East Coast Railway - Andhra Pradesh

40934059 supply of auto drain valve to ftrtil part no. 010001100 for e 70 brake system for 3 phase loco type wag9 hc electrical locomotives. [ warranty period: 30 months after the date of delivery ] ...

East Coast Railway - Andhra Pradesh

40915398 supply of bogie frame with brake rigging for wag 9 locomotive. bogie frame complete as per clw spec.no.clw / ms / 3 / bogie / 003 alt 2 or latest and drg.no.1209 01.112 202 alt nil or latest along with brake gear arrangement and details for wag9hc loco to clw drg / spec no.1209 01.116 059 alt 5 or latest and 1209 01.216 060 along with pipe line arrangement as per clw drg. no.1209 12.017 032 alt 1 or latest suitable for brake system in fitted condition [ warranty period: 30 months after the date of delivery ] ...

South Central Railway - Andhra Pradesh

40910103 supply of set of ccb items.set of ccb items.,set of check valve for ccb 1.5 brake control system consisting of 02 items. 1) check valve and stem to kbi part no. 739275 05 nos. 2) check valve to kbi part no. 778934 200 nos. [ warranty period: 30 months after the date of delivery ] , set consisting of 10 items for maintenance of ccb 1.5 brake control system as per annexure attached. [ warranty period: 30 months after the date of delivery ] , set of valve head of ccb 1.5 brake system consisting of 02 items. 1) valve feed to kbi part no. b93280 10 nos. 2) valve feed to kbi part no. k4177 100 nos. [ warranty period: 30 months after the date of delivery ] , set of piston assembly for ccb 1.5 brake system consisting of 02 items. 1) piston assembly to kbi part no. 776880 50 nos. 2) piston assembly to kbi part no. 776505 100 nos. [ warranty period: 30 months after the date of delivery ] page 1 of 4 run date/time: 28/11/2023 16:33:05dsl gooty/south central rly tender document...

South Central Railway - Andhra Pradesh

40870971 supply of set of ioh kit for m/s. faiveley make e 70 brake system. set consists of 52 items as per annexure a enclosed.set of ioh kit for m/s. faiveley make e 70 brake system. set consists of 52 items as per annexure a enclosed.,set of ioh kit for m/s. faiveley make e 70 brake system. set consists of 52 items as per annexure a enclosed. [ warranty period: 30 months after the date of delivery ]...

East Coast Railway - Andhra Pradesh

40859192 supply, commissioning & installation of battery operated motor trolley for broad gauge track inspection with following technical specifications 1. pay load capacity: 1 ton ( 2 ) wheels: mild steel wheels with 320 mm dia ( 3 ) transmission: through automatic gear box ( 4 ) battery : 48 volt lithium battery, minimum 80 ah ( indigenous ) . ( 5 ) drive : bldc electric motor minimum 1800 watt with controller and converter. ( 6 ) charger : 25 amperes ( indigenous ) ( 7 ) brakes: drum brake system ( 8 ) base frame: stainless steel tubes ( 9 ) axle: 38 mm diameter, ms & ss made ( 10 ) bearings : bearings made from reputed isi manufacturers like skf & nrb ( 11 ) seating arrangement: comfortable 3 chairs made with stainless steel shall be arranged in front row & 3 seater sofa in second row additional seating for 3 persons shall be arranged at the back. ( 12 ) canopy: ss pipe 25 x25mm & canvas roof cover ( 13 ) running range with fully charged batteries 80km to 100 km ( 14 ) speed: maximum speed 30 kmph. [ warranty period: 30 months after the date of delivery ] ...

South Central Railway - Andhra Pradesh

40819899 supply of set of dummy plates to pb & pbps for e 70 brake system as follows. 1) pressure switch as per m/s. ftrtil part/ component no. ft0053851 001 4(sgc 9 22 64). qty/set. = 01 no. 2) parking braking valve as per m/s. ftrtil part/ component no. ft0053851 000 4(sgc 10 9 22 28). qty/set. = 01 no.set of dummy plates to pb & pbps for e 70 brake system as follows. 1) pressure switch as per m/s. ftrtil part/ component no. ft0053851 001 4(sgc 9 22 64). qty/set. = 01 no. 2) parking braking valve as per m/s. ftrtil part/ component no. ft0053851 000 4(sgc 10 9 22 28). qty/set. = 01 no.,set of dummy plates to pb & pbps for e 70 brake system as follows. 1) pressure switch as per m/s. ftrtil part/ component no. ft0053851 001 4(sgc 9 22 64). qty/set. = 01 no. 2) parking braking valve as per m/s. ftrtil part/ component no. ft0053851 000 4(sgc 10 9 22 28). qty/set. = 01 no. [ warranty period: 30 months after the date of delivery ]...

