defective the same to be replaced n ( iii ) frequency meter :reed type, input voltage 415vac 50 hz, accuracy class 1, range 45 50 55 hz size :96x96 mm , gasket required 360 2001 neqpt / system:main swich board make : l&t , rating: 415v, 3ph, 50hz. n ( e ) calibration of following meters, if found defective the same to be replaced n ( iv ) voltmeter :range 0 500v ac, red mark 415v, accuracy class 1, scale 90 degree, vt ratio : direct input size:96x96 mm, gasket required 361 2001 neqpt / system:main swich board make : l&t , rating: 415v, 3ph, 50hz. n ( f ) rubber mat : insulating rubber mat deteriorated. to be renewed with high voltage electrical rubber mat in front of msb. ( thickness 3mm ) make vardhaman model class c 362 2002 n eqpt / system: control panels: the following control panel are to be overhauled &made operational. 363 2002 n eqpt / system: control panels: the following control panel are to be overhauled &made operational. n ( a ) anchor windlass control panel ( including master controller ) 415v, 5.5 / 11 kw, 50 hz. double speed make: electronic control corporation 364 2002 n eqpt / system: control panels: the following control panel are to be overhauled &made operational. n ( b ) ventillation group starter panel, make : electronic control corporation , rating :415v, 3ph, 50hz. and 230 v, 1ph, 50hz combined 365 2002 n eqpt / system: control panels: the following control panel are to be overhauled &made operational. nb ( i ) repair / calibrate with new one of solid state over load relay. make:semens, model:3rb22 / 23 over load relays ( screw connection ) 366 2002 n eqpt / system: control panels: the following control panel are to be overhauled &made operational. n ( c ) boat davit control panel rating : 415v, 3ph, 50 hz. 7.5 hp, make : electronic control corporation 367 2003 neqpt / system: transformer 21 kva make; radiant electronic 415v, 3ph, 50hz / 230v, 3ph , 50hz 368 2003 neqpt / system: transformer 21 kva make; radiant electronic 415v, 3ph, 50hz / 230v, 3ph , 50hz n ( a ) carryout overhaul routines and proove them for satisfactory performance / made operational 369 2003 neqpt / system: transformer 21 kva make; radiant electronic 415v, 3ph, 50hz / 230v, 3ph , 50hz n ( b ) clean it internaly , dust and moisture to be removed and to be painted outside with gray color 370 2003 neqpt / system: transformer 21 kva make; radiant electronic 415v, 3ph, 50hz / 230v, 3ph , 50hz n ( c ) renew the internal wiring of transformer ( in between the connectors to fuse units ) 371 2004 neqpt / system: straight line window wiper & cvs make : rakme engineering , size: stroke 500mm , blade 600mm, motor rating: ac 230 v: 0.5 hp , 1 ph 372 2004 neqpt / system: straight line window wiper & cvs make : rakme engineering , size: stroke 500mm , blade 600mm, motor rating: ac 230 v: 0.5 hp , 1 ph n ( a ) overhaul the gear system and prove them fpr free movement / satisfactory performance 373 2004 neqpt / system: straight line window wiper & cvs make : rakme engineering , size: stroke 500mm , blade 600mm, motor rating: ac 230 v: 0.5 hp , 1 ph n ( b ) fw system line to be proved ( dia 10mm, cu ni ) 374 2004 neqpt / system: straight line window wiper & cvs make : rakme engineering , size: stroke 500mm , blade 600mm, motor rating: ac 230 v: 0.5 hp , 1 ph n ( c ) renew the blades including rubber coambing 375 2004 neqpt / system: straight line window wiper & cvs make : rakme engineering , size: stroke 500mm , blade 600mm, motor rating: ac 230 v: 0.5 hp , 1 ph n ( d ) overhaul the cvs motor and prove it operational. 376 2004 neqpt / system: straight line window wiper & cvs make : rakme engineering , size: stroke 500mm , blade 600mm, motor rating: ac 230 v: 0.5 hp , 1 ph n ( e ) machinery body to be bare metal and painted with one cote of primer and two coat of enamil paint 377 2005 neqpt / system:navigational lighting panels ( ac &dc ) make: electronic control corporation 230v ac / 24 v dc combined ( including internal parts of control panel such as fuse, led indication lamp, control pcbs , connectors etc ) 378 2005 neqpt / system:navigational lighting panels ( ac &dc ) make: electronic control corporation 230v ac / 24 v dc combined ( including internal parts of control panel such as fuse, led indication lamp, control pcbs , connectors etc ) n ( a ) carryout routines mentioned below and prove them for satisfactory performance 379 2005 neqpt / system:navigational lighting panels ( ac &dc ) make: electronic control corporation 230v ac / 24 v dc combined ( including internal parts of control panel such as fuse, led indication lamp, control pcbs , connectors etc ) na ( i ) clean &tighten the all connection with proper lugs, 380 2005 neqpt / system:navigational lighting panels ( ac &dc ) make: electronic control corporation 230v ac / 24 v dc combined ( including internal parts of control panel such as fuse, led indication lamp, control pcbs , connectors etc ) na ( ii ) check the functions of all fuse units, control cards, indication lamp &horn. 381 2005 neqpt / system:navigational lighting panels ( ac &dc ) make: electronic control corporation 230v ac / 24 v dc combined ( including internal parts of control panel such as fuse, led indication lamp, control pcbs , connectors etc ) na ( iii ) if deffective repair them 382 2005 neqpt / system:navigational lighting panels ( ac &dc ) make: electronic control corporation 230v ac / 24 v dc combined ( including internal parts of control panel such as fuse, led indication lamp, control pcbs , connectors etc ) na ( iv ) if un repairable than renew them. 383 2005 neqpt / system:navigational lighting panels ( ac &dc ) make: electronic control corporation 230v ac / 24 v dc combined ( including internal parts of control panel such as fuse, led indication lamp, control pcbs , connectors etc ) n ( b ) if control card found defective repair them 384 2005 neqpt / system:navigational lighting panels ( ac &dc ) make: electronic control corporation 230v ac / 24 v dc combined ( including internal parts of control panel such as fuse, led indication lamp, control pcbs , connectors etc ) n ( c ) renew theled indication lamps with holders 385 2005 neqpt / system:navigational lighting panels ( ac &dc ) make: electronic control corporation 230v ac / 24 v dc combined ( including internal parts of control panel such as fuse, led indication lamp, control pcbs , connectors etc ) n ( e ) renw the fuse units screw type connectors 386 2005 neqpt / system:navigational lighting panels ( ac &dc ) make: electronic control corporation 230v ac / 24 v dc combined ( including internal parts of control panel such as fuse, led indication lamp, control pcbs , connectors etc ) n ( f ) check the circuits ( cables ) in between the control panel & navigational light fitting if there is any fault rectify them 387 2005 neqpt / system:navigational lighting panels ( ac &dc ) make: electronic control corporation 230v ac / 24 v dc combined ( including internal parts of control panel such as fuse, led indication lamp, control pcbs , connectors etc ) n ( g ) renew the cables ( single core cable , 2mm sq ) ( incomming &outgoing ) if they are pershed. 388 2006 neqpt / system: light fittings. n ( a ) renew following light fittings 389 2006 neqpt / system: light fittings. n ( a ) renew following light fittings n a ( i ) navigational light fittings ( ac &dc ) make :m / s arvin industries 230 v for ac, 24v fot dc ( two ties set ) red 03, green 01, white 04 390 2006 neqpt / system: light fittings. n ( a ) renew following light fittings na ( ii ) renew the ac navigational bulbs 230v, 60w 391 2006 neqpt / system: light fittings. n ( a ) renew following light fittings na ( iii ) renew the dc navigational bulbs 24v, 60w 392 2006 neqpt / system: light fittings. n ( a ) renew following light fittings n a ( iv ) renew weather deck light fittings 230v, 60w 393 2006 neqpt / system: light fittings. n ( a ) renew following light fittings na ( v ) renew watertight u glass light fitting incandeescent lamp fittings. 230v, 60w 394 2006 neqpt / system: light fittings. n ( a ) renew following light fittings na ( vi ) replace 230v, 60w lamo with 230v 11 w led lamp, make: syska 395 2006 neqpt / system: light fittings. n ( a ) renew following light fittings n a ( vii ) replace the 230v 200w reflector light fitting with 230v 100 w led light fitting 396 2006 neqpt / system: light fittings. n ( b ) repair and overhaul following light fittings 397 2006 neqpt / system: light fittings. n ( b ) repair and overhaul following light fittings n b ( i ) search light fitting 230v, 1000w 398 2006 neqpt / system: light fittings. n ( b ) repair and overhaul following light fittings nb ( ii ) renew twin tube cfl lamp 230v, 11w 399 2006 neqpt / system: light fittings. n ( b ) repair and overhaul following light fittings n b ( iii ) renew emenrgency light led lamp ( operating range of voltage 13v 24v ) dc , 6w 400 2006 neqpt / system: light fittings. n ( c ) convert all 230v, 2x20w tubelight fitting with 230v, 2x20w led tubelight fitting 401 2006 neqpt / system: light fittings. n ( d ) provide the 20w 230v led tubelights, make:philips / siska 402 2007 n eqpt / system: d / g ( port &stbd ) alarm panel system make : kirloskar and crompton, type :176 bhp ( oem to be in volved ) 403 2007 n eqpt / system: d / g ( port &stbd ) alarm panel system make : kirloskar and crompton, type :176 bhp ( oem to be in volved ) n ( a ) d / g ( port &stbd ) av alaram panel system including control wiring to be completely over hauled, calibrated and proved for satifactory opration. 404 2007 n eqpt / system: d / g ( port &stbd ) alarm panel system make : kirloskar and crompton, type :176 bhp ( oem to be in volved ) n ( b ) repair of dynamo to be carried out 24v dc make :iucas tvs 405 2007 n eqpt / system: d / g ( port &stbd ) alarm panel system make : kirloskar and crompton, type :176 bhp ( oem to be in volved ) n ( c ) overhauling of self starter motor 24v dc, make : iucas tvs 406 2007 n eqpt / system: d / g ( port &stbd ) alarm panel system make : kirloskar and crompton, type :176 bhp ( oem to be in volved ) n ( d ) repair of ievr units, 407 2007 n eqpt / system: d / g ( port &stbd ) alarm panel system make : kirloskar and crompton, type :176 bhp ( oem to be in volved ) n ( e ) calibration of following cutouts of da 408 2007 n eqpt / system: d / g ( port &stbd ) alarm panel system make : kirloskar and crompton, type :176 bhp ( oem to be in volved ) ne ( i ) fresh water temperature cut outs for alarm set point 92 degree c and tripping at set point 97 degrees c 409 2007 n eqpt / system: d / g ( port &stbd ) alarm panel system make : kirloskar and crompton, type :176 bhp ( oem to be in volved ) ne ( ii ) lub oil temp cutout for alarm set point 97 degrees c and trip at 105 degree c 410 2007 n eqpt / system: d / g ( port &stbd ) alarm panel system make : kirloskar and crompton, type :176 bhp ( oem to be in volved ) ne ( iii ) lub oil pressure cut out for alarm set point 1.5 kg / sq cm and tripping set point 0.5 kg / sq cm 411 2007 n eqpt / system: d / g ( port &stbd ) alarm panel system make : kirloskar and crompton, type :176 bhp ( oem to be in volved ) ne ( iv ) over speed cut out for tripping set point 1650 rpm 412 2007 n eqpt / system: d / g ( port &stbd ) alarm panel system make : kirloskar and crompton, type :176 bhp ( oem to be in volved ) ne ( v ) over temperature of alternator for tripping set point 70 degreec 413 2007 n eqpt / system: d / g ( port &stbd ) alarm panel system make : kirloskar and crompton, type :176 bhp ( oem to be in volved ) n ( f ) renew the following sensors / relays if found defective 414 2007 n eqpt / system: d / g ( port &stbd ) alarm panel system make : kirloskar and crompton, type :176 bhp ( oem to be in volved ) nf ( i ) temperature sensors ( 0 to 200 ) danfoss temperature sensor 415 2007 n eqpt / system: d / g ( port &stbd ) alarm panel system make : kirloskar and crompton, type :176 bhp ( oem to be in volved ) nf ( ii ) pressure sensors ( 0 to 10 ) danfoss pressure transmitter 416 2007 n eqpt / system: d / g ( port &stbd ) alarm panel system make : kirloskar and crompton, type :176 bhp ( oem to be in volved ) nf ( iii ) magnetic switch contactors relays 24v dc, make: cummins / kirloskar n 417 2007 n eqpt / system: d / g ( port &stbd ) alarm panel system make : kirloskar and crompton, type :176 bhp ( oem to be in volved ) nf ( iv ) digital rpm meter operating voltage 24v dc 418 2008 neqpt / system: co2 existinguishing system control panel. make :shm shipcare, kolkata 419 2008 neqpt / system: co2 existinguishing system control panel. make :shm shipcare, kolkata n ( a ) carryout complete overhaul of the co2 control panel including renewal of defective parts / componenets ( such as indication led, alarm hooter, control pcbs fuse holders, fuses, connection terminals, perished wiring etc ) and prove it for satisfactory performance. 420 2008 neqpt / system: co2 existinguishing system control panel. make :shm shipcare, kolkata n ( b ) overhaul the motorised siren & flasher make: kheraj type horozontal single mounting 24v, dc, 75w, 6000rpm, range 800 mtrs 421 2008 neqpt / system: co2 existinguishing system control panel. make :shm shipcare, kolkata n ( c ) limit switches ( 05 ) and solenoid valves relays ( 05 ) to be checked, calibrated to be proved for satisfactory operation 422 2008 neqpt / system: co2 existinguishing system control panel. make :shm shipcare, kolkata n ( d ) check, calibrate & set to their set point of heat detectors and smoke detectors, type: nittan uk ns dhg1 set point. 