South Central Railway - Andhra Pradesh

40799129 supply of secondary brake beam for bmbs suitable to the knorr bremse make brake system conforming to rdso spec no. wd 23 bmbs 2008, rev. 1 with amend.1 of sept 2016. to rdso drg no : wd 08093 s / 2, item 2 alt 3. [ warranty period: 36 months after the date of delivery ] ...

South Central Railway - Andhra Pradesh

40798399 supply of pin brake head for bmbs suitable to the knorr bremse make brake system conforming to rdso spec no. wd 23 bmbs 2008, rev. 1 with amend. 1 of sept 2016 to rdso drg no : wd 08093 s 2, item 8 alt 3. [ warranty period: 36 months after the date of delivery ] ...

South Central Railway - Andhra Pradesh

40791205 supply of cock dh7 te for knorr bremse make air brake system.cock dh7 te for knorr bremse make air brake system., cock dh7 te for knorr bremse make air brake system and wsp of lhb coaches as per m / s kbi part no. i88738 drg to kbipl. [ warranty period: 30 months after the date of delivery ] carr. repair stores / tpty, andhra pradesh 12.00 numbers...

South Central Railway - Andhra Pradesh

40787435 supply of set of ccb items.set of ccb items.,set of check valve for ccb 1.5 brake control system consisting of 02 items. 1) check valve and stem to kbi part no. 739275 05 nos. 2) check valve to kbi part no. 778934 200 nos. [ warranty period: 30 months after the date of delivery ] , set consisting of 10 items for maintenance of ccb 1.5 brake control system as per annexure attached. [ warranty period: 30 months after the date of delivery ] , set of valve head of ccb 1.5 brake system consisting of 02 items. 1) valve feed to kbi part no. b93280 10 nos. 2) valve feed to kbi part no. k4177 100 nos. [ warranty period: 30 months after the date of delivery ] , set of piston assembly for ccb 1.5 brake system consisting of 02 items. 1) piston assembly to kbi part no. 776880 50 nos. 2) piston assembly to kbi part no. 776505 100 nos. [ warranty period: 30 months after the date of delivery ] page 1 of 4 run date/time: 24/11/2023 11:21:55dsl gooty/south central rly tender document...

East Coast Railway - Andhra Pradesh

40762727 supply of auto drain valve to ftrtil part no. 010001100 for e 70 brake system for 3 phase loco type wag9 hc electrical locomotives. [ warranty period: 30 months after the date of delivery ] ...

South Central Railway - Andhra Pradesh

40740712 supply of primary brake beam for bmbs suitable to the knorr bremse make brake system conforming to rdso spec no. wd 23 bmbs 2008, rev. 1 with amend. 1 of sept 2016. to rdso drg no : wd 08093 s / 2, item 1 alt 3. [ warranty period: 36 months after the date of delivery ] ...

South Central Railway - Andhra Pradesh

40726313 supply of computer controlled brake system (ccb 2.0) including drivers vigilance control device for wag9/wap7 electric locos as per rdso approved kb piping diagram ta35177/11 wag9 to clw specn.no.clw/ms/3/001 alt 17 & scope of supply as per attached annexure a.computer controlled brake system (ccb 2.0) including drivers vigilance control device for wag9/wap7 electric locos as per rdso approved kb piping diagram ta35177/11 wag9 to clw specn.no.clw/ms/3/001 alt 17 & scope of supply as per attached annexure a.,computer controlled brake system (ccb 2.0) including drivers vigilance control device for wag9/wap7 electric locos as per rdso approved kb piping diagram ta35177/11 wag9 to clw specn.no.clw/ms/3/001 alt 17 &...

South Central Railway - Andhra Pradesh

40719817 supply of cock ahb200nw19 for knorr bremse make air brake system and wsp of lhb coaches as per m / s knorr bremse part no. wbahb230aa002. [ warranty period: 30 months after the date of delivery ] carr. repair stores / tpty, andhra pradesh 12.00 numbers...