423 2008 neqpt / system: co2 existinguishing system control panel. make :shm shipcare, kolkata n ( e ) check, calibrate & set to their set point of pressure operated switch 1no make: ginger kerr working pressure 3 150bar 424 2008 neqpt / system: co2 existinguishing system control panel. make :shm shipcare, kolkata n ( f ) repair heat detectors and smoke detectors, type:nittan uk ns dhg1 set point 58°c 425 2009 neqpt / system: shore supply box: make : electronic control corporation rating:100 amps, 415v, 3ph, 50hz. 426 2009 neqpt / system: shore supply box: make : electronic control corporation rating:100 amps, 415v, 3ph, 50hz. n ( a ) carryout complete overhaul of the shore supply control panel prove it for satisfactory performance 427 2009 neqpt / system: shore supply box: make : electronic control corporation rating:100 amps, 415v, 3ph, 50hz. n ( b ) renew the indication lamps with holders ( red, yellow, blue ) 428 2009 neqpt / system: shore supply box: make : electronic control corporation rating:100 amps, 415v, 3ph, 50hz. n ( c ) renewal of shore supply panel plastic glass size 24x12 429 2009 neqpt / system: shore supply box: make : electronic control corporation rating:100 amps, 415v, 3ph, 50hz. n ( d ) mechanical cleaning of supply panel board & painted with one cote of primer and two coat of powder coating ( original colour ) from inside any gray color from outside 430 2010 neqpt / system: smf lead acid batteries. make: exide, 200ah, 12v 431 2010 neqpt / system: smf lead acid batteries. make: exide, 200ah, 12v n ( a ) renew the maintainence free battery 432 2010 neqpt / system: smf lead acid batteries. make: exide, 200ah, 12v n ( b ) clean & tighten the all connections with proper lugs, ferrules & connectors 433 2010 neqpt / system: smf lead acid batteries. make: exide, 200ah, 12v n ( c ) renew the battery connectors ( 12+ive and 12 ve ) 434 2010 neqpt / system: smf lead acid batteries. make: exide, 200ah, 12v n ( d ) renew the short link cable ( 50sq.mm multi stand copper cables, length 0.5 mtr ) conncetors 435 2010 neqpt / system: smf lead acid batteries. make: exide, 200ah, 12v n ( e ) renew the parallel link cable ( 50sq.mm multi stand copper cables length 0.5mtr ) with connectors in emergency batteries bank 436 2011 neqpt / system: submersible pump& lts starter, make: mody, capacity 20 tph below mentioned routine to be carried out ( firm not to quote ) 437 2011 neqpt / system: submersible pump& lts starter, make: mody, capacity 20 tph below mentioned routine to be carried out n ( a ) carryout complete overhaul routines and prove them for satisfactory performance / made operational 438 2011 neqpt / system: submersible pump& lts starter, make: mody, capacity 20 tph below mentioned routine to be carried out n ( b ) check & calibrate the olrs / spps / timers / mcbs as per their ratings if defective replace them 439 2011 neqpt / system: submersible pump& lts starter, make: mody, capacity 20 tph below mentioned routine to be carried out n ( c ) check all the fuse units if defective replace them 440 2011 neqpt / system: submersible pump& lts starter, make: mody, capacity 20 tph below mentioned routine to be carried out n ( d ) renew the neoprene rubber gasket for water tight purpose for door 441 2012 neqpt / system: transrectifier cum battery chargering units make: radient electronics ninput: 415v, 3ph, 50hz. output 22v to 29v dc, 63a 442 2012 neqpt / system: transrectifier cum battery chargering units make: radient electronics ninput: 415v, 3ph, 50hz. output 22v to 29v dc, 63a ncarryout complete overhaul routines and proove them for satisfactory performance / made operational. defective componenets tp be replaced with new one ( indication lamp, fuse carrier, fuses, connector terminals, lugs, perished control wring ) 443 2013 neqpt / system: sewage treatment plant; nmake / model : exceltec omnipure 7 me, capacity : 1200 gallon / day. 444 2013 neqpt / system: sewage treatment plant; nmake / model : exceltec omnipure 7 me, capacity : 1200 gallon / day. n ( a ) overhaul control panel fitted onboard and prove it for satisfactory performance. all contactor, timer, overload relay, pcb is to be overhauled and proved for satisfactory performance. 445 2013 neqpt / system: sewage treatment plant; nmake / model : exceltec omnipure 7 me, capacity : 1200 gallon / day. n ( b ) overhaul motor and prove it for satisfactory performance. 446 2013 neqpt / system: sewage treatment plant; nmake / model : exceltec omnipure 7 me, capacity : 1200 gallon / day. n ( c ) perished wiring of control panel is to be changed. ( single core, 1sqmm ) 447 2013 neqpt / system: sewage treatment plant; make / model : exceltec omnipure 7 me, capacity : 1200 gallon / day. n ( d ) all indication lamp is to be renewed. 448 2014 neqpt / system: motors over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. only zz standard bearing ( skf / fag ) is to be used. 449 2014 neqpt / system: motors over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. only zz standard bearing ( skf / fag ) is to be used. n ( a ) anchor windlass motor double speed motor415v 3ph, 50hz, 5.5 / 11 kw 450 2014 neqpt / system: motors over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. only zz standard bearing ( skf / fag ) is to be used. n ( b ) boat dvit hoist / lowering motor, 415v, 3ph, 50 hz, 7.5 hp 451 2014 neqpt / system: motors over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. only zz standard bearing ( skf / fag ) is to be used. n ( c ) dirty oil pump motor, 415 v, 3 ph, 50 hz, 1.5 hp 452 2014 neqpt / system: motors over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. only zz standard bearing ( skf / fag ) is to be used. n ( d ) fuel oil transfer pump motor 415 v, 3 ph, 50 hz, 1.1 kw 453 2014 neqpt / system: motors over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. only zz standard bearing ( skf / fag ) is to be used. n ( e ) air compressor motor 415 v, 3 ph, 50 hz, 3.7 kw 454 2014 neqpt / system: motors over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. only zz standard bearing ( skf / fag ) is to be used. n ( f ) fuel ( hsd ) cargo pump motor 415 v, 3 ph, 50 hz, 15 hp 455 2014 neqpt / system: motors over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. only zz standard bearing ( skf / fag ) is to be used. n ( g ) fresh water cargo pump 415 v, 3 ph, 50 hz, 12.5 hp 456 2014 neqpt / system: motors over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. only zz standard bearing ( skf / fag ) is to be used. n ( h ) fresh water pump motor 415 v, 3 ph, 50 hz, 1.5 hp 457 2014 neqpt / system: motors over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. only zz standard bearing ( skf / fag ) is to be used. n ( j ) main engine primming pump motor 415 v, 3 ph, 50 hz, 1 hp 458 2014 neqpt / system: motors over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. only zz standard bearing ( skf / fag ) is to be used. n ( k ) steering gear compartment supply fan motor 415 v, 3 ph, 50 hz, 0.37 w 459 2014 neqpt / system: motors over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. only zz standard bearing ( skf / fag ) is to be used. n ( l ) pump room supply / exhaust fan motor 415 v, 3 ph, 50 hz, 0.37 w 460 2014 neqpt / system: motors over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. only zz standard bearing ( skf / fag ) is to be used. n ( m ) engine room supply fan motor 415 v, 3 ph, 50 hz, 5.5 kw 461 2014 neqpt / system: motors over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. only zz standard bearing ( skf / fag ) is to be used. n ( n ) engine room exhaust fan motor 415 v, 3 ph, 50 hz, 5.5kw 462 2014 neqpt / system: motors over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. only zz standard bearing ( skf / fag ) is to be used. n ( p ) galley exhaust fan motor 230 v, 1 ph, 50hz, 157w 463 2014 neqpt / system: motors over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. only zz standard bearing ( skf / fag ) is to be used. n ( q ) co2 room exhaust fan motor 230 v, 1 ph, 50 hz, 157 w 464 2015 neqpt / system:motor starter, n ( dol / start delta ) to be overhauled completely and prove them for satisfactory performance. overhauling includes renewal of indication lamp, conector terminals, lugs, perished internal wiring there ever as required. 465 2015 neqpt / system:motor starter, n ( a ) group starter control panel for ventilation rating: 415v, 3 ph, 50hz, and 230 v, 1 ph, 50 hz, combined make: electronic control corperation 466 2015 neqpt / system:motor starter, n ( a ) starter for dirty oil pump motor, 415 v, 3 ph, 50 hz, 1.1 kw 467 2015 neqpt / system:motor starter, n ( b ) starter for air compressor motor, 415 v, 3 ph, 50 hz, 3.7 kw 468 2015 neqpt / system:motor starter, n ( c ) starter for bilges / gs pump motor, 415 v, 3 ph, 50 hz, 7.5 kw 469 2015 neqpt / system:motor starter, n ( d ) starter for fuel cargo pump motor, 415 v, 3 ph, 50 hz, 15 hp 470 2015 neqpt / system:motor starter, n ( e ) starter for steering gear motor, 415 v, 3 ph, 50 hz, 15 hp 471 2015 neqpt / system:motor starter, n ( f ) starter for fresh water cargo pump 415 v, 3 ph, 50 hz, 12.5 hp 472 2015 neqpt / system:motor starter, n ( g ) starter for avcat transfer pump motor, 415 v, 3 ph, 50 hz, 10 hp 473 2015 neqpt / system:motor starter, n ( h ) starter for fresh water cargo pump 415 v, 3 ph, 50 hz, 1.5 hp 474 2015 neqpt / system:motor starter, n ( j ) starter for main engine primming pump motor, 415 v, 3 ph, 50 hz, 1 hp 475 2015 neqpt / system:motor starter, n ( k ) starter for fuel oil seperator motor, 415 v, 3 ph, 50 hz, 5 hp 476 2016 nequipment : sound power telephone system ( firm not to quote ) 477 2016 nequipment : sound power telephone system n ( a ) carryout complete overhauling of sound power telephone system. including repair of telephone handset mic and speaker. prove the system for satisfectory performance ( total spt position 10 ) 478 2017 nair compressor control panel ( firm not to quote ) 479 2017 nair compressor control panel n ( a ) air compressor control panel change over switch & other panels bodies perished, to be renwed / manufactured as per dianentions ( 12 x 12 x 12 ) 480 2017 nair compressor control panel n ( b ) magnetic starter to check for proper operation, repair / renew defective items. 481 2017 nair compressor control panel n ( c ) pressure switch to calibrated 482 2017 nair compressor control panel n ( d ) starter coil to repaired 483 2018 neqpt / system:refrigerator ( d.door ) . nrepair the refrigerators of double door 350ltrs, 5star lg invertor model 484 2019 n eqpt / system:deep freezer nrepair / overhauling of deep freezers 200ltrs ( presently working ) 485 2020 neqpt / system:hot water boiler nmake:spherehot ( brand name ) manufactured by kantilal chinilal & sons applaince pvt ltd., surat, india noverhauling of hot water boiler along with control panel 20ltrs 230v 486 2021 neqpt / system: cooking range with 2 hot plates with oven;430v 3ph 5kw. nmake:spherehot ( brand name ) manufactured by kantilal chinilal & sons applaince pvt ltd., surat, india n ( firm not to quote ) 487 2021 neqpt / system: cooking range with 2 hot plates with oven;430v 3ph 5kw. nmake:spherehot ( brand name ) manufactured by kantilal chinilal & sons applaince pvt ltd., surat, india n ( a ) carryout complete overhaul routines and proove them for satisfactory performance / made operational 488 2021 neqpt / system: cooking range with 2 hot plates with oven;430v 3ph 5kw. nmake:spherehot ( brand name ) manufactured by kantilal chinilal & sons applaince pvt ltd., surat, india n ( b ) heating elements found defective. renew the heating elements ( w type ) 430v, 1500w 489 2022 neqpt / system:split a / cs ncarryout overhauling the 7 in nos spilt a / cs at various locations, 1.5 ton, make:carrier 490 2022 neqpt / system:split a / cs n ( a ) carry out servicing and gas charging of splict ac fitted.renew if found ber . ( a / c capacity 1.5 t ) 491 mandatory spares of poshak cummins main engine ngasket l.o. cooler n121779 492 gasket oil cooler connect n68210 493 element fuel filter n3166555 494 element super lo bypass filter n3873576 n 495 ninjector nar 3239804 496 valve solenoid nar 3240573 497 element l.o. filter n3166554 498 element air filter 499 o ring n212161 500 mandatory spares of poshak kirloskar dg nelement fuel filter n4h.333.03.0.00 501 benzo bolt m 14x15 n50.504.04.000 502 heat exchanger n4h.465.16.0.pr 503 raw water pump n4h.465.19.0.pr 504 water pump sub assembly n4h.052.40.0.00 505 speed control unit esd 5221 nf6.614.02.0.00 506 fuel leak off assembly n6h.1124.30.0.00 507 lub oil cooler assembly n6h.113.60.0.00 508 element l.o. filter n03.040.19.0.00 509 expansion tank n6h.466.28.0.00 510 fuel pipe n6h.081.02.0.00 511 fuel pipe n6h.081.03.0.00 512 element air filter n03.061.40.0.00 513 magnetic pick up n46.179.05.0.00 514 starter ( sm130pe ) nf6.028.01.0.00 515 fuel filter n48.117.10.0.00 516 primary filter element nf6.504.34.0.00 517 electronic governor aseembly nf6.886.10.0.00 518 link for adc c225 gs nf6.741.02.0.00 519 mandatary spares of ingersoll rand air compressor ( model 251 ) npriority valve n70241336 520 filter inlet complete n94495256 521 element filter n70234737 522 valve safety n70239801 523 piston air n30292429 524 set ring n32194276 525 gasket flange n30294227 526 set ring n37138229 527 piston air n30215412 n 528 dry dock and allied services work package n ( a ) docking and undocking charges ( both versions ) nfirm not to quote. docking and undocking will be done by navy in navy permises i.e nd ( v ) / slipway. 529 ( b ) dock blocks preparation & laying out as per docking plan nfirm not to quote. job will be done by navy 530 dock hire charges for an estimated duration of 60 days as per ocr nfirm not to quote. dry dock facility will provided by navy in navy permises i.e nd ( v ) / slipway. 531 wet basin / alongside hire charges for the remaining duration ( i.e. total refit duration of – 60 days docking period ) nfirm not to quote. dry dock facility will will provided by navy in navy permises 532 provision of sufficient lighting for duty staff nfirm to quote. 533 quote for maintenance of two in no. fire lines for the refit duration . nfirm to quote. 534 provision of two transports ( cars ) for entire refit duration ( one for refit co ordinating staff and one for nd ( v ) monitoring team ) for 12 hrs or 100km / day whichever is less n nfirm to quote. 535 provision of stationory / office items for nd ( v ) / refit monitoring team for entire refit duration period. cater budget of rs 2000 / per month. requirement will be intimated rmt / ndv on as requirement basis. payment at actuals. n nnote: firms to quote. 536 mail man services ( 02 nos ) for entire refit duration ( one for user department and one for planning / co ordinating department ) to be provided for 10 hrs per day nfirm to quote. 537 qc inspection for the entire scope of work by third party irs / lrs / abs / qc / tpi for the refit duration as per the qis. nfirm not to quote. services will be provided by nd ( v ) / qc...

Indian Navy - Andhra Pradesh

22486836 tender for offloading of nr of sullage barge v for a total duration of 150 days scheduled w.e.f. 01 jan 2020 ( inclusive of 60 days docking period ) 1 work pakage for nr sb v n hull defect list n001 ndocking nvessel to be docked in both versions. nnote 1: firms not to quote view docking, undocking and dock blocks preparation will be done by navy and the job is required to be carried out in navy premises ( i.e nd ( v ) slipway / drydock ) . nnote 2: last docked in version i on 22 aug b1542017 2 002 ncleaning of under water hull and boot top area nhp jet cleaning of entire under water area and boot top area ( with a pressure not exceeding 3000 psi ) remove the marine growth / barnacles and prepare for survey. nnote: ( i ) u / w area: 425 sqm including boot top 3 003 ncleaning of internal compartments sullage tanks ( 06 nos ) nmanually clean fuel tanks free of accumulated fuel and residual muck and present for survey. 4 004 ncleaning of internal compartments nmanually clean following internal compartments free of accumulated water and residual muck and present for survey. ( a ) cable locker 5 004 cleaning of internal compartments manually clean following internal compartments free of accumulated water and residual muck and present for survey. ( b ) forepeak tank 6 004 ncleaning of internal compartments nmanually clean following internal compartments free of accumulated water and residual muck and present for survey: ( c ) cofferdam 1 7 004 cleaning of internal compartments manually clean following internal compartments free of accumulated water and residual muck and present for survey: ( d ) cofferdam 2 8 004 cleaning of internal compartments manually clean following internal compartments free of accumulated water and residual muck and present for survey: ( e ) cofferdam 3 9 004 cleaning of internal compartments manually clean following internal compartments free of accumulated water and residual muck and present for survey: ( f ) cofferdam 4 10 004 cleaning of internal compartments manually clean following internal compartments free of accumulated oily water and grime / muck and present for survey: ( g ) pump room ( bilges: 120 sqm, bulkheads:140 sqm ) 11 004 cleaning of internal compartments asp manually clean following internal compartments free of accumulated oily water and grime / muck and present for survey: ( h ) steering gear room ( bilges: 24 sqm, bulkheads:76 sqm ) 12 05 cleaning of void spaces ( 06 nos ) manually clean 06 nos void spaces of all residues and present for survey. note: cleaning to be done with detergent water, oil absorbing / removing solution or powder, rags, cotton jute etc. quote to include cost of cleaning material also. 13 006 hull survey visual survey external and internal structures carry out visual and hammer survey in accordance with no 01 / 15 of under water hull , boot top area, above water hull, super structure, weather decks and all internal compartments ( i.e. fw tanks, ballast tanks, fore peak tank, engine room, steering compartment, fo tanks, cofferdams, all stiffeners and deck fittings etc. ) all manholes to be inspected for water tightness, chalk impression test to be carried out. note: ( i ) ls for survey ( ii ) firm to submit 07 copies of hull survey report . 14 007 hull survey utg survey external and internal structures carry out utg survey in accordance with no 01 / 15 of under water hull , boot top area, above water hull, super structure, weather decks and all internal compartments ( i.e. fw tanks, ballast tanks, fore peak tank, engine room, steering compartment, fo tanks, cofferdams, all stiffeners and deck fittings etc. ) all manholes to be inspected for water tightness, chalk impression test to be carried out. note: ( i ) ls for survey ( ii ) firm to submit 07 copies of hull survey report . ( iii ) quote for utg survey points 15 008 steel renewal nquote for steel renewal at various locations as per survey report nnote : quoted repair cost shall include cost of both sides blasted and primed is 2062 grade `b’ quality steel. degutting / regutting / renewal of all obstructions in way of steel renewals including lagging / panelling, minor fittings / equipments with their foundations, ventilation systems, staging etc., as indicated by survey team / rmt, proving of the weld runs by non destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal was undertaken etc. 16 009 build ups n ( a ) carry out build ups as indicated by the hull survey team / surveyor size 25 x 25 mm 17 009 build ups n ( b ) carry out build ups as indicated by the hull survey team / surveyor size 50 x 50 mm 18 010 fairing of deformed structure n carryout fairing of deformed structures as indicated by hull survey team / surveyor 19 011 re welding ncarry out re welding runs on weld seams as indicated by hull survey team / qc / rmt. 20 012 draft marks ndraught marks corroded / eaten away, to be renewed and painted. both roman and numeric. 21 013 sacrificial anodes n ( a ) renew sacrificial anodes those consumed more than 50% type: mk i note: anodes will be supplied by navy / coy. 22 013 sacrificial anodes n ( b ) renew sacrificial anodes those consumed more than 50% type: mk vi note: anodes will be supplied by navy / coy. 23 014 surface preparation under water area nsurface preparation to sa 2.5 std using grit blasting on paint damaged areas / renewed plate areas as per the paint oem rep recommendation for paint application. ( areas include c channel for rubber fenders ) 24 015 painting under water area jotun scheme. paint under water area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( a ) 1st coat: primer penguard primer 50 microns 25 015 painting under water area jotun scheme. paint under water area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( b ) 2nd coat: anti corrosive jotacote universal ( aluminium ) 150 microns 26 015 painting under water area jotun scheme. paint under water area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( c ) 3rd coat: anti corrosive jotacote universal ( grey ) 150 microns 27 015 painting under water area jotun scheme. paint under water area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( d ) 4th coat: tie coat: safeguard es 125 microns 28 015 painting under water area painting jotun scheme. paint under water area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( e ) 5th coat: a / f: seaquantum ultra ( brown / light red ) 150 microns 29 015 painting under water area jotun scheme. paint under water area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( f ) 6th coat: a / f: seaquantum ultra ( red brown / dark red ) 150 microns 30 015 painting under water area jotun scheme. paint under water area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( g ) 7th coat: a / f: seaquantum ultra ( brown / light red ) 150 microns 31 016 surface preparation boot top area nsurface preaparation to sa 2.5 standards using grit blasting on paint damaged areas / renewed plate areas as per the paint oem rep recommendation for paint application. ( areas include c channel for rubber fenders ) 32 017 painting boot top area jotun scheme. paint boot top area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( a ) 1st coat: primer penguard primer 50 microns dft 33 017 painting boot top area jotun scheme. paint boot top area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( b ) 2nd coat: anti corrosive jotacote universal ( aluminium ) 150 microns dft 34 017 painting boot top area jotun scheme. paint boot top area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( c ) 3rd coat: anti corrosive jotacote universal ( grey ) 150 microns dft 35 017 painting boot top area jotun scheme. paint boot top area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( d ) 4th coat: tie coat: safeguard es 125 microns dft 36 017 painting boot top area jotun scheme. paint boot top area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( e ) 5th coat: a / f: seaquantum ultra ( brown / light red ) 150 microns dft 37 017 painting boot top area jotun scheme. paint boot top area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( f ) 6th coat: a / f: seaquantum ultra ( red brown / dark red ) 150 microns dft 38 017 painting boot top area jotun scheme. paint boot top area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( g ) 7th coat: a / f: seaquantum ultra ( black ) 150 microns dft 39 018 surface prepartion above water area and bulwark including guardrails carry out mechanical cleaning to st3 standard for paint application as per survey report by paint oem rep 40 019 painting above water area and bulwark including guardrails jotun scheme. paint above water area with following paint scheme.note: quoted repair cost shall be inclusive of cost of paints also ( a ) 1st coat: penguard primer 50 microns dft 41 019 painting above water area and bulwark including guardrails jotun scheme. paint above water area with following paint scheme.note: quoted repair cost shall be inclusive of cost of paints also ( b ) 2nd coat: jotamastic 80 ( grey / red brown ) 125 microns dft 42 019 painting above water area and bulwark including guardrails jotun scheme. paint above water area with following paint scheme.note: quoted repair cost shall be inclusive of cost of paints also ( c ) 3rd coat: jotamastic 80 ( grey / red brown ) 125 microns dft 43 019 painting above water area and bulwark including guardrails jotun scheme. paint above water area with following paint scheme.note: quoted repair cost shall be inclusive of cost of paints also ( d ) 4th coat: hard top xp grey 60 microns dft 44 020 surface prepartion super structure and deck fittings carry out mechanical cleaning to st3 standard as per survey report of paint oem for paint application. 45 021 painting super structure and deck fittings jotun scheme. paint superstructure area with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( a ) 1st coat: primer penguard primer 50 microns dft 46 021 painting super structure and deck fittings jotun scheme. paint superstructure area with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also ( b ) 2nd coat: jotamastic 80 ( red ) 125 microns dft 47 021 painting super structure and deck fittings jotun scheme. paint superstructure area with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also ( c ) 3rd coat: jotamastic 80 ( grey ) 125 microns dft 48 021 painting super structure and deck fittings jotun scheme. paint superstructure area with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also ( d ) 4th coat: hard top xp grey 7040 60 microns dft 49 022 surface prepartion weather decks carry out hydro jet blasting of entire weather deck, bridge deck and flag deck to sa 2.5 standards. 50 023 painting paint weather decks jotun scheme. paint weather decks with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( a ) 1st coat: primer penguard primer 50 microns dft 51 023 painting paint weather decks jotun scheme. paint weather decks with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( b ) 2nd coat: jotamastic 87 150 microns dft 52 023 painting paint weather decks jotun scheme. paint weather decks with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( c ) 3rd coat: jota armour 800 microns dft 53 024 surface prepartion internal compartments fore peak tank, cable locker and cofferdam carry out mechanical cleaning to st 3 standard as per survey report of paint oem for fore peak tank , cable locker and cofferdam ( 04 ) . 54 025 painting fore peak tanks, ballast tanks and cable locker jotun scheme. paint fore peak tanks, ballast tanks and cable locker with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( a ) 1st coat: primer penguard primer 50 microns dft 55 025 painting fore peak tanks, ballast tanks and cable locker jotun scheme. paint fore peak tanks, ballast tanks and cable locker with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also ( b ) 2nd coat: anticorrosive balloxy hb light ( bieze ) 150 microns 56 025 painting fore peak tanks, ballast tanks and cable locker jotun scheme. paint fore peak tanks, ballast tanks and cable locker with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also ( c ) 3rd coat: anticorrosive balloxy hb light ( grey ) 150 microns 57 026 surface prepartion internal compartments pump room and asp compartment including bilges carry out mechanical cleaning to st 3 standard as survey report of paint oem for paint application. ( i ) pump room ( bilges 120 sqm, bulkheads 140 ) ( ii ) asp ( bilges 24 sqm, bulkheads 76 ) 58 027 painting machinery bilges jotun scheme. paint bilges of pump room and asp compartment with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( a ) 1st coat: primer penguard primer 50 microns dft 59 027 painting machinery bilges jotun scheme. paint bilges of pump room and asp compartment with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( b ) 2nd coat: anticorrosive jotacote universal ( aluminium ) 150 microns 60 027 painting machinery bilges jotun scheme. paint bilges of pump room and asp compartment with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( c ) 3rd coat: anticorrosive jotacote universal ( grey ) 150 microns 61 027 painting machinery bilges jotun scheme. paint bilges of pump room and asp compartment with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( d ) 4th coat: penguard top coat 50 microns. 62 028 painting bulkheads of pump room and asp jotun scheme. paint bulkheads and deckheads of pump room and asp compartments with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( a ) 1st coat: primer penguard primer 50 microns dft 63 028 painting bulkheads of pump room and asp jotun scheme. paint bulkheads and deckheads of pump room and asp compartments with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( b ) 2nd coat: interior fire retardent paint 100 microns 64 028 painting bulkheads of pump room and asp jotun scheme. paint bulkheads and deckheads of pump room and asp compartments with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( c ) 3rd coat: interior fire retardent paint 100 micron 65 029 cleaing of ru tanks cleaning of fuel oil ru tanksmanually scrap and clean to bare metal and apply two coats of om 750 oil in following tanks: fuel oil ru tanks ( 02nos ) note: quoted cost shall be inclusive of cost of oil also. 66 030 surafce prepartion bulkheads, decks and dadoes of internal compartments carry out mechanical cleaning of all stores ( naval stores, battery stores, co2 room, paint stores, pump store, deck store and eletrical control room ) to st 3 standard as survey report of paint oem for paint application. 