East Coast Railway - Andhra Pradesh

40657662 supply of ring gasket for dl filterring gasket for dl filter,ring gasket for dl filter(mr) to kbi pt.no. 757611 of ccb air brake system. [ warranty period: 30 months after the date of delivery ]...

East Coast Railway - Andhra Pradesh

40657562 supply of o ringo ring,o ring for dl filter,kbi pt no.745679. [ warranty period: 30 months after the date of delivery ] , o ring for bp filter,kbi pt no.785948. [ warranty period: 30 months after the date of delivery ] , o ring valve check (big) knorr pt no.738974 for 1.5 ccb air brake system. [ warranty period: 30 months after the date of delivery ] , o ring valve check (small) knorr pt no.751374 for 2.0 ccb air brake system. [ warranty period: 30 months after the date of delivery ]...

South Central Railway - Andhra Pradesh

40657502 supply of set of ccb items.set of ccb items.,set of check valve for ccb 1.5 brake control system consisting of 02 items. 1) check valve and stem to kbi part no. 739275 05 nos. 2) check valve to kbi part no. 778934 200 nos. [ warranty period: 30 months after the date of delivery ] , set consisting of 10 items for maintenance of ccb 1.5 brake control system as per annexure attached. [ warranty period: 30 months after the date of delivery ] , set of valve head of ccb 1.5 brake system consisting of 02 items. 1) valve feed to kbi part no. b93280 10 nos. 2) valve feed to kbi part no. k4177 100 nos. [ warranty period: 30 months after the date of delivery ] , set of piston assembly for ccb 1.5 brake system consisting of 02 items. 1) piston assembly to kbi part no. 776880 50 nos. 2) piston assembly to kbi part no. 776505 100 nos. [ warranty period: 30 months after the date of delivery ] page 1 of 4 run date/time: 15/11/2023 16:12:20dsl gooty/south central rly tender document...

East Coast Railway - Andhra Pradesh

40655574 supply of o ringo ring,o ring for dl filter,kbi pt no.735272 for 20 pipe of ccb air brake system. [ warranty period: 30 months after the date of delivery ]...

South Central Railway - Andhra Pradesh

40649457 supply of set of ioh kit for m/s. faiveley make e 70 brake system. set consists of 52 items as per annexure a enclosed.set of ioh kit for m/s. faiveley make e 70 brake system. set consists of 52 items as per annexure a enclosed.,set of ioh kit for m/s. faiveley make e 70 brake system. set consists of 52 items as per annexure a enclosed. [ warranty period: 30 months after the date of delivery ]...

East Coast Railway - Andhra Pradesh

40584011 supply of stem pistonstem piston,stem piston as per kbi pt no.774297of 20 cp for 2.0 ccb air brake system. [ warranty period: 30 months after the date of delivery ]...

East Coast Railway - Andhra Pradesh

40583925 supply of stem pistonstem piston,stem piston as per kbi pt no.774297 of bcev for 1.5 ccb of computer air brake system. [ warranty period: 30 months after the date of delivery ]...

East Coast Railway - Andhra Pradesh

40566536 supply of feed valve f 6 md 1feed valve f 6 md 1,feed valve f 6 md 1 to kbi part no. kp0698141 for ccb brake system of wag 9 hc electrical locomotives. [ warranty period: 30 months after the date of delivery ]...

South Central Railway - Andhra Pradesh

40543099 supply of set of k rings consisting of 03 items for maintenance of ccb 1.5 brake system.set of k rings consisting of 03 items for maintenance of ccb 1.5 brake system.,set of k rings consisting of 03 items for maintenance of ccb 1.5 brake system. 1) k ring to kbil part no. 454957 01 no. 2) k ring to kbil part no. 462575 01 no. 3) k rings to kbil part no. 461793 01 no. [ warranty period: 30 months after the date of delivery ]...

South Central Railway - Andhra Pradesh

40483167 supply of set of ccb items.set of ccb items.,set of check valve for ccb 1.5 brake control system consisting of 02 items. 1) check valve and stem to kbi part no. 739275 05 nos. 2) check valve to kbi part no. 778934 200 nos. [ warranty period: 30 months after the date of delivery ] , set consisting of 10 items for maintenance of ccb 1.5 brake control system as per annexure attached. [ warranty period: 30 months after the date of delivery ] , set of valve head of ccb 1.5 brake system consisting of 02 items. 1) valve feed to kbi part no. b93280 10 nos. 2) valve feed to kbi part no. k4177 100 nos. [ warranty period: 30 months after the date of delivery ] , set of piston assembly for ccb 1.5 brake system consisting of 02 items. 1) piston assembly to kbi part no. 776880 50 nos. 2) piston assembly to kbi part no. 776505 100 nos. [ warranty period: 30 months after the date of delivery ] page 1 of 4 run date/time: 03/11/2023 11:45:34dsl gooty/south central rly tender document...