67 031 painting internal compartments decks and dadoes jotun scheme. carry out painting of internal compartments decks and dadoes at following locations: naval store, battery store, co2 room, paint store, pump store, deck store and eletrical control room. ( a ) 1st coat: primer penguard 1x50 microns 68 031 painting internal compartments decks and dadoes jotun scheme. carry out painting of internal compartments decks and dadoes at following locations: naval store, battery store, co2 room, paint store, pump store, deck store and eletrical control room. ( b ) 2nd coat : jotamastic 80 grey 1 x 150 microns 69 031 painting internal compartments decks and dadoes jotun scheme. carry out painting of internal compartments decks and dadoes at following locations: naval store, battery store, co2 room, paint store, pump store, deck store and eletrical control room. ( c ) 3rd coat ; burnswick green finishing paint 100 microns 70 032 painting internal compartments bulkheads jotun scheme. carry out painting of internal compartments bulkheads and deck heads area at following locations: naval store, battery store, co2 room, paint store, pump store, deck store and eletrical control room. ( a ) 1st coat: primer penguard 1x50 microns 71 032 painting internal compartments bulkheads jotun scheme. carry out painting of internal compartments bulkheads and deck heads area at following locations: naval store, battery store, co2 room, paint store, pump store, deck store and eletrical control room. note: quoted repair cost shall be inclusive of cost of paints also. ( b ) 1st coat: interior fire retardent paint 100 microns 72 032 painting internal compartments bulkheads jotun scheme. carry out painting of internal compartments bulkheads and deck heads area at following locations: naval store, battery store, co2 room, paint store, pump store, deck store and eletrical control room. note: quoted repair cost shall be inclusive of cost of paints also. ( c ) 2nd coat: interior fire retardent paint 100 microns 73 033 surface preaprtion void spaces carry out surface preaprtion to st 3 standards of void spaces as survey report of paint oem for paint application. 74 034 painting void spaces jotun scheme. carry out painting of 06 void spaces with following paint scheme ( a ) 1st coat penguard primer 50 microns 75 034 painting void spaces jotun scheme. carry out painting of 06 void spaces with following paint scheme ( b ) 2nd coat coat jotacoat universal ( al ) 150 microns 76 034 painting void spaces jotun scheme. carry out painting of 06 void spaces with following paint scheme ( c ) 2nd coat coat jotacoat universal ( grey ) 150 microns 77 034 painting void spaces jotun scheme. carry out painting of 06 void spaces with following paint scheme ( d ) 3rd coat t penguard top coat 50 microns 78 035 surface preaprtion sullage tanks carry out surface preaprtion to st 3 standards of all sullage tanks / fuel tanks as survey report of paint oem for paint application. 79 036 painting sullage tanks jotun paint scheme paint all sullage tanks with following paint scheme: ( a ) tankguard hb light grey 150 microns 80 036 painting sullage tanks jotun paint scheme paint all sullage tanks with following paint scheme: ( b ) tankguard hb greyish green 150 microns 81 037 anchor and anchor chain cable. anchor and anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at ndv / mfab dept. paint with black bituminous paint post survey iaw no 12 / 2001 and refit back. nnote : the job involves removal of anchors, chain cables and accessories, laying out for cleaning, painting and refitment. ( a ) anchors 03 82 037 anchor and anchor chain cable. anchor and anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at ndv / mfab dept. paint with black bituminous paint post survey iaw no 12 / 2001 and refit back. ( b ) chain cable ( dia 17.5mm ) ( i ) full shackles 08 ( ii ) half shackles 04 83 037 anchor and anchor chain cable. anchor and anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at ndv / mfab dept. paint with black bituminous paint post survey iaw no 12 / 2001 and refit back. n ( c ) swivel piece 84 037 anchor and anchor chain cable. anchor and anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at ndv / mfab dept. paint with black bituminous paint post survey iaw no 12 / 2001 and refit back. n ( d )  lug less joining shackles 85 037 anchor and anchor chain cable. anchor and anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at ndv / mfab dept. paint with black bituminous paint post survey iaw no 12 / 2001 and refit back. n ( e ) d shackles 86 037 anchor and anchor chain cable. anchor and anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at ndv / mfab dept. paint with black bituminous paint post survey iaw no 12 / 2001 and refit back. ( f ) chain stopper / compressor 87 038 anchor windlass completely strip & overhaul anchor windlass, renew brake linings, refit and prove for satisfactory operation. quoted price to include cost of liners and spares also. 88 039 bollards ( a ) twin bollard and foundation corroded and thinned. to be repaired / renewed as per hull survey report. doubler plate area 420mmx420mm, dia of pipe 219.1mm, height 1460mm, foundation area 400mmx400mmx90mm, thickness of plate 10mm towing gear securing rod dia 50mm. 89 039 bollards ( b ) towing bollard and foundatiosn corroded and thinned. to be repaired / renewed as per hull survey report. doubler plate area 420mmx420mm, dia of pipe 219.1mm, height 1460mm, foundation area 400mmx400mmx90mm, thickness of plate 10mm towing gear securing rod dia 50mm. 90 040 guardrails ( a ) fixed verticals guardrail stanchions on weather deck deformed / bent from deck. to be repaired / renewed. ( mat ms angle bar ) 91 040 guardrails ( b ) fixed horizontal guardrails on weather deck deformed / bent to be repaired / renewed. ( mat ms ) 92 041 metallilc chain guardrails metallic chain guardrails of stanchions corroded to chipped and cleaned. nrenewal cost should include cost of material also. 93 042 sanitry sysytem soil pipes to be removed, chemically cleaned, pressure tested and fitted back in situ. mat: ms , dia: 04inch. ( pressure: 3kg / cm2 ) 94 043 ventilation ( a ) mushroom type natural exhaust ventilator to be removed, cleaned / overhauled and fitted back. renew if required. details mush room head dia 500 mm, height 1550 mm 95 043 ventilation ( b ) mushroom type forced supply ventilator to be removed, cleaned / overhauled and fitted back. renew if required. details mush room head dia 370 mm, height 1550 mm, 96 044 drainage system drain pipe leading from mast deck to 01 deck and no. 1 deck to engine room corroded, thinned and holed, to be renewed. mat: gi, 03 inch dia. 97 045 sanitry system sanitry fittingss in crew bathrooms and wc. ( a ) ss wash basin to be renewed. note: quoted repair cost shall include cost all items / spares. ( a ) wash basin 98 045 sanitry system sanitry fittingss in crew bathrooms and wc. sanitry fittings in crew bathrooms and wc to be renewed. ( b ) provision ss tap: 1 / 2 inch 99 045 sanitry system sanitry fittingss in crew bathrooms and wc. ( c ) ss supply pipeline broken / damaged to be renewed / repaired. mat : cu ni, dia: ½ inch 100 045 sanitry system sanitry fittingss in crew bathrooms and wc. ( d ) drain pipeline broken / damaged to be renewed / repaired. mat ms, dia 2 inch 101 045 sanitry system sanitry fittingss in crew bathrooms and wc. ( e ) flush valves to be renewed. mat brass, dia 2 102 046 fresh water system crew bathrooms and wc. .note: quoted repair cost shall include cost all items / spares. ( a ) ss stop cock 1’’ to be renewed 103 046 fresh water system crew bathrooms and wc. ( b ) shower head to be fitted in bathrooms note: quoted repair cost shall include cost all items / spares. 104 047 tyre fenders tyre fender damaged on p&s side , to be renwed with used aircraft tyre fenders moulded with 8 mm white natural rubber. mat rubber, colour white . no painting or coating of any other form will be permitted. vendors to adhere to sow ( a ) od 750mm; id 450 mm , width 250 mm 105 047 tyre fenders provision of securing arrangment in all tyre fenders for fitment on ship side. ( b ) chain securing brackets / deck eyes. 106 047 tyre fenders provision of securing arrangment in all tyre fenders for fitment on ship side ( c ) provission of securing chain. 16 mm dia for tyre fenders 107 047 tyre fenders provision of securing arrangment in all tyre fenders for fitment on ship side ( d ) bush for passing chain on tyres. 108 047 tyre fenders provision of securing arrangment in all tyre fenders for fitment on ship side ( e ) provision of d shackles for tyre fenders 109 048 d shape fenders ( a ) d shaped rubber fenders damaged / perished to be renewed. color grey / white length 1000 mm length location 44 on shipside and 05 on transom material epdm rubber as per nes170 110 048 d shape fenders securing brackets ( b ) fender securing flat bar brackets to be repaired / renewed as necessasry. ( mat ms ) . size : 1100mm x 110mm x 08mm 111 048 d shape fenders securing brackets ( c ) fender securing c clamp brackets to be repaired / renewed as necessasry. ( mat ms ) . size : 200mm x 110mm x 08mm 112 049 pneumatic fender. ( a ) provision of pneumatic fender on ( p & s ) side at fwd and aft nspecification of fenders: size 660x1160 mm , mat neoprene blended rubber having 65 % min neoprene content , colour white, tensile strength 180 kgf / cm2, elongation at break 400 % min, hardness 700 max, tear strength min 40 kgf / cm2, compression set 30 % max, abrasion resistance 0.5 cc max. n 113 050 pneumatic fender securing arrangement ( a ) fabrication of ms eye with 08 mm thickness on shipside. 114 050 pneumatic fender securing arrangement ( b ) provision of d shackles, dia 16 mm 115 050 pneumatic fender securing arrangement ( c ) provision of securing chain 16 mm dia length rmt 4 mtr each 116 051 sky light ss butterfly nuts and tumbler bolt of engine room sky light &exhaust flaps broken. to be renewed. dia of bolt : 10 mm & 6 inch length ( mat ms ) . 117 052 rubber beading rubber beading of following doors, hatch and skylight perished / cracked to be renewed and chalk test to be proved. ( epdm rubber with shore hardness 50 + 5o a ) ( a ) wt door 118 052 rubber beading rubber beading of following doors, hatch and skylight perished / cracked to be renewed and chalk test to be proved. ( epdm rubber with shore hardness 50 + 5o a ) ( b ) wt hatch 119 053 apt air pressure test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg / cm2. nnote: apt and proving of those tanks wherein steel renewal undertaken as part of steel renewal dl. 0003 ( c ) above is that of firms liability with no additional cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this dl. serial. ( a ) forepeak tanks 120 053 apt air pressure test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg / cm2. nnote: apt and proving of those tanks wherein steel renewal undertaken as part of steel renewal dl. 0003 ( c ) above is that of firms liability with no additional cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this dl. serial. ( b ) fuel / sullage tank 121 053 apt air pressure test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg / cm2. nnote: apt and proving of those tanks wherein steel renewal undertaken as part of steel renewal dl. 0003 ( c ) above is that of firms liability with no additional cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this dl. serial. ( c ) void space 122 053 apt air pressure test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg / cm2. nnote: apt and proving of those tanks wherein steel renewal undertaken as part of steel renewal dl. 0003 ( c ) above is that of firms liability with no additional cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this dl. serial. ( d ) cable locker 123 053 apt air pressure test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg / cm2. nnote: apt and proving of those tanks wherein steel renewal undertaken as part of steel renewal dl. 0003 ( c ) above is that of firms liability with no additional cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this dl. serial. ( e ) cofferdams 124 054 bilge paltform ( a ) renew bilge platform plate. material aluminium chequerd plate, thickness 05 mm 125 054 bilge platform ( b ) supporting brackets to be renewed where ever required ( mat ms ) . securing nut&bolts to be of mat ss. 126 055 cleats ms cleats perished / thinned to be renewed ( size 28 mm ) . quote shall includes nuts bolts and associated accessories 127 056 ventilation system ( a ) breather pipes of various tanks on upper deck corroded and thinned including wire mesh, to be repaired / renewed. ( mat. gi pipe ) pipe dia 2 1 / 2 inch 128 056 ventilation system ( b ) deck distance piece and flanges corroded to be renewed including rubber joints. dia 150mm 129 056 ventilation system ( c ) ventilation trunking wire mesh to be renewed at damaged areas. size: 400mmx600mm 130 057 deck underlay dry compatments deck underlay ( macrotech ) to be repaired / renewed at uprooted / damaged / steel renewed, accommodation areas, wheel house and alleways. ( a ) surface preparation and application of erop. and mass 98. 131 057 deck underlay dry compatments deck underlay ( macrotech ) to be repaired / renewed at uprooted / damaged / steel renewed, accommodation areas, wheel house and alleways.. ( b ) surface preparation to be carried out by buffing on mass 98 and application of mass 96. 132 057 deck underlay dry compatments deck underlay ( macrotech ) to be repaired / renewed at uprooted / damaged / steel renewed, accommodation areas, wheel house and alleways.. ( c ) surface preparation and application of sealer coat on entire area 133 058 deck underlay wet compartments deck underlay ( macrotech ) to be repaired / renewed in bathrooms at uprooted / damaged / steel renewed. ( a ) surface preparation and application of erop. and mass 98. 134 058 deck underlay wet compartments deck underlay ( macrotech ) to be repaired / renewed in bathrooms at uprooted / damaged / steel renewed. ( b ) surface preparation to be carried out by buffing on mass 98 and application of mass 96. 135 058 deck underlay wet compartments deck underlay ( macrotech ) to be repaired / renewed in bathrooms at uprooted / damaged / steel renewed. ( c ) surface preparation and application of sealer coat on entire area 136 059 deck underlay dadoe area deck underlay ( macrotech ) to be repaired / renewed in bathrooms. ( a ) surface preparation and application of erop. and mass 98. 137 059 deck underlay dadoe area deck underlay ( macrotech ) to be repaired / renewed in bathrooms. ( b ) surface preparation to be carried out by buffing on mass 98 and application of mass 96. 138 059 deck underlay dadoe area deck underlay ( macrotech ) to be repaired / renewed in bathrooms. ( c ) surface preparation and application of sealer coat on entire area 139 060 wt hatches wt hatch clips to be removed, cleaned, greased and refitted wt hatch ( 0.6m x 0.6m ) 140 061 wt doors wt door clips to be removed, cleaned, greased and refitted wt doors 141 062 nwt nwt wooden door of wheel house perished, to be repaired / renewed including cylindrical door lock. 142 063 manhole rubber joints perished, to be renewed ( a ) joints 143 063 manhole ( b ) studs of manholes perished, to be renewed ( only defective studs to be renewed as per survey report ) ms studs with nut, size 20 mm 144 063 manhole ( c ) manhole covers corroded / thinned. to be renewed. mat is 2062 grade b steel. size 2 x 1.5 145 064 locking arrangment ( a ) mortise locks in accomodation areas defective to be renewed. 146 064 locking arrangment ( b ) ms hasp staple / locking arrangemet on ms door and hatches corroded / broken / damaged to be renewed as per sample fitted. 147 065 name board following name board perished / damaged, to be renewed / repaired. ( a ) repair / renewal of vessel name board including electroplating to be carried out on ship side 02 148 065 name board following name board perished / damaged, to be renewed / repaired. ( b ) vessel illuminated board with perspex sheet 01 149 065 name board following name board perished / damaged, to be renewed / repaired. ( c ) painting of vessel name on bulwark / ship side in both hindi and english with fluorescent paint 02 150 066 furniture ( a ) crca kit lockers perished , to be renewed ( 90x80x45 cm ) 151 066 furniture ( b ) crca standing lockers perished, to be renewed ( 183x40x45 cm ) 152 066 furniture ( c ) chairs in crew accomadation persihed / damaged , to be renewed 153 066 furniture ( d ) wooden table damaged / pershed to be renewed 154 066 furniture ( e ) wood paneling in crew rest room and wheel house damged / perished, to be renewed 155 engineering defect list n nsullage pump engine, make: m / s greaves, model: 3twa, type: ( air cooled, 4 stroke, vertical inline, diesel fuelled ) , sl no: ( port 1108031010027, stbd 1108031010026 ) rating: 25hp, rpm: 1500 156 1001 nsullage pump engine n ( a ) renewal of flexible hoses ( en 853 2sn wire braid, dia 15 mm, with st 1 / 4 inch, unf male x banjo 157 1001 nsullage pump engine ( b ) air intake filter to be renewed ( part no. 271 3700 14 ) 158 1001 nsullage pump engine ( c ) renewal of engine oil, oil will be supplied by navy 159 1001 nsullage pump engine ( d ) renewal of corrosion plug as per sample ( dia 10 mm, length 40 mm ) 160 1001 nsullage pump engine ( e ) renew fuel oil filters elements . ( part no. 9451 037 401& 9451 037 420 ) 161 1001 nsullage pump engine ( f ) renewal of oil filter ( part no.500 2175 19 ) 162 1001 n sullage pump engine ( g ) engine to be started for trial for 30 minutes. 163 sullage pump make: m / s tushaco pump, type: progressive, cavity screw, model: t1s 1450.1, sl no: ( port 105182 / 5212, stbd 105182 / 5211 ) , capacity: 60tph, total head 15mwc, speed 300rpm 164 1002 n sullage pump ( a ) overhauling of pumps to be done. includes removal, renewal weardown parts and fit back. 165 1002 nsullage pump ( b ) performance trial for 30 minutes post overhauling. 166 stripping pump engine, make: m / s greaves, type: air cooled, 4 stroke, electric start diesel engine, speed: 3000rpm, rating: 7.4bhp, sl no: ( port a0l0403225, stbd a0l0403224 ) 167 1003 nstripping pump engine ( a ) lub oil sump to be drained, cleaned. ( sump capacity 5 liters ) 168 1003 n stripping pump engine ( b ) renew air filter element 169 1003 n stripping pump engine ( c ) renew fuel oil filters element . 170 1003 n stripping pump engine ( d ) engine to be started for trial for 30 minutes. 171 stripping pump make: m / s b e pump, model: sh80 140n1 dgs2 316, type: horizontal, self priming, centrifugal, capacity: 60tph, total head: 15mwc, sl no: port 358898, stbd 358899. 172 1004 nstripping pump ( a ) overhauling of pumps includes removal, renewal weardown parts ( shaft, mechanical seals, impeller, gaskets ) and fitted back. 173 1004 nstripping pump ( b ) performance trial for 30 minutes post overhauling. 174 genset make: kirloskar, type: ha394, sl no: 03.2017 / 1021253, rating: 23.55kw, 32hp 175 1005 n diesel generator n ( a ) renewal of flexible hoses ( en 853 2sn wire braid, dia 15 mm, with st 1 / 4 inch, unf male x banjo ) 176 1005 n diesel generator n ( b ) air intake filter to be renewed. 177 1005 n diesel generator ( c ) renewal of engine oil qty 10ltr, oil will be supplied by navy 178 1005 n diesel generator n ( e ) renewal of fuel filters ( pre filter µ filter element ) ( part no. 34.032.02.0 & 34.032.03.0 ) 179 1005 n diesel generator ( f ) renewal of oil filter ( part no. 03.040.19.0 ) 180 1005 ndiesel generator ( g ) engine to be started for trial for 30 minutes. 181 valve to be overhauled make vijoli, type screw down, overhauling includes renewal of wear down parts ( spindle, disc ) , mat gm 182 1006 n valves ( a ) dia 150 mm 183 1006 n valves ( b ) dia 50 mm 184 1006 n valves n ( c ) dia 15 mm 185 1006 n valves n ( d ) dia 80 mm 186 rubber expansion bellow ( with flange ) to be renewed. working pr 5 bar, fluid sullage oil 187 1007 nbellows n ( a ) dia 150 mm 188 1007 nbellows n ( b ) dia 80 mm 189 three way plug cock to be overhauled, mat ss 190 1008 ncocks n ( a ) dia 150 mm 191 1008 ncocks ( b ) dia 80 mm 192 semi rotary hand pump to be overhauled make venus, model n97 193 1009 n hand pumps ( a ) pump to be overhauled includes renewal of wear down parts. 194 1009 nhand pumps ( b ) wooden handled to be renewed. 195 1010 noverhauling of system v / v nvalves n ( a ) sdnr globe v / v . dia 150 mm 196 1010 noverhauling of system v / v nvalves n ( b ) sdnr globe suction v / v of sullage tank. dia 80 mm 197 1011 nrelief valve 80mm dia relief valve to be removed, overhauled, calibrate ( pr 04bar ) and fitted back. 198 glycerine filled bourden pr gauges to be renewed, make an instruments 199 1012 npr. gauges ( a ) range: 01 to 01 kg ( suction pr gauge ) 200 1012 n pr. gauges ( b ) range: 0 to 04 kg ( discharge gauge ) 201 co2 fire fighting sytem maker: shm ship care ( all procedures to be carried as mentioned below and replace defective parts if required ) 202 1013 nco2 fire fighting system ( a ) co2 cylinders to be removed, chemically cleaned, pressure tested and recharged with 45kg co2 203 1013 nco2 fire fighting system ( b ) non return valves on cylinder heads to be overhauled. 204 1013 nco2 fire fighting system ( c ) co2 discharge nozzles to be opened, checked for chockages, cleaned and fitted back 205 1013 nco2 fire fighting system ( d ) overhaul of relief valve assembly 206 1013 nco2 fire fighting system ( e ) overhaul of pressure operated switch 207 1013 nco2 fire fighting system ( f ) complete co2 system piping to be blown through using hp air to prove system free of blockages 208 1013 nco2 fire fighting system ( g ) co2 cylinders ( 45 kg capacty ) and system pipes to be painted as per coding post work completion. 209 1013 nco2 fire fighting system n ( h ) all system pipes ( dia 20 mm ) to be painted as per coding post work completion. 210 1013 nco2 fire fighting system ( j ) renewal of flexible hoses as per sample ( pr 275bar ) 211 1013 nco2 fire fighting system ( k ) actuator to be overhauled operated by n2 212 1013 nco2 fire fighting system n ( l ) solenoid to be checked for operation and renewed if declared ber. 213 1013 nco2 fire fighting system n ( m ) both nitrogen cylinders to be removed, chemically cleaned, pressure tested and recharged with 10 ltr n2 each 214 1013 nco2 fire fighting system ( n ) pr gauges to be renewed, make wikarange 400 kg / cm2 215 1013 nco2 fire fighting system n ( p ) pr gauges to be renewed, make wikarange 200 kg / cm2 216 1013 nco2 fire fighting system ( q ) undertake testing of the co2 system as follows: 217 1013 nco2 fire fighting system n ( i ) lamp checks of various indication in the control panel. replace if defective 218 1013 nco2 fire fighting system ( ii ) open pilot control box to check indication on the panel 219 1013 nco2 fire fighting system ( iii ) check klaxon horn and strobe comes on. 220 1013 nco2 fire fighting system ( iv ) check hooter and fire detector replace if defective. 221 1013 n co2 fire fighting system n ( q ) pull pressure switch knob of pr swicth for premature discharge to check indication on the panel. pull the pr switch knob for co2 discharge indication. check indication panel. the premature discharge indication shall go off. reset both the knob after this operation. the indications shoukd go off. nnote: the entire co2 system to be proved for functional checks without co2 222 1014 n misc renewal of flexible hoses on discharge side of hand pump. dia 65 mm , length 05 mtr each 223 1015, nmisc sounding caps of tanks damaged to be opened, manufactured as per sample 224 1016 n misc cleaning / renewal of sight glass of ru tank. overhaul spring loaded check valve of both tanks. joints to be renewed and fitted back. 225 1017 nmisc nquick shut off valves of the fuel tanks to be overhauled. arrangement of the system involved to be overhauled for operating from remote position. ( deck ) 226 1018 nmisc hydrant v / v and fire hydrants to be overhauled and made operational dia 50 mm 227 electrical defect list n neqpt / system: 3ph 3wire sine wave invertor;ac input 415v, 3ph;dc input 360v;ac out put 415v, 3ph, sine wave 228 2001 ninverter ncarry out overhauling / checking / fault rectification of invertor and made it operational.presently mother board is not working. 229 2002 nbatteries nrenew the sealed maintance free lead acid batteries2000ah, 12v. make: exide 230 2003, neqpt / system:msb nmsb n ( a ) msb to be overhauled ( includes defective switches to be renwed, perished control wiring to be renewed with crimping of proper lugs, marking sleeves to be put on control wiring and loose wirng to be tied with cable ties ) ( presently there is no deffective parts, all components are working. ) . carryout routines mentioned below and prove them for satisfactory performance. ( calibration certificates / test reports from nabl recognised labs are to be submitted. ) n n n n 231 2003 , neqpt / system:msb n msb n ( b ) de energise switchboard. remove all busbars, insulators, cts, pts, junction boxes, switch contact surfaces, fuse bases / carriers and other components. clean and decarbonise the busbar using soft brush / calico cloth dipped in alcohol. thoroughly clean and ascertain the soundness of these components. repair / replaced them as required. 232 2003 neqpt / system:msb n msb ( c ) inspect cables and bus bar . replace all defective cables, wirings, lugs and termination. tighten electrical connections and fasteners ( cable 100 mtr, 1 sqm for 02 sections ) 233 2003, neqpt / system:msb nmsb ( d ) apply loctite ( or equivalent compound ) to all loose screw / nuts of breaker asemblies. 234 2003 neqpt / system:msb n msb ( e ) examine actuating mechanism and condition of contacts. carry out repairs / cleaning / lubrication of all mechanical parts and contacts and check for satisfactory operations 235 2003 neqpt / system:msb n msb ( f ) rubber mat : insulating rubber mat deteriorated. to be renewed with oil resistance & very high voltage resistance electrical rubber mat in front of msb. ( thickness 3mm ) make vardhaman model class c 236 2004 nbattery charging system provide battery chargering system 12v, dc from shore supply system for dg starting battery 1no at 1 deck, & sullage pump engines starting batteries 12v, 180ah 4 nos at pump room 237 2005 nnav lights nrenew the port navigational light fitting two stair type ( 230v, ac & 24v dc ) 238 2006 ndynamos n over hauling 12v, dc dynamos make:tvs 239 2007 nstarters nover hauling of self starters 12v, 3hp dc make:tvs 240 2008 ndg starting system ncarry out overhauling / checking / fault rectification of engine control & starting wiring system and made it operational.renew the any deffective parts ( presently all working ) 241 2009 nmisc renew the3core 25 sq.mm multy stand copper marine shore supply cable. 242 2010 neqpt / system: shore supply pannel n shore supply panel carry out overhaul of shore supply pannel.required to renew the window glass ( 8x8 ) 243 2011 neqpt / system: motors n motors carry out overhaul of 2 in nos blower motors 415v.3ph, 3hp 1no, 230v, 1ph, .25hp 1no 244 2012 neqpt / system: ship name board nmisc n ( a ) renew the acrylic 4mm sheet for name board size:4x2.5 245 2012 neqpt / system: ship name board nmisc ( b ) renew the led tube lights 20w, 2, 230v ac 246 2013 neqpt / system: wall mounted fans nmisc nrenew the wall mounted fans 300mm sweep, 230v make:bajaj / philps 247 2014 neqpt / system:flood lights nmisc renew the led flood lamp 230v, 200w 248 dry dock and allied services work packages n n ( a ) docking and undocking charges ( both versions ) 249 ( b ) dock blocks preparation & laying out as per docking plan 250 dock hire charges for an estimated duration of 60 days as per ocr 251 wet basin / alongside hire charges for the remaining duration ( i.e. total refit duration of – 60 days docking period ) 252 provision of sufficient lighting for duty staff 253 quote for maintenance of two in no. fire lines for the refit duration . 254 provision of two transports ( cars ) for entire refit duration ( one for refit co ordinating staff and one for nd ( v ) monitoring team ) for 12 hrs or 100km / day whichever is less 255 provision of stationory / office items for nd ( v ) / refit monitoring team for entire refit duration period.cater budget of rs 2000 / per month.requirement will be intimated rmt / ndv on as requirement basis.payment at actuals. nnote: firms to quote. 256 mail man services ( 02 nos ) for entire refit duration ( one for user department and one for planning / co ordinating department ) to be provided for 10 hrs per day 257 qc inspection for the entire scope of work by third party irs / lrs / abs / qc / tpi for the refit duration as per the qis....