South Central Railway - Andhra Pradesh

40434158 supply of set of dummy plates to pb & pbps for e 70 brake system as follows. 1) pressure switch as per m/s. ftrtil part/ component no. ft0053851 001 4(sgc 9 22 64). qty/set. = 01 no. 2) parking braking valve as per m/s. ftrtil part/ component no. ft0053851 000 4(sgc 10 9 22 28). qty/set. = 01 no.set of dummy plates to pb & pbps for e 70 brake system as follows. 1) pressure switch as per m/s. ftrtil part/ component no. ft0053851 001 4(sgc 9 22 64). qty/set. = 01 no. 2) parking braking valve as per m/s. ftrtil part/ component no. ft0053851 000 4(sgc 10 9 22 28). qty/set. = 01 no.,set of dummy plates to pb & pbps for e 70 brake system as follows. 1) pressure switch as per m/s. ftrtil part/ component no. ft0053851 001 4(sgc 9 22 64). qty/set. = 01 no. 2) parking braking valve as per m/s. ftrtil part/ component no. ft0053851 000 4(sgc 10 9 22 28). qty/set. = 01 no. [ warranty period: 30 months after the date of delivery ]...

South Central Railway - Andhra Pradesh

40416540 supply of set of single ferrule fittings, consisting of 7 items ( for air brake system of lhb coaches ) to rcf drg. no. lw36005, items 7, 9, 11, 16, 17, 18 & 19, alt a s.no. description drawing no. item no. qty. / set 1 bulkhead union lw36005, alt. `a 7 08 nos. 2 standpipe run tee do 9 04 nos. 3 bulkhead elbow do 11 08 nos 4 male stud connector do 16 08 nos. 5 union nut do 17 24 nos. 6 progressive ring do 18 24 nos. 7 standpipe elbow do 19 08 nos carr. repair stores / tpty, andhra pradesh 15.00 set...

East Coast Railway - Andhra Pradesh

40383549 supply of o ring as per kbi pt no.751374 of bcev for 1.5 ccb air brake system of hhp locomotives. [ warranty period: 30 months after the date of delivery ] , o ring as per kbi pt no.751374 of 20 cp for 2.0 ccb air brake system of hhp locomotives. [ warranty period: 30 months after the date of delivery ] , o ring as per kbi pt no.751374 of 16 cp for 2.0 ccb air brake system of hhp locomotives. [ warranty period: 30 months after the date of delivery ] , o ring as per kbi pt no.751374 of ercp for 2.0 ccb air brake system of hhp locomotive. [ warranty period: 30 months after the date of delivery ] , o ring as per kbi pt no.751374 of bpcp for 2.0 ccb air brake system of hhp locomotives. [ warranty period: 30 months after the date of delivery ] ...

South Central Railway - Andhra Pradesh

40354934 supply of junction box assembly psjb 110v for ccb 2.0 brake system as per m/s. kbil part no. 794501.junction box assembly psjb 110v for ccb 2.0 brake system as per m/s. kbil part no. 794501.,junction box assembly psjb 110v for ccb 2.0 brake system as per m/s. kbil part no. 794501. [ warranty period: 30 months after the date of delivery ]...

South Central Railway - Andhra Pradesh

40351952 supply of e 70 brake system control unit as per m/s. faiveley part no. 016001000.e 70 brake system control unit as per m/s. faiveley part no. 016001000.,e 70 brake system control unit as per m/s. faiveley part no. 016001000. [ warranty period: 30 months after the date of delivery ]...

South Central Railway - Andhra Pradesh

40307571 supply of pin cottered for bmbs suitable to the knorr bremse make brake system conforming to rdso spec no. wd 23 bmbs 2008, rev. 1 with amend. 1 of sept 2016. to rdso drg no : wd 08093 s / 2, item 12 alt 3. [ warranty period: 36 months after the date of delivery ] ...