Indian Navy - Andhra Pradesh

22486799 tender for offloading nr of sullage barge=1 work pakage for nr sb i nhull defect list n001 ndocking nvessel to be docked in both versions. nnote 1: firms not to quote view docking, undocking and dock blocks preparation will be done by navy and the job is required to be carried out in navy premises ( i.e nd ( v ) slipway / drydock ) . nnote 2: last docked in version i on 22 aug 2017 n 2 002 cleaning of under water hull and boot top area hp jet cleaning of entire under water area and boot top area ( with a pressure not exceeding 3000 psi ) remove the marine growth / barnacles and prepare for survey. note: ( i ) u / w area: 425 sqm including boot top 3 003 cleaning of internal compartments sullage tanks ( 06 nos ) manually clean fuel tanks free of accumulated fuel and residual muck and present for survey. 4 004 cleaning of internal compartments manually clean following internal compartments free of accumulated water and residual muck and present for survey. ( a ) cable locker 5 004 cleaning of internal compartments manually clean following internal compartments free of accumulated water and residual muck and present for survey. ( b ) forepeak tank 6 004 cleaning of internal compartments manually clean following internal compartments free of accumulated water and residual muck and present for survey: ( c ) cofferdam 1 7 004 cleaning of internal compartments manually clean following internal compartments free of accumulated water and residual muck and present for survey: ( d ) cofferdam 2 8 004 cleaning of internal compartments manually clean following internal compartments free of accumulated water and residual muck and present for survey: ( e ) cofferdam 3 9 004 cleaning of internal compartments manually clean following internal compartments free of accumulated water and residual muck and present for survey: ( f ) cofferdam 4 10 004 cleaning of internal compartments manually clean following internal compartments free of accumulated oily water and grime / muck and present for survey: ( g ) pump room ( bilges: 120 sqm, bulkheads:140 sqm ) 11 004 cleaning of internal compartments asp manually clean following internal compartments free of accumulated oily water and grime / muck and present for survey: ( h ) steering gear room ( bilges: 24 sqm, bulkheads:76 sqm ) 12 05 cleaning of void spaces ( 06 nos ) manually clean 06 nos void spaces of all residues and present for survey. note: cleaning to be done with detergent water, oil absorbing / removing solution or powder, rags, cotton jute etc. quote to include cost of cleaning material also. 13 006 hull survey visual survey external and internal structures carry out visual and hammer survey in accordance with no 01 / 15 of under water hull , boot top area, above water hull, super structure, weather decks and all internal compartments ( i.e. fw tanks, ballast tanks, fore peak tank, engine room, steering compartment, fo tanks, cofferdams, all stiffeners and deck fittings etc. ) all manholes to be inspected for water tightness, chalk impression test to be carried out. note: ( i ) ls for survey ( ii ) firm to submit 07 copies of hull survey report . 14 007 hull survey utg survey external and internal structures carry out utg survey in accordance with no 01 / 15 of under water hull , boot top area, above water hull, super structure, weather decks and all internal compartments ( i.e. fw tanks, ballast tanks, fore peak tank, engine room, steering compartment, fo tanks, cofferdams, all stiffeners and deck fittings etc. ) all manholes to be inspected for water tightness, chalk impression test to be carried out. note: ( i ) ls for survey ( ii ) firm to submit 07 copies of hull survey report . ( iii ) quote for utg survey points 15 008 steel renewal nquote for steel renewal at various locations as per survey report nnote : quoted repair cost shall include cost of both sides blasted and primed is 2062 grade `b’ quality steel. degutting / regutting / renewal of all obstructions in way of steel renewals including lagging / panelling, minor fittings / equipments with their foundations, ventilation systems, staging etc., as indicated by survey team / rmt, proving of the weld runs by non destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal was undertaken etc. 16 009 build ups n ( a ) carry out build ups as indicated by the hull survey team / surveyor size 25 x 25 mm 17 009 build ups n ( b ) carry out build ups as indicated by the hull survey team / surveyor size 50 x 50 mm 18 010 fairing of deformed structure n carryout fairing of deformed structures as indicated by hull survey team / surveyor 19 011 re welding ncarry out re welding runs on weld seams as indicated by hull survey team / qc / rmt. 20 012 draft marks ndraught marks corroded / eaten away, to be renewed and painted. both roman and numeric. 21 013 sacrificial anodes n ( a ) renew sacrificial anodes those consumed more than 50% type: mk i note: anodes will be supplied by navy / coy. 22 013 sacrificial anodes n ( b ) renew sacrificial anodes those consumed more than 50% type: mk vi note: anodes will be supplied by navy / coy. 23 014 surface preparation under water area nsurface preparation to sa 2.5 std using grit blasting on paint damaged areas / renewed plate areas as per the paint oem rep recommendation for paint application. ( areas include c channel for rubber fenders ) 24 015 painting under water area jotun scheme. paint under water area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( a ) 1st coat: primer penguard primer 50 microns 25 015 painting under water area jotun scheme. paint under water area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( b ) 2nd coat: anti corrosive jotacote universal ( aluminium ) 150 microns 26 015 painting under water area jotun scheme. paint under water area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( c ) 3rd coat: anti corrosive jotacote universal ( grey ) 150 microns 27 015 painting under water area jotun scheme. paint under water area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( d ) 4th coat: tie coat: safeguard es 125 microns 28 015 painting under water area painting jotun scheme. paint under water area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( e ) 5th coat: a / f: seaquantum ultra ( brown / light red ) 150 microns 29 015 painting under water area jotun scheme. paint under water area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( f ) 6th coat: a / f: seaquantum ultra ( red brown / dark red ) 150 microns 30 015 painting under water area jotun scheme. paint under water area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( g ) 7th coat: a / f: seaquantum ultra ( brown / light red ) 150 microns 31 016 surface preparation boot top area nsurface preaparation to sa 2.5 standards using grit blasting on paint damaged areas / renewed plate areas as per the paint oem rep recommendation for paint application. ( areas include c channel for rubber fenders ) 32 017 painting boot top area jotun scheme. paint boot top area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( a ) 1st coat: primer penguard primer 50 microns dft 33 017 painting boot top area jotun scheme. paint boot top area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( b ) 2nd coat: anti corrosive jotacote universal ( aluminium ) 150 microns dft 34 017 painting boot top area jotun scheme. paint boot top area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( c ) 3rd coat: anti corrosive jotacote universal ( grey ) 150 microns dft 35 017 painting boot top area jotun scheme. paint boot top area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( d ) 4th coat: tie coat: safeguard es 125 microns dft 36 017 painting boot top area jotun scheme. paint boot top area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( e ) 5th coat: a / f: seaquantum ultra ( brown / light red ) 150 microns dft 37 017 painting boot top area jotun scheme. paint boot top area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( f ) 6th coat: a / f: seaquantum ultra ( red brown / dark red ) 150 microns dft 38 017 painting boot top area jotun scheme. paint boot top area with following paint scheme. note: quoted repair cost shall be inclusive of cost of paints also. ( g ) 7th coat: a / f: seaquantum ultra ( black ) 150 microns dft 39 018 surface prepartion above water area and bulwark including guardrails carry out mechanical cleaning to st3 standard for paint application as per survey report by paint oem rep 40 019 painting above water area and bulwark including guardrails jotun scheme. paint above water area with following paint scheme.note: quoted repair cost shall be inclusive of cost of paints also ( a ) 1st coat: penguard primer 50 microns dft 41 019 painting above water area and bulwark including guardrails jotun scheme. paint above water area with following paint scheme.note: quoted repair cost shall be inclusive of cost of paints also ( b ) 2nd coat: jotamastic 80 ( grey / red brown ) 125 microns dft 42 019 painting above water area and bulwark including guardrails jotun scheme. paint above water area with following paint scheme.note: quoted repair cost shall be inclusive of cost of paints also ( c ) 3rd coat: jotamastic 80 ( grey / red brown ) 125 microns dft 43 019 painting above water area and bulwark including guardrails jotun scheme. paint above water area with following paint scheme.note: quoted repair cost shall be inclusive of cost of paints also ( d ) 4th coat: hard top xp grey 60 microns dft 44 020 surface prepartion super structure and deck fittings carry out mechanical cleaning to st3 standard as per survey report of paint oem for paint application. 45 021 painting super structure and deck fittings jotun scheme. paint superstructure area with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( a ) 1st coat: primer penguard primer 50 microns dft 46 021 painting super structure and deck fittings jotun scheme. paint superstructure area with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also ( b ) 2nd coat: jotamastic 80 ( red ) 125 microns dft 47 021 painting super structure and deck fittings jotun scheme. paint superstructure area with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also ( c ) 3rd coat: jotamastic 80 ( grey ) 125 microns dft 48 021 painting super structure and deck fittings jotun scheme. paint superstructure area with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also ( d ) 4th coat: hard top xp grey 7040 60 microns dft 49 022 surface prepartion weather decks carry out hydro jet blasting of entire weather deck, bridge deck and flag deck to sa 2.5 standards. 50 023 painting paint weather decks jotun scheme. paint weather decks with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( a ) 1st coat: primer penguard primer 50 microns dft 51 023 painting paint weather decks jotun scheme. paint weather decks with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( b ) 2nd coat: jotamastic 87 150 microns dft 52 023 painting paint weather decks jotun scheme. paint weather decks with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( c ) 3rd coat: jota armour 800 microns dft 53 024 surface prepartion internal compartments fore peak tank, cable locker and cofferdam carry out mechanical cleaning to st 3 standard as per survey report of paint oem for fore peak tank , cable locker and cofferdam ( 04 ) . 54 025 painting fore peak tanks, ballast tanks and cable locker jotun scheme. paint fore peak tanks, ballast tanks and cable locker with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( a ) 1st coat: primer penguard primer 50 microns dft 55 025 painting fore peak tanks, ballast tanks and cable locker jotun scheme. paint fore peak tanks, ballast tanks and cable locker with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also ( b ) 2nd coat: anticorrosive balloxy hb light ( bieze ) 150 microns 56 025 painting fore peak tanks, ballast tanks and cable locker jotun scheme. paint fore peak tanks, ballast tanks and cable locker with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also ( c ) 3rd coat: anticorrosive balloxy hb light ( grey ) 150 microns 57 026 surface prepartion internal compartments pump room and asp compartment including bilges carry out mechanical cleaning to st 3 standard as survey report of paint oem for paint application. ( i ) pump room ( bilges 120 sqm, bulkheads 140 ) ( ii ) asp ( bilges 24 sqm, bulkheads 76 ) 58 027 painting machinery bilges jotun scheme. paint bilges of pump room and asp compartment with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( a ) 1st coat: primer penguard primer 50 microns dft 59 027 painting machinery bilges jotun scheme. paint bilges of pump room and asp compartment with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( b ) 2nd coat: anticorrosive jotacote universal ( aluminium ) 150 microns 60 027 painting machinery bilges jotun scheme. paint bilges of pump room and asp compartment with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( c ) 3rd coat: anticorrosive jotacote universal ( grey ) 150 microns 61 027 painting machinery bilges jotun scheme. paint bilges of pump room and asp compartment with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( d ) 4th coat: penguard top coat 50 microns. 62 028 painting bulkheads of pump room and asp jotun scheme. paint bulkheads and deckheads of pump room and asp compartments with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( a ) 1st coat: primer penguard primer 50 microns dft 63 028 painting bulkheads of pump room and asp jotun scheme. paint bulkheads and deckheads of pump room and asp compartments with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( b ) 2nd coat: interior fire retardent paint 100 microns 64 028 painting bulkheads of pump room and asp jotun scheme. paint bulkheads and deckheads of pump room and asp compartments with following paint scheme: note: quoted repair cost shall be inclusive of cost of paints also. ( c ) 3rd coat: interior fire retardent paint 100 micron 65 029 cleaing of ru tanks cleaning of fuel oil ru tanksmanually scrap and clean to bare metal and apply two coats of om 750 oil in following tanks: fuel oil ru tanks ( 02nos ) note: quoted cost shall be inclusive of cost of oil also. 66 030 surafce prepartion bulkheads, decks and dadoes of internal compartments carry out mechanical cleaning of all stores ( naval stores, battery stores, co2 room, paint stores, pump store, deck store and eletrical control room ) to st 3 standard as survey report of paint oem for paint application. 67 031 painting internal compartments decks and dadoes jotun scheme. carry out painting of internal compartments decks and dadoes at following locations: naval store, battery store, co2 room, paint store, pump store, deck store and eletrical control room. ( a ) 1st coat: primer penguard 1x50 microns 68 031 painting internal compartments decks and dadoes jotun scheme. carry out painting of internal compartments decks and dadoes at following locations: naval store, battery store, co2 room, paint store, pump store, deck store and eletrical control room. ( b ) 2nd coat : jotamastic 80 grey 1 x 150 microns 69 031 painting internal compartments decks and dadoes jotun scheme. carry out painting of internal compartments decks and dadoes at following locations: naval store, battery store, co2 room, paint store, pump store, deck store and eletrical control room. ( c ) 3rd coat ; burnswick green finishing paint 100 microns 70 032 painting internal compartments bulkheads jotun scheme. carry out painting of internal compartments bulkheads and deck heads area at following locations: naval store, battery store, co2 room, paint store, pump store, deck store and eletrical control room. ( a ) 1st coat: primer penguard 1x50 microns 71 032 painting internal compartments bulkheads jotun scheme. carry out painting of internal compartments bulkheads and deck heads area at following locations: naval store, battery store, co2 room, paint store, pump store, deck store and eletrical control room. note: quoted repair cost shall be inclusive of cost of paints also. ( b ) 1st coat: interior fire retardent paint 100 microns 72 032 painting internal compartments bulkheads jotun scheme. carry out painting of internal compartments bulkheads and deck heads area at following locations: naval store, battery store, co2 room, paint store, pump store, deck store and eletrical control room. note: quoted repair cost shall be inclusive of cost of paints also. ( c ) 2nd coat: interior fire retardent paint 100 microns 73 033 surface preaprtion void spaces carry out surface preaprtion to st 3 standards of void spaces as survey report of paint oem for paint application. 74 034 painting void spaces jotun scheme. carry out painting of 06 void spaces with following paint scheme ( a ) 1st coat penguard primer 50 microns 75 034 painting void spaces jotun scheme. carry out painting of 06 void spaces with following paint scheme ( b ) 2nd coat coat jotacoat universal ( al ) 150 microns 76 034 painting void spaces jotun scheme. carry out painting of 06 void spaces with following paint scheme ( c ) 2nd coat coat jotacoat universal ( grey ) 150 microns 77 034 painting void spaces jotun scheme. carry out painting of 06 void spaces with following paint scheme ( d ) 3rd coat t penguard top coat 50 microns 78 035 surface preaprtion sullage tanks carry out surface preaprtion to st 3 standards of all sullage tanks / fuel tanks as survey report of paint oem for paint application. 79 036 painting sullage tanks jotun paint scheme paint all sullage tanks with following paint scheme: ( a ) tankguard hb light grey 150 microns 80 036 painting sullage tanks jotun paint scheme paint all sullage tanks with following paint scheme: ( b ) tankguard hb greyish green 150 microns 81 037 anchor and anchor chain cable. anchor and anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at ndv / mfab dept. paint with black bituminous paint post survey iaw no 12 / 2001 and refit back. nnote : the job involves removal of anchors, chain cables and accessories, laying out for cleaning, painting and refitment. ( a ) anchors 03 82 037 anchor and anchor chain cable. anchor and anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at ndv / mfab dept. paint with black bituminous paint post survey iaw no 12 / 2001 and refit back. ( b ) chain cable ( dia 17.5mm ) ( i ) full shackles 08 ( ii ) half shackles 04 83 037 anchor and anchor chain cable. anchor and anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at ndv / mfab dept. paint with black bituminous paint post survey iaw no 12 / 2001 and refit back. n ( c ) swivel piece 84 037 anchor and anchor chain cable. anchor and anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at ndv / mfab dept. paint with black bituminous paint post survey iaw no 12 / 2001 and refit back. n ( d )  lug less joining shackles 85 037 anchor and anchor chain cable. anchor and anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at ndv / mfab dept. paint with black bituminous paint post survey iaw no 12 / 2001 and refit back. n ( e ) d shackles 86 037 anchor and anchor chain cable. anchor and anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at ndv / mfab dept. paint with black bituminous paint post survey iaw no 12 / 2001 and refit back. ( f ) chain stopper / compressor 87 038 anchor windlass completely strip & overhaul anchor windlass, renew brake linings, refit and prove for satisfactory operation. quoted price to include cost of liners and spares also. 88 039 bollards ( a ) twin bollard and foundation corroded and thinned. to be repaired / renewed as per hull survey report. doubler plate area 420mmx420mm, dia of pipe 219.1mm, height 1460mm, foundation area 400mmx400mmx90mm, thickness of plate 10mm towing gear securing rod dia 50mm. 89 039 bollards ( b ) towing bollard and foundatiosn corroded and thinned. to be repaired / renewed as per hull survey report. doubler plate area 420mmx420mm, dia of pipe 219.1mm, height 1460mm, foundation area 400mmx400mmx90mm, thickness of plate 10mm towing gear securing rod dia 50mm. 90 040 guardrails ( a ) fixed verticals guardrail stanchions on weather deck deformed / bent from deck. to be repaired / renewed. ( mat ms angle bar ) 91 040 nguardrails n ( b ) fixed horizontal guardrails on weather deck deformed / bent to be repaired / renewed. n ( mat ms ) 92 041 metallilc chain guardrails metallic chain guardrails of stanchions corroded to chipped and cleaned. nrenewal cost should include cost of material also. 93 042 sanitry sysytem soil pipes to be removed, chemically cleaned, pressure tested and fitted back in situ. mat: ms , dia: 04inch. ( pressure: 3kg / cm2 ) 94 043 ventilation ( a ) mushroom type natural exhaust ventilator to be removed, cleaned / overhauled and fitted back. renew if required. details mush room head dia 500 mm, height 1550 mm 95 043 ventilation ( b ) mushroom type forced supply ventilator to be removed, cleaned / overhauled and fitted back. renew if required. details mush room head dia 370 mm, height 1550 mm, 96 044 drainage system drain pipe leading from mast deck to 01 deck and no. 1 deck to engine room corroded, thinned and holed, to be renewed. mat: gi, 03 inch dia. 97 045 sanitry system sanitry fittingss in crew bathrooms and wc. ( a ) ss wash basin to be renewed. note: quoted repair cost shall include cost all items / spares. ( a ) wash basin 98 045 sanitry system sanitry fittingss in crew bathrooms and wc. sanitry fittings in crew bathrooms and wc to be renewed. ( b ) provision ss tap: 1 / 2 inch 99 045 sanitry system sanitry fittingss in crew bathrooms and wc. ( c ) ss supply pipeline broken / damaged to be renewed / repaired. mat : cu ni, dia: ½ inch 100 045 sanitry system sanitry fittingss in crew bathrooms and wc. ( d ) drain pipeline broken / damaged to be renewed / repaired. mat ms, dia 2 inch 101 045 sanitry system sanitry fittingss in crew bathrooms and wc. ( e ) flush valves to be renewed. mat brass, dia 2 102 046 fresh water system crew bathrooms and wc. .note: quoted repair cost shall include cost all items / spares. ( a ) ss stop cock 1’’ to be renewed 103 046 fresh water system crew bathrooms and wc. ( b ) shower head to be fitted in bathrooms note: quoted repair cost shall include cost all items / spares. 104 047 tyre fenders tyre fender damaged on p&s side , to be renwed with used aircraft tyre fenders moulded with 8 mm white natural rubber. mat rubber, colour white . no painting or coating of any other form will be permitted. vendors to adhere to sow ( a ) od 750mm; id 450 mm , width 250 mm 105 047 tyre fenders provision of securing arrangment in all tyre fenders for fitment on ship side. ( b ) chain securing brackets / deck eyes. 106 047 tyre fenders provision of securing arrangment in all tyre fenders for fitment on ship side ( c ) provission of securing chain. 16 mm dia for tyre fenders 107 047 tyre fenders provision of securing arrangment in all tyre fenders for fitment on ship side ( d ) bush for passing chain on tyres. 108 047 tyre fenders provision of securing arrangment in all tyre fenders for fitment on ship side ( e ) provision of d shackles for tyre fenders 109 048 d shape fenders ( a ) d shaped rubber fenders damaged / perished to be renewed. color grey / white length 1000 mm length location 44 on shipside and 05 on transom material epdm rubber as per nes170 110 048 d shape fenders securing brackets ( b ) fender securing flat bar brackets to be repaired / renewed as necessasry. ( mat ms ) . nsize : 1100mm x 110mm x 08mm 111 048 d shape fenders securing brackets ( c ) fender securing c clamp brackets to be repaired / renewed as necessasry. ( mat ms ) . size : 200mm x 110mm x 08mm 112 049 pneumatic fender. ( a ) provision of pneumatic fender on ( p & s ) side at fwd and aft specification of fenders: size 660x1160 mm , mat neoprene blended rubber having 65 % min neoprene content , colour white, tensile strength 180 kgf / cm2, elongation at break 400 % min, hardness 700 max, tear strength min 40 kgf / cm2, compression set 30 % max, abrasion resistance 0.5 cc max. n 113 050 pneumatic fender securing arrangement ( a ) fabrication of ms eye with 08 mm thickness on shipside. 114 050 pneumatic fender securing arrangement ( b ) provision of d shackles, dia 16 mm 115 050 pneumatic fender securing arrangement ( c ) provision of securing chain 16 mm dia length rmt 4 mtr each 116 051 sky light ss butterfly nuts and tumbler bolt of engine room sky light &exhaust flaps broken. to be renewed. dia of bolt : 10 mm & 6 inch length ( mat ms ) . 117 052 rubber beading rubber beading of following doors, hatch and skylight perished / cracked to be renewed and chalk test to be proved. ( epdm rubber with shore hardness 50 + 5o a ) ( a ) wt door 118 052 rubber beading rubber beading of following doors, hatch and skylight perished / cracked to be renewed and chalk test to be proved. ( epdm rubber with shore hardness 50 + 5o a ) ( b ) wt hatch 119 053 apt air pressure test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg / cm2. nnote: apt and proving of those tanks wherein steel renewal undertaken as part of steel renewal dl. 0003 ( c ) above is that of firms liability with no additional cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this dl. serial. ( a ) forepeak tanks 120 053 apt air pressure test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg / cm2. nnote: apt and proving of those tanks wherein steel renewal undertaken as part of steel renewal dl. 0003 ( c ) above is that of firms liability with no additional cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this dl. serial. ( b ) fuel / sullage tank 121 053 apt air pressure test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg / cm2. nnote: apt and proving of those tanks wherein steel renewal undertaken as part of steel renewal dl. 0003 ( c ) above is that of firms liability with no additional cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this dl. serial. ( c ) void space 122 053 apt air pressure test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg / cm2. nnote: apt and proving of those tanks wherein steel renewal undertaken as part of steel renewal dl. 0003 ( c ) above is that of firms liability with no additional cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this dl. serial. ( d ) cable locker 123 053 apt air pressure test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg / cm2. nnote: apt and proving of those tanks wherein steel renewal undertaken as part of steel renewal dl. 0003 ( c ) above is that of firms liability with no additional cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this dl. serial. ( e ) cofferdams 124 054 bilge paltform ( a ) renew bilge platform plate. material aluminium chequerd plate, thickness 05 mm 125 054 bilge platform ( b ) supporting brackets to be renewed where ever required ( mat ms ) . securing nut&bolts to be of mat ss. 126 055 cleats ms cleats perished / thinned to be renewed ( size 28 mm ) . quote shall includes nuts bolts and associated accessories 127 056 ventilation system ( a ) breather pipes of various tanks on upper deck corroded and thinned including wire mesh, to be repaired / renewed. ( mat. gi pipe ) pipe dia 2 1 / 2 inch 128 056 ventilation system ( b ) deck distance piece and flanges corroded to be renewed including rubber joints. dia 150mm 129 056 ventilation system ( c ) ventilation trunking wire mesh to be renewed at damaged areas. size: 400mmx600mm 130 057 deck underlay dry compatments deck underlay ( macrotech ) to be repaired / renewed at uprooted / damaged / steel renewed, accommodation areas, wheel house and alleways. ( a ) surface preparation and application of erop. and mass 98. 131 057 deck underlay dry compatments deck underlay ( macrotech ) to be repaired / renewed at uprooted / damaged / steel renewed, accommodation areas, wheel house and alleways.. ( b ) surface preparation to be carried out by buffing on mass 98 and application of mass 96. 132 057 deck underlay dry compatments deck underlay ( macrotech ) to be repaired / renewed at uprooted / damaged / steel renewed, accommodation areas, wheel house and alleways.. ( c ) surface preparation and application of sealer coat on entire area 133 058 deck underlay wet compartments deck underlay ( macrotech ) to be repaired / renewed in bathrooms at uprooted / damaged / steel renewed. ( a ) surface preparation and application of erop. and mass 98. 134 058 deck underlay wet compartments deck underlay ( macrotech ) to be repaired / renewed in bathrooms at uprooted / damaged / steel renewed. ( b ) surface preparation to be carried out by buffing on mass 98 and application of mass 96. 135 058 deck underlay wet compartments deck underlay ( macrotech ) to be repaired / renewed in bathrooms at uprooted / damaged / steel renewed. ( c ) surface preparation and application of sealer coat on entire area 136 059 deck underlay dadoe area deck underlay ( macrotech ) to be repaired / renewed in bathrooms. ( a ) surface preparation and application of erop. and mass 98. 