South Central Railway - Andhra Pradesh

40292647 supply of must change kit for m/s faiveley make axle mounted disc brake systemmust change kit for m/s faiveley make axle mounted disc brake system,must change kit for m/s faiveley make axle mounted disc brake system of lhb eog coaches for m36/ss ii schedule as per annexure consisting of 15 items. [ warranty period: 30 months after the date of delivery ] carr. repair stores/tpty, andhra pradesh 5.00 set...

South Central Railway - Andhra Pradesh

40292635 supply of non asbestos basednon asbestos based,non asbestos based k type high friction composite brake block for bogie mounted brake system main line coaches, conforming to rdso specn no:c 9809 [rev. 4] to rdso drg no:rdso/sk 98066, alt:6. [ warranty period: 30 months after the date of delivery ]...

South Central Railway - Andhra Pradesh

40217727 supply of must change kit for m / s escorts make axle mounted disc brake system of lhb eog coaches for m36 / ss ii schedule consisting of 3 items, conforming to rdso specification no. rdso / 2011 / cg 04 rev 02 with complete description as per annexure enclosed in documents column. [ warranty period: 30 months after the date of delivery ] ...

South Central Railway - Andhra Pradesh

40186413 supply of must change kit for 3rd year maintenance schedule of knorr bremse make air brake system of lhb eog coaches conforming to rdso specifiction no. rdso / 2011 / cg 04, rev 2 as per attached document in tender. [ warranty period: 30 months after the date of delivery ] carr. repair stores / tpty , andhra pradesh 30.00 set...

East Coast Railway - Andhra Pradesh

40168749 supply of 1 ) control portion, er , 2 ) magnet valve for panto / ulv / sander of ccb, 3 ) control portion, 16 pipe., control portion, 16 pipe as per knorr part no.787556 1994 for ccb air brake system of wag9hc electrical locomotives. [ warranty period: 30 months after the date of delivery ] , control portion, er as per knorr part no.787776 1994 for ccb air brake system of wag9hc electrical locomotives. [ warranty period: 30 months after the date of delivery ] , magnet valve for panto / ulv / sander of ccb 2.0 brake system type as per kbi part no. i94900 / 1110 [ warranty period: 30 months after the date of delivery ] ...

East Coast Railway - Andhra Pradesh

40168705 supply of 1 ) control portion, bp , 2 ) controller assly , ebv a , 3 ) controller assembly , ebv b, controller assembly , ebv b as per kbi pt .no. 787606 1994. [ warranty period: 30 months after the date of delivery ] , controller assly , ebv a as per kbi pt.no.787605 1994 [ warranty period: 30 months after the date of delivery ] , control portion, bp as per knorr part no.787321 1994 for ccb air brake system of wag9hc electrical locomotives. [ warranty period: 30 months after the date of delivery ] ...

South Central Railway - Andhra Pradesh

40167855 supply of set of single ferrule fittings, consisting of 7 items ( for air brake system of lhb coaches ) to rcf drg. no.lw36005, items 7, 9, 11, 16, 17, 18 & 19, alt a. ( full description enclosed to the documents column ) . [ warranty period: 30 months after the date of delivery ] ...

South Central Railway - Andhra Pradesh

40138226 supply of set of ioh kit for m/s. faiveley make e 70 brake system. set consists of 52 items as per annexure a enclosed.set of ioh kit for m/s. faiveley make e 70 brake system. set consists of 52 items as per annexure a enclosed.,set of ioh kit for m/s. faiveley make e 70 brake system. set consists of 52 items as per annexure a enclosed. [ warranty period: 30 months after the date of delivery ]...

East Coast Railway - Andhra Pradesh

40098055 supply of auto drain valve to ftrtil part no. 010001100 for e 70 brake system for 3 phase loco type wag9 hc electrical locomotives. [ warranty period: 30 months after the date of delivery ] ...

South Central Railway - Andhra Pradesh

40065787 supply of set of dummy plates to pb & pbps for e 70 brake system as follows. 1 ) pressure switch as per m / s. ftrtil part / component no. ft0053851 001 4 ( sgc 9 22 64 ) . qty / set. = 01 no. 2 ) parking braking valve as per m / s. ftrtil part / component no. ft0053851 000 4 ( sgc 10 9 22 28 ) . qty / set. = 01 no. [ warranty period: 30 months after the date of delivery ] ...