137 059 deck underlay dadoe area deck underlay ( macrotech ) to be repaired / renewed in bathrooms. ( b ) surface preparation to be carried out by buffing on mass 98 and application of mass 96. 138 059 deck underlay dadoe area deck underlay ( macrotech ) to be repaired / renewed in bathrooms. ( c ) surface preparation and application of sealer coat on entire area 139 060 wt hatches wt hatch clips to be removed, cleaned, greased and refitted wt hatch ( 0.6m x 0.6m ) 140 061 wt doors wt door clips to be removed, cleaned, greased and refitted wt doors 141 062 nwt nwt wooden door of wheel house perished, to be repaired / renewed including cylindrical door lock. 142 063 manhole rubber joints perished, to be renewed ( a ) joints 143 063 manhole ( b ) studs of manholes perished, to be renewed ( only defective studs to be renewed as per survey report ) ms studs with nut, size 20 mm 144 063 manhole ( c ) manhole covers corroded / thinned. to be renewed. mat is 2062 grade b steel. size 2 x 1.5 145 064 locking arrangment ( a ) mortise locks in accomodation areas defective to be renewed. 146 064 locking arrangment ( b ) ms hasp staple / locking arrangemet on ms door and hatches corroded / broken / damaged to be renewed as per sample fitted. 147 065 name board following name board perished / damaged, to be renewed / repaired. ( a ) repair / renewal of vessel name board including electroplating to be carried out on ship side 02 148 065 name board following name board perished / damaged, to be renewed / repaired. ( b ) vessel illuminated board with perspex sheet 01 149 065 name board following name board perished / damaged, to be renewed / repaired. ( c ) painting of vessel name on bulwark / ship side in both hindi and english with fluorescent paint 02 150 066 furniture ( a ) crca kit lockers perished , to be renewed ( 90x80x45 cm ) 151 066 furniture ( b ) crca standing lockers perished, to be renewed ( 183x40x45 cm ) 152 066 furniture ( c ) chairs in crew accomadation persihed / damaged , to be renewed 153 066 furniture ( d ) wooden table damaged / pershed to be renewed 154 066 furniture ( e ) wood paneling in crew rest room and wheel house damged / perished, to be renewed 155 engineering defect list n nsullage pump engine, make: m / s greaves, model: 3twa, type: ( air cooled, 4 stroke, vertical inline, diesel fuelled ) , sl no: ( port 1108031010027, stbd 1108031010026 ) rating: 25hp, rpm: 1500 156 1001 nsullage pump engine ( a ) renewal of flexible hoses ( en 853 2sn wire braid, dia 15 mm, with st 1 / 4 inch, unf male x banjo 157 1001 nsullage pump engine ( b ) air intake filter to be renewed ( part no. 271 3700 14 ) 158 1001 nsullage pump engine ( c ) renewal of engine oil, oil will be supplied by navy 159 1001 nsullage pump engine ( d ) renewal of corrosion plug as per sample ( dia 10 mm, length 40 mm ) 160 1001 nsullage pump engine ( e ) renew fuel oil filters elements . ( part no. 9451 037 401& 9451 037 420 ) 161 1001 nsullage pump engine ( f ) renewal of oil filter ( part no.500 2175 19 ) 162 1001 n sullage pump engine ( g ) engine to be started for trial for 30 minutes. 163 sullage pump make: m / s tushaco pump, type: progressive, cavity screw, model: t1s 1450.1, sl no: ( port 105182 / 5212, stbd 105182 / 5211 ) , capacity: 60tph, total head 15mwc, speed 300rpm 164 1002 n sullage pump ( a ) overhauling of pumps to be done. includes removal, renewal weardown parts and fit back. 165 1002 nsullage pump ( b ) performance trial for 30 minutes post overhauling. 166 stripping pump engine, make: m / s greaves, type: air cooled, 4 stroke, electric start diesel engine, speed: 3000rpm, rating: 7.4bhp, sl no: ( port a0l0403225, stbd a0l0403224 ) 167 1003 nstripping pump engine ( a ) lub oil sump to be drained, cleaned. ( sump capacity 5 liters ) 168 1003 n stripping pump engine ( b ) renew air filter element 169 1003 n stripping pump engine ( c ) renew fuel oil filters element . 170 1003 n stripping pump engine ( d ) engine to be started for trial for 30 minutes. 171 stripping pump make: m / s b e pump, model: sh80 140n1 dgs2 316, type: horizontal, self priming, centrifugal, capacity: 60tph, total head: 15mwc, sl no: port 358898, stbd 358899. 172 1004 nstripping pump ( a ) overhauling of pumps includes removal, renewal weardown parts ( shaft, mechanical seals, impeller, gaskets ) and fitted back. 173 1004 nstripping pump ( b ) performance trial for 30 minutes post overhauling. 174 genset make: kirloskar, type: ha394, sl no: 03.2017 / 1021253, rating: 23.55kw, 32hp 175 1005 n diesel generator ( a ) renewal of flexible hoses ( en 853 2sn wire braid, dia 15 mm, with st 1 / 4 inch, unf male x banjo ) 176 1005 n diesel generator ( b ) air intake filter to be renewed. 177 1005 n diesel generator ( c ) renewal of engine oil qty 10ltr, oil will be supplied by navy 178 1005 n diesel generator ( e ) renewal of fuel filters ( pre filter µ filter element ) ( part no. 34.032.02.0 & 34.032.03.0 ) 179 1005 n diesel generator ( f ) renewal of oil filter ( part no. 03.040.19.0 ) 180 1005 ndiesel generator ( g ) engine to be started for trial for 30 minutes. 181 valve to be overhauled make vijoli, type screw down, overhauling includes renewal of wear down parts ( spindle, disc ) , mat gm 182 1006 n valves ( a ) dia 150 mm 183 1006 n valves ( b ) dia 50 mm 184 1006 n valves ( c ) dia 15 mm 185 1006 n valves ( d ) dia 80 mm 186 rubber expansion bellow ( with flange ) to be renewed. working pr 5 bar, fluid sullage oil 187 1007 nbellows ( a ) dia 150 mm 188 1007 nbellows ( b ) dia 80 mm 189 three way plug cock to be overhauled, mat ss 190 1008 ncocks ( a ) dia 150 mm 191 1008 ncocks ( b ) dia 80 mm 192 semi rotary hand pump to be overhauled make venus, model n97 193 1009 n hand pumps ( a ) pump to be overhauled includes renewal of wear down parts. 194 1009 nhand pumps ( b ) wooden handled to be renewed. 195 1010 noverhauling of system v / v nvalves ( a ) sdnr globe v / v . dia 150 mm 196 1010 noverhauling of system v / v nvalves ( b ) sdnr globe suction v / v of sullage tank. dia 80 mm 197 1011 nrelief valve 80mm dia relief valve to be removed, overhauled, calibrate ( pr 04bar ) and fitted back. 198 glycerine filled bourden pr gauges to be renewed, make an instruments 199 1012 npr. gauges ( a ) range: 01 to 01 kg ( suction pr gauge ) 200 1012 n pr. gauges ( b ) range: 0 to 04 kg ( discharge gauge ) 201 co2 fire fighting sytem maker: shm ship care ( all procedures to be carried as mentioned below and replace defective parts if required ) 202 1013 nco2 fire fighting system ( a ) co2 cylinders to be removed, chemically cleaned, pressure tested and recharged with 45kg co2 203 1013 nco2 fire fighting system ( b ) non return valves on cylinder heads to be overhauled. 204 1013 nco2 fire fighting system ( c ) co2 discharge nozzles to be opened, checked for chockages, cleaned and fitted back 205 1013 nco2 fire fighting system ( d ) overhaul of relief valve assembly 206 1013 nco2 fire fighting system ( e ) overhaul of pressure operated switch 207 1013 nco2 fire fighting system ( f ) complete co2 system piping to be blown through using hp air to prove system free of blockages 208 1013 nco2 fire fighting system ( g ) co2 cylinders ( 45 kg capacty ) and system pipes to be painted as per coding post work completion. 209 1013 nco2 fire fighting system ( h ) all system pipes ( dia 20 mm ) to be painted as per coding post work completion. 210 1013 nco2 fire fighting system ( j ) renewal of flexible hoses as per sample ( pr 275bar ) 211 1013 nco2 fire fighting system ( k ) actuator to be overhauled operated by n2 212 1013 nco2 fire fighting system ( l ) solenoid to be checked for operation and renewed if declared ber. 213 1013 nco2 fire fighting system ( m ) both nitrogen cylinders to be removed, chemically cleaned, pressure tested and recharged with 10 ltr n2 each 214 1013 nco2 fire fighting system ( n ) pr gauges to be renewed, make wikarange 400 kg / cm2 215 1013 nco2 fire fighting system ( p ) pr gauges to be renewed, make wikarange 200 kg / cm2 216 1013 nco2 fire fighting system ( q ) undertake testing of the co2 system as follows: 217 1013 nco2 fire fighting system ( i ) lamp checks of various indication in the control panel. replace if defective 218 1013 nco2 fire fighting system ( ii ) open pilot control box to check indication on the panel 219 1013 nco2 fire fighting system ( iii ) check klaxon horn and strobe comes on. 220 1013 nco2 fire fighting system ( iv ) check hooter and fire detector replace if defective. 221 1013 n co2 fire fighting system ( q ) pull pressure switch knob of pr swicth for premature discharge to check indication on the panel. pull the pr switch knob for co2 discharge indication. check indication panel. the premature discharge indication shall go off. reset both the knob after this operation. the indications shoukd go off. nnote: the entire co2 system to be proved for functional checks without co2 222 1014 n misc renewal of flexible hoses on discharge side of hand pump. dia 65 mm , length 05 mtr each 223 1015, nmisc sounding caps of tanks damaged to be opened, manufactured as per sample 224 1016 n misc cleaning / renewal of sight glass of ru tank. overhaul spring loaded check valve of both tanks. joints to be renewed and fitted back. 225 1017 nmisc quick shut off valves of the fuel tanks to be overhauled. arrangement of the system involved to be overhauled for operating from remote position. ( deck ) 226 1018 nmisc hydrant v / v and fire hydrants to be overhauled and made operational dia 50 mm 227 electrical defect list neqpt / system: 3ph 3wire sine wave invertor;ac input 415v, 3ph;dc input 360v;ac out put 415v, 3ph, sine wave 228 2001 ninverter carry out overhauling / checking / fault rectification of invertor and made it operational.presently mother board is not working. 229 2002 nbatteries renew the sealed maintance free lead acid batteries2000ah, 12v. make: exide 230 2003, neqpt / system:msb nmsb ( a ) msb to be overhauled ( includes defective switches to be renwed, perished control wiring to be renewed with crimping of proper lugs, marking sleeves to be put on control wiring and loose wirng to be tied with cable ties ) ( presently there is no deffective parts, all components are working. ) . carryout routines mentioned below and prove them for satisfactory performance. ( calibration certificates / test reports from nabl recognised labs are to be submitted. ) n n n n 231 2003 , neqpt / system:msb n msb n ( b ) de energise switchboard. remove all busbars, insulators, cts, pts, junction boxes, switch contact surfaces, fuse bases / carriers and other components. clean and decarbonise the busbar using soft brush / calico cloth dipped in alcohol. thoroughly clean and ascertain the soundness of these components. repair / replaced them as required. 232 2003 neqpt / system:msb n msb ( c ) inspect cables and bus bar . replace all defective cables, wirings, lugs and termination. tighten electrical connections and fasteners ( cable 100 mtr, 1 sqm for 02 sections ) 233 2003, neqpt / system:msb nmsb ( d ) apply loctite ( or equivalent compound ) to all loose screw / nuts of breaker asemblies. 234 2003 neqpt / system:msb n msb ( e ) examine actuating mechanism and condition of contacts. carry out repairs / cleaning / lubrication of all mechanical parts and contacts and check for satisfactory operations 235 2003 neqpt / system:msb n msb ( f ) rubber mat : insulating rubber mat deteriorated. to be renewed with oil resistance & very high voltage resistance electrical rubber mat in front of msb. ( thickness 3mm ) make vardhaman model class c 236 2004 nbattery charging system provide battery chargering system 12v, dc from shore supply system for dg starting battery 1no at 1 deck, & sullage pump engines starting batteries 12v, 180ah 4 nos at pump room 237 2005 nnav lights renew the port navigational light fitting two stair type ( 230v, ac & 24v dc ) 238 2006 ndynamos over hauling 12v, dc dynamos make:tvs 239 2007 nstarters over hauling of self starters 12v, 3hp dc make:tvs 240 2008 ndg starting system carry out overhauling / checking / fault rectification of engine control & starting wiring system and made it operational.renew the any deffective parts ( presently all working ) 241 2009 nmisc renew the3core 25 sq.mm multy stand copper marine shore supply cable. 242 2010 neqpt / system: shore supply pannel n shore supply panel carry out overhaul of shore supply pannel.required to renew the window glass ( 8x8 ) 243 2011 neqpt / system: motors n motors carry out overhaul of 2 in nos blower motors 415v.3ph, 3hp 1no, 230v, 1ph, .25hp 1no 244 2012 neqpt / system: ship name board nmisc ( a ) renew the acrylic 4mm sheet for name board size:4x2.5 245 2012 neqpt / system: ship name board nmisc ( b ) renew the led tube lights 20w, 2, 230v ac 246 2013 neqpt / system: wall mounted fans nmisc renew the wall mounted fans 300mm sweep, 230v make:bajaj / philps 247 2014 neqpt / system:flood lights nmisc renew the led flood lamp 230v, 200w 248 dry dock and allied services work packages n n ( a ) docking and undocking charges ( both versions ) / nnote: docking and undocking will be done by navy in navy permises i.e nd ( v ) / slipway 249 ( b ) dock blocks preparation & laying out as per docking plan / nnote : job will done by navy 250 dock hire charges for an estimated duration of 60 days as per ocr / ndry dock facility will privided by navy in navy permises 251 wet basin / alongside hire charges for the remaining duration ( i.e. total refit duration of – 60 days docking period ) 252 provision of sufficient lighting for duty staff 253 quote for maintenance of two in no. fire lines for the refit duration . 254 provision of two transports ( cars ) for entire refit duration ( one for refit co ordinating staff and one for nd ( v ) monitoring team ) for 12 hrs or 100km / day whichever is less 255 provision of stationory / office items for nd ( v ) / refit monitoring team for entire refit duration period. cater budget of rs 2000 / per month. requirement will be intimated rmt / ndv on as requirement basis. payment at actuals. nnote: firms to quote. 256 nmail man services ( 02 nos ) for entire refit duration ( one for user department and one for planning / co ordinating department ) to be provided for 10 hrs per day 257 n nqc inspection for the entire scope of work by third party irs / lrs / abs / qc / tpi for the refit duration as per the qis....