South Central Railway - Andhra Pradesh

40041998 supply of must change kit for 3rd year maintenance schedule of knorr make air brake system of lhb eog coachesmust change kit for 3rd year maintenance schedule of knorr make air brake system of lhb eog coaches,must change kit for 3rd year maintenance schedule of knorr make air brake system of lhb eog coaches as specified in annexure [ warranty period: 30 months after the date of delivery ] carr. repair stores/tpty , andhra pradesh 10.00 set...

South Central Railway - Andhra Pradesh

40041944 supply of must change kit for m/s faiveley make axle mounted disc brake systemmust change kit for m/s faiveley make axle mounted disc brake system,must change kit for m/s faiveley make axle mounted disc brake system of lhb eog coaches for m36/ss ii schedule as per annexure consisting of 15 items. [ warranty period: 30 months after the date of delivery ] carr. repair stores/tpty , andhra pradesh 5.00 set...

South Central Railway - Andhra Pradesh

39886975 supply of set of ss pipe end fittings consisting of 4 items ( for air brake system ) conforming to rdso spec.no. 04 abr 2002 ( rev.01 of nov. 2017 ) & as per the following drawings. sl. no. description qty / kit ( 1 ) fix flange for 20 bore pipe to rcf drg. no. cc36900, alt nil, qty 4 nos. ( 2 ) moving flange ( for 32 nb pipe ) to rcf drg. no. cc36680, alt a, qty 2 nos. ( 3 ) elbow male & female 15 mm to rcf drg. no. cc36947, alt a item 3, qty 2 nos. ( 4 ) plug 15 mm to rcf drg. no. cc36946, alt a, item 2, qty 2 nos. [ warranty period: 30 months after the date of delivery ] carr. repair stores / tpty , andhra pradesh 86.00 set scr...

South Central Railway - Andhra Pradesh

39886964 supply of set of ss pipe end fittings consisting of 5 items ( for air brake system ) conforming to rdso spec.no. 04 abr 2002 ( rev.01 of nov. 2017 ) & as per the following drawings. s.no. description drg. no. qty / kit ( 1 ) socket for moving flange for 32mm pipe, rcf drg no. cc 36681 alt a, qty 2 nos. ( 2 ) bracket, rcf drg no. cc 36920, qty 1 no. ( 3 ) socket union 20mm ( 3 / 4 ) nb, rcf drg no. cc 36935 alt a, qty 1 no. ( 4 ) elbow equal 20mm, rcf drg no. cc 36948 alt a, item 4, qty 1 no. ( 5 ) tee equal 15 mm, rcf drg no. cc 36943 alt a, item 3, qty 4 nos. [ warranty period: 30 months after the date of delivery ] carr. repair stores / tpty , andhra pradesh 86.00 set scr...

East Coast Railway - Andhra Pradesh

39862608 supply of safety valve 3 / 4 inch to ftrtils part no. 024001000 or similar for e 70 brake system used in wag 9 type, 3 phase electric loco. [ warranty period: 30 months after the date of delivery ] ...

East Coast Railway - Andhra Pradesh

39839246 tender for annual maintenance contract of axle mounted disc brake system of m / s faiveley make in lhb coaches at coaching depot vskp for a period of three years...

East Coast Railway - Andhra Pradesh

39826447 supply of compressor check valve 1 1 / 4 inch for e70 brake system as per ftrtipl part no.002007600. [ warranty period: 30 months after the date of delivery ] amm / els / angl ( ward 60 ) , odisha 3.00 numbers ecor...

South Central Railway - Andhra Pradesh

39795632 supply of set of dummy plates to pb & pbps for e 70 brake system as follows. 1 ) pressure switch as per m / s. ftrtil part / component no. ft0053851 001 4 ( sgc 9 22 64 ) . qty / set. = 01 no. 2 ) parking braking valve as per m / s. ftrtil part / component no. ft0053851 000 4 ( sgc 10 9 22 28 ) . qty / set. = 01 no. [ warranty period: 30 months after the date of delivery ] ...

South Central Railway - Andhra Pradesh

39784433 supply of poh kit for pressure converter rlv ii for m / s knorr bremse make axle mounted disc brake system of lhb coaches consisting of 21 items as per annexure i conforming to rdso specification no. rdso / 2011 / cg 04 rev.02. carr. repair stores / tpty , andhra pradesh 10.00 set...

East Coast Railway - Andhra Pradesh

39759275 supply of bcep & mrep filter element for knorr bremse make ccb to kbi / nyab part no. 775081 or its similar for the use of microprocessor controlled air brake system. [ warranty period: 30 months after the date of delivery